[2026] VCAT 114
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-02-23
Original judgment source is linked above.
Use of land for a store and Restricted Retail Premises (Shop)
To construct a building or construct or carry out works for a store and restricted retail premises
To create or alter access to a road in a Transport Zone 2
(a) The southern egress access point to be relocated further north and away from the service road exit point to provide an improved egress angle to enhance sight lines for all road users, including shared path users and generally in accordance with the plan prepared by One Mile Grid and marked Project No 250844, Drawing No SPA150 Revision A;
(b) Plans to be amended to show the following SMP and BESS
- Solar system size, solar panel orientation and inclination angle, in line with BESS commitments, noted on the roof plan
- The minimum roof area (m2) discharging to the raingarden noted on the Roof Plan
- A section detail through the proposed raingarden showing
(1) a minimum ponding depth of 200mm in line with Melbourne Water's modified design for Melbourne's West.
The amended landscape plan will show the following:
(a) Only water- efficient planting and no irrigation system; alternatively, BESS Water Credit 3.1 Water Efficient Landscaping must be removed.
(b) Plant species /plant density for the raingardens in line with Melbourne Water guidelines.
(c) Prioritisation of native and drought resistant vegetation and provision of canopy trees where possible.
(d) An outline of buildings. No floor plans are to be shown on the landscape plan, however the dimensions of the outline are to be informed by the approved site plan.
(e) Clearly drafted at a scale of 1:100 or similar with a north point and legend.
(f) Clear graphics to indicate trees (deciduous or evergreen), shrubs, ground covers, grass etc.
(g) Botanical and common name, pot size, quantity, planting density and size at maturity of all plantings.
(h) Notated planting specification drawings.
(i) Location and depth of all surface treatments with materials and colours notated.
(j) Outline of all built features including buildings, fences, letterboxes, clotheslines, storage, water tanks and utility structures etc. These structures are to be informed by the site plan.
(k) Mark all crossovers.
(l) Any vegetation or structures within the nature strip.
The Sustainability Management Plan will show the following:
(a) Provide a compliant façade calculator to support the BESS Deemed to Satisfy pathway
(b) Details of initiatives to reduce potable water consumption in the buildings air-conditioning chillers and/or fire testing systems, to support BESS Water credit 4.1;
(c) The BESS report amended so that:
- Management Credit 3.2 is deleted as only one tenancy is proposed.
(a) The southern egress access point to be relocated further north and away from the service road exit point to provide an improved egress angle to enhance sight lines for all road users, including shared path users.
Unless approved otherwise by the responsible authority, all commercial/industrial stormwater systems must incorporate measures to satisfy the objectives of "Urban Stormwater Management Guidance" (publication 1739.1, EPA 2021) to reduce or retain in total:-
(a) 80% of suspended solids;
(b) 45% phosphorus;
(c) 45% nitrogen; and
(d) 70% litter/gross pollutants larger than 5mm.
Before any drainage works associated with the development commence, detailed construction plans must be submitted to and approved by the responsible authority.
(a) the access and parking area(s) shown on the endorsed plan(s) have been constructed to the requirements and satisfaction of the Responsible Authority; and
(b) the garden and landscape area(s) shown on the endorsed plan(s), including external fixtures such as clotheslines, storage sheds and water tanks, have been provided and completed to the requirements and satisfaction of the Responsible Authority.
Completion of Development and Commencement of Use (USE AND DEVELOPMENT)
(a) The development is not started within three (3) years of the date of this permit;
(b) The development is not completed within five (5) years of the date of this permit;
(c) The use does not start within two years after the completion of the development.
(d) The use is discontinued for a period of two (2) years.
The Responsible Authority may extend the periods referred to if a request is made in writing whereby either of the following instances apply:
(a) before or within six (6) months after the permit expiry date, where the use or development allowed by the permit has not yet started; or
(b) within twelve (12) months after the permit expiry date, where the proposal allowed by the permit has lawfully started before the permit expires.
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] [2025] VSC 549 (4 September 2025).
National Storage (Operations) Pty Ltd
Wyndham CC [2026] VCAT 114