[2010] VCAT 971
Victorian Civil and Administrative Tribunal
2010-05-28
Original judgment source is linked above.
Domestic building, application to make further submissions, question of whether the builder or owners contracted with the engineer, structural defects, non-structural defects, time, completion under the contract, "lock up" and the absence of eave linings, watertightness, claims for extension of time, whether the contract terminated by the owners, extensive Tribunal book.
Ratcliffe Building Group Pty Ltd (ACN: 069 349 051 (formerly C.I. Carpentry Services Pty Ltd) trading as Ratcliffe Building Group
Newlands v Ratcliffe Building Group Pty Ltd & Anor (Domestic Building) [2010] VCAT 971
The proceeding is listed for further hearing before Senior Member Lothian at 10.00 a.m. on 9 June 2010 at 55 King Street, Melbourne with an estimated hearing time of one day to enable the parties to make further submissions regarding the effect of Part IVAA of the Wrongs Act 1958 and regarding orders to give effect to the following reasons. Any application for costs and interest should also be made on that day.
Mr S.R. Grahame of Counsel (First hour of 1 December 2009 only)
In or about April 2007 the [Owners] engaged the [Engineer] to prepare engineering drawing and computations for a proposed new home for the [Owners] to be constructed at Lot 1186...
The Agreement was partly in writing and partly to be implied. Insofar as it was in writing it was comprised of documents yet to be discovered passing between the [Owners] and the [Engineer]. Insofar as it was implied it was implied by law and by such other matters as were necessary to give to the agreement such business efficacy as the parties intended it to have.
It denies the allegations contained in paragraph 3 and says that:
3.1 In or about April 2007, it was engaged by the [Builder] to prepare engineering drawings and computations for a proposed new home to, to be constructed at Lot [1186] ... (Agreement).
(a) The agreement was party oral and partly to be implied.
(b) Insofar as it was oral, it was comprised of conversations between Carlos Balmaceda for the [Engineer] and David Ratcliffe of the [Builder] in an around April 2007.
(c) In so far as it was implied, it was implied by law and by such matters as were necessary to give to the Agreement such business efficacy which the parties intended it to have.
Where pleadings are directed they define the issues. ... It would make nonsense of the process of directing pleadings in the Tribunal if ... I were now to give effect to a cause of action simply because I felt that the facts made it out even although it remained unpleaded ...
Mr Ratcliffe was not cross-examined on any of these paragraphs_._
I doubt that Mr or Mrs Newlands have never spoken to Balmaceda or had contact with anyone else at CGB Engineering, as they appear to have:
(a) Visited the office of CGB Engineering on 27 April 2007.
(b) Written a cheque for the engineering documents (owners discovered document 119).
(d) Kevin Newlands then notified me that he was in possession of the engineering documents and delivered them to me.
I did not appoint CGB Engineering. I simply liaised with them on behalf of the owners and their draftsman.
I had never had contact with CGB Engineering or Carlos Balmaceda prior to this project. I only became aware of him through the owners of the partially completed house being constructed on the adjacent Lot 1189. I enquired through the owners of this project as to who the engineer was in January 2007.
[The Owners] have discovered their cheque butt by which they made payment of [the Engineer's] fees of $880.00 on 27 April 2007.
Mr Newlands agreed under cross-examination that he had paid for the engineering design, but added that he neither collected the drawings and calculations, nor had them delivered to the Builder. On the evidence before me there is no certainty how these documents reached the Builder.
We did receive an invoice from him which I then directed to the owners and I believe they paid it.
That part C of the contract signed by the Owners and the Builder on 3 August 2007 and titled "Engineering Computations & Drawings or Other Documents to be supplied by the Owner" is varied to state "supplied by the Builder".
[The] contract was signed by my wife and I and Ratcliffe at my home, and my wife and I signed Robert Lavin's plans at Ratcliffe's office. At this stage I had no solicitors acting for me and I perused the contract myself.
Conclusion regarding who contracted with the Engineer
Structural defects- FAPoC 5(a), 5(ab), 5(ac) and 5(c)
Does the Builder share any of the responsibility for structural defects?
In the event that the Builder wishes to vary the Plans or Specifications then the following subclauses take effect:
14.5.1 The Builder shall issue to the Owner a notice describing the variation that the Builder wishes to make, providing reasons why the Builder wishes to make the variation and stating the effect the variation will have on the construction of the Works as a whole and whether a variation to any permit will be required, stating the reasonable estimate of the Builder of any delays which will be caused by the variation and specifying the cost of the variation and the effect it will have on the Contract Price;
14.5.2 The Builder may proceed to carry out the variation if the Owner signs a written consent to the variation which must have incorporated into it or attached to it the matters referred to in subclause 14.5.1.
This provision reflects the Builder's obligations under s37 of the Domestic Building Contracts Act 1995 ("DBC Act").
5.2.4 Western Wall Projection and 5.3.4 Step in building- agreed, no work required
Window sizes nominated are nominal only. Actual sizes may vary according to manufacturer. Windows to be flashed all around.
"Handedness" of windows - reversal of fixed panels and opening doors
5.3.1 Articulation joints to eastern brick wall and 5.3.2 Articulation joints between Harditex and masonry - agreed no work required
5.3.12 Sliding door frame - agreed work and cost of $232
3.2 First floor J1 beam installation - agreed no work required
3.7 Leaks from the roof top observation deck - agreed work and sum $27,063
3.8 Cantilever roof leaks - agreed scope and cost $174
3.9 Compressed sheet upstands - agreed scope and cost $862
3.10 Balcony upstands - agreed scope and cost $12,146
3.11 External wall cracks - agreed scope and cost $2,646
The cracking ought to be accepted to be the result of movement in the structure and liability be found against the engineer.
2 on OTB 634 - Balcony tiles - Atchison cost $1,414
3 on OTB634 - Water Leaks costed by Mr Atchison at $1,158
FAPoC 5(d) - $21,000 regrading pricing in David Graham's report of 28 July 2008
FAPoC 5(f), (g) and (h) - legal costs and disbursements
FAPoC 5(i) 70% of the Statutory warranty policy costs - $880.32
FAPoC 5(k) - refund of Builder's margin and 20% of construction costs - $120,000
FAPoC 5(m) - rent of $1,304 per month since 1 September 2008
FAPoC 5(n) - Increase in costs since project's intended completion $20,000
FAPoC 5(0) - Disconnection and re-installation of solar system $5,000
FAPoC 5(p) - Electrical wiring by the Owners - $5,000
FAPoC 5(q) - Rectification costs and "portal frames" - $46,702
Calco Timbers (Geelong) Pty Ltd OTB1709 - $2,600.43
Hours spent ascertaining rectification work (includes obtaining levels to all floors using laser level as shown on attached copies of plans).
When asked about this invoice, Mr Barton said that his partner (his brother) would also be unlikely to use such language and that it must have been his sister-in-law who used the expression. The invoice appears to be one made with this proceeding in mind. It does not make me confident that I can rely on it and I would not take it into account even if it were included in the amounts claimed by the Owners.
As per clause 24.3 (agreed damages for late completion of works) $250.00 per calendar week will be deducted from your last 40% claim.
As clause 24.3 requires the Builder to pay the Owners agreed damages for delay, I do not regard this note as a claim for a time extension.
Due to factors beyond our control, our anticipated 117 construction days being from placement of foundations on 6th October 2007 to 8th February 2008 will not be achieved.
This is due to a delay in receiving Revised Engineering Plans from your Engaged Engineer as requested.
We therefore claim an extension of time being 78 days.
Extension of Time Claim 21 Days Balustrade Supplier Delay
Extension of Time Claim 78 Days Owner to Supply Revised
To complete works to 2nd floor framing plan as per revised engineer's drawing from CGB Engineering, once they are received by this office.
However there is no indication of a delay claim until the letter of 18 April 2008.
The [Builder] did not complete the lock up stage in that it did not install the locks and eaves and did not complete to watertight state as stipulated in the contract.
... the stage of works when the external wall cladding and roof covering is [sic] the flooring is laid and external doors and external windows are fixed (even if those doors and windows are only temporary).
"Lock up" is also defined in s40 of the DBC Act as:
lock-up stage means the stage when a home's external wall cladding and roof covering is fixed, the flooring is laid and external doors and external windows are fixed (even if those doors or windows are only temporary)
The definition of Lock-up as defined by the Building Act does not specify that external ceilings, soffits or eaves should be lined at Lock-Up Stage but it is accepted practice within the building industry to line the areas in question.
A builder must not demand or recover or retain ... more than the percentage of the contract price listed in column 2 [of the table to s40] at the completion of a stage referred to in column 3.
The Owner and the Builder have agreed that the scope of work which the Builder is to perform under the Agreement will require an occupancy permit or a certificate of final inspection. Where there are Works which the Owner is to perform or other Works which the Builder is not to perform which would ordinarily be required to ensure the Issue of an occupancy permit for the Works, then the Builder shall obtain a certificate of final inspection from the Relevant Building Surveyor in relation to the Works in respect of that work which the Builder has completed before demanding final payment. [Emphasis added]
14.3 Tribunal Books must not simply include copies of all discovered documents.
14.5 Tribunal Books should not contain duplicate or multiple copies of the same document - any unnecessary duplication of documents may be taken into account in the exercise of the Tribunal's discretion under s109 of the Act.
I also remind them of Deputy President Aird's remarks in MX Projects Pty Ltd v Hyber Pty Ltd [3]:
I pause to mention here my concerns about the significant costs incurred by MX Projects in preparing the Tribunal Book, which now amounts to twelve volumes. The Tribunal Book, as initially filed, comprised nine volumes. It seems that all of MX Projects' discovered documents have simply been photocopied, without any consideration as to their relevance. Many of the documents are not in chronological order. In many instances, multiple copies of the same documents have been included particularly where a document has been forwarded to others by facsimile. Not only does this mean that excessive photocopy costs have been incurred but I expect the preparation costs for the parties were significant. I noted that Counsel for both parties had extracted (and referred me to) a small proportion of the documents contained in the Tribunal Book for the purpose of cross-examination.
[1] In the absence of evidence from both experts about this sum, it is estimated in accordance with Mr Croucher's report of 31 July 2008 to remove and set aside the balustrade then reinstall it, plus contingency of 10%, margin of 20%, GST of 10% to reach a figure for July 2008, and approximately 10% for increase in prices to date.
[2] Against the interests of the person who provides the contract, therefore against the Builder's interests.
Newlands
Ratcliffe Building Group Pty Ltd & Anor
(1954) 90 CLR 613