Annexure A Annexure B DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated. Decision last updated: 12 April 2024
ii. Introduction of a communal laundry.
b. Ground Floor
i. Relocation of the lift core from the southern to northern façade with an additional entry to the lift at street level.
ii. Deletion of the platform lift to suit above.
iii. Introduction of a self-raising flood barrier to lift landing for flood protection.
iv. Squaring off the curved wall adjacent to the lobby entry.
v. Introduction of a fire door between the hall and communal living room.
vi. Reduction in communal living room size from 65m2 to 57m2 to suit fire door.
vii. Introduction of a main switchboard/comms room.
viii. Addition of water meter location on the Nelson Street frontage.
ix. Relocation and reconfiguration of fire stairs.
x. Relocation of plant room to lower ground floor.
xi. Reconfiguration of G01 to suit other amendments.
xii. Modification to the Nelson Place discharge door to be above the flood level instead of below.
xiii. Deletion of the internal stairs and door to the car share space to remove flooding potential inside the building.
xiv. Rainwater reuse tank is provided in lieu of OSD under the communal open space decking.
xv. Reduction in wall height around hydrant booster from 1.6m to 1.29m.
c. Level 1-3
i. Reconfiguration of boarding rooms to suit the relocation of the lift core and fire stairs.
d. Level 4
i. Reconfiguration of boarding rooms to suit the relocation of the lift core and fire stairs.
ii. Room 401 window size increase.
iii. Addition of a handrail to Room 401 balcony.
iv. Increase the size of the manager's room to comply with the minimum size for a single lodger room.
e. Roof
i. Introduction of mechanical services including condensers to the roof area, including screening.
ii. Addition of solar panels to the roof.
iii. Increase in height by 180mm to accommodate the lift overrun.
f. Other
i. Revision to the brick banding on the Trafalgar Street ground floor façade to suit other modifications.
ii. Awning introduced over the lift waiting area.
iii. The laser cut screen is replaced by a metal screen between the communal open space and motorcycle spaces.
iv. Material change of external wall from brick to precast concrete render to match the approved colour scheme.
v. General corridor amendments to suit BCA and DDA requirements.
vi. Addition of blade walls to the southern side of the windows of Rooms 105, 205, 305 and 404 in accordance with Condition 5."
(1) Inner West Council, as the relevant consent authority, has agreed, under s 113 of the Environmental Planning and Assessment Regulation 2021, to the Applicant amending Modification Application No DA/2021/0625/A in accordance with the documents below:
(1) The application is granted.
(2) Development Consent DA/2021/0625 for the construction of a five-storey boarding house is modified in the terms set out in Annexure A.
(3) Development Consent DA/2021/0625 as modified by the Court is set out in Annexure B.