[2025] TASSC 45
General information, not legal advice.
Supreme Court of Tasmania
2025-09-24
Estcourt J
Original judgment source is linked above.
CITATION: Mures Fishing Pty Ltd v Holloway & Anor [2025] TASSC 45
PARTIES: MURES FISHING PTY LTD (ACN 069 572 149)
Contract Law - Building, engineering and related contracts - The contract - Construction of particular contracts and implied conditions - Claim for damages on basis that defendants breached agreement to lease and lease - Content of Lessors work - Architectural plans alone did not contain all of the details of the Lessors work and were not to be read in isolation from mechanical drawings referred to in them - No ambiguity or inconsistency found in or between the words of the Agreement to Lease and Lease - Defendants liable for damages for work not performed and defective work.
Contract Law - Building, engineering and related contracts - Performance of work - Remedies for breach of contract - Damages - Measure of - Quantum of damages in light of breach.
Australian Broadcasting Commission v Australasian Performing Right Association Ltd [1973] HCA 36, 129 CLR 99
Electricity Generation Corporation v Woodside Energy Ltd [2014] HCA 7, 251 CLR 640
Toll (FGCT) Pty Ltd v Alphapharm Pty Ltd [2004] HCA 52; 219 CLR 165
Wright v Lemon [2024] WASCA 19
Tabcorp Holdings Ltd v Bowen Investments Pty Ltd [2009] HCA 8, 236 CLR 272
Bellgrove v Eldridge (1954) HCA 36, 90 CLR 613
Stone v Chappel [2017] SASFC 72, 128 SASR 165 at [200]
Judgment Number: [2025] TASSC 45
MURES FISHING PTY LTD (ACN 069 572 149) v PATRICK GERARD HOLLOWAY
"...in consideration of the rent...and the covenants...the Lessor does hereby Demise and Lease unto the Lessee all that the premises described in item 5 of the Reference Schedule ('the demised premises') together with (if any) the furniture furnishings plant and equipment in the demised premises described in Item 6 of the Reference Schedule ('the plant and equipment') ...".
"Plant and Equipment: as per the drawings and performance specifications in accordance with which the improvements on the demised premises were constructed and including but not limited to those items specified in the list annexed hereto and marked "A"" (emphasis added).
"Equipment to be supplied & installed by Pat Holloway
All refrigeration & air conditioning, other than Ice Maker, Blast Freezer & Waste Chiller..."
The Drawings and Performance Specifications are generally in accordance with a set of plans and specifications prepared by Preston Lane Architects (version 17/9/2014) contained on a compact disk titled '243 Kennedy Drive Cambridge 2014-422'." (Emphasis added.)
"The Plaintiff has suffered loss in that it has not received the entire benefit of the Lessor's Work as warranted under the Agreement to Lease and has been put to loss and expense as set out in the Rule 261 Statement filed with this Statement of Claim."
Installation of Air-Conditioning units per plans entitled "015140-M01", "01514-M02" and "01514-M07";
Installation of Roof access Plan and Walkway per plans entitled "01514-M03" and "A02-05";
Reveling (sic) of concrete slabs outside Main Chiller and in dispatch area;
$151,102.23 (including 40% for preliminaries / contingencies)
$5,545.00 (including 40% for preliminaries / contingencies)
(a) Are the defendants obliged by cl 2(a) and Annexure "C" of the Agreement to Lease to "install" as "Lessor's work":
- the fourteen "refrigeration and air-conditioning units" alleged in [1](a) of the particulars subjoined to [7] of the amended statement of claim;
(b) Did the defendants' breach cl 2(a) of the Agreement for Lease by allegedly failing to complete as "Lessor's work" in a good and workmanlike manner:
- the concrete slab in the main chiller and around the dispatch area as alleged in [2](c) of the particulars subjoined to [7] of the amended statement of claim;
- the floor plate of the Gourmet products freezer and the heating element as alleged in [2](d) of the particulars subjoined to [7] of the amended statement of claim; and
- the internal wall frame and cladding of the room adjacent to the ice room as alleged in [2](e) of the particulars subjoined to [7] of the amended statement of claim.
The Defendants breached the Agreement to Lease in that:
(1) The Lessor's Work constructed on the property failed to generally accord with the engineering plans, drawings and specifications on the Compact Disc, as follows:
(a) Refrigeration and air-conditioning units referred to in drawings entitled '015140-M01' (sic), '01514-M02' and '01514-M07' within the plans and specifications and designated:
"Well, I mean, I can't avoid the fact that they're referenced. They are referenced in the plans [the Preston Lane plans], but because of note 27 and because of the evidence of Mr Sutherland about the nature of these plans, and because they're described as tender plans, the parties, in my submission, must have contemplated a tender process before any of this ventilation and air conditioning could be carried out as a lessor's work.
And that means, in my submission, that it isn't lessor's work, it's something else. It's part of a tender process that could be completely different to what's in those plans of Mr Sutherland. So, that's what I'm submitting to your Honour - is that the construction has to be that, because to be otherwise would make a nonsense out of this business dealing." (My emphasis.)
"The evidence of Andrew Sutherland is that the limit of his obligation was to prepare mechanical plans for tendering via suitably qualified contractors, and that those plans are not construction plans. That his plans were provided for the sole purpose of the client using them for tender negotiations for procurement and ongoing services. That his tender plans were provided for Pat Holloway. That the tender process using his plans might be that the builder would then normally seek expressions of interest from suppliers of goods and services for the procurement and construction of the facility, following which he might provide additional services with respect to finalising plans for construction. That they would then have to go to a construction issue drawing, and then they might be refined further and become a contract issue drawing, which is an arrangement between the builder and his trade contractors or service providers. That if he were engaged by the client to modify the plans and make amendments that it is quite likely that a range of products and services may be available that are different from what's been documented, and they may be adopted for commercial reasons or alterations or improvements or changes. That workshop drawings would be produced at the completion of his commission - the contractor will then seek quotations and submissions for goods and services materials from trade contractors and for mechanical services. The successful trade contractor, when appointed, will then prepare the workshop drawings, which may also be called construction drawings. That the bid by the successful trade contractors, includes the preparation of their drawings and the scope of work could be changed at the discretion of the builder - the scope of work may change, from his tender documents to construction for various reasons including cost and fitness for purpose "at the discretion of the builder". (Transcript page references omitted.)
"As per the drawings and performance specifications in accordance with which the improvements on the demised premises were constructed and including but not limited to those items specified in the list annexed hereto and marked 'A'" (Emphasis added.)
"It is trite law that the primary duty of a court in construing a written contract is to endeavour to discover the intention of the parties from the words of the instrument in which the contract is embodied. Of course the whole of the instrument has to be considered, since the meaning of any one part of it may be revealed by other parts, and the words of every clause must if possible be construed so as to render them all harmonious one with another. If the words used are unambiguous the court must give effect to them, notwithstanding that the result may appear capricious or unreasonable, and notwithstanding that it may be guessed or suspected that the parties intended something different. The court has no power to remake or amend a contract for the purpose of avoiding a result which is considered to be inconvenient or unjust. On the other hand, if the language is open to two constructions, that will be preferred which will avoid consequences which appear to be capricious, unreasonable, inconvenient or unjust, "even though the construction adopted is not the most obvious, or the most grammatically accurate", to use the words from earlier authority cited in Locke v. Dunlop [1888] UKLawRpCh 140; (1888) 39 Ch D 387, at p 393 , which, although spoken in relation to a will, are applicable to the construction of written instruments generally; see also Bottomley's Case [1880] UKLawRpCh 258; (1880) 16 Ch D 681, at p 686 . Further, it will be permissible to depart from the ordinary meaning of the words of one provision so far as is necessary to avoid an inconsistency between that provision and the rest of the instrument. Finally, the statement of Lord Wright in Hillas & Co. Ltd. v. Arcos Ltd. [1932] UKHL 2; (1932) 147 LT 503, at p 514 , that the court should construe commercial contracts "fairly and broadly, without being too astute or subtle in finding defects", should not, in my opinion, be understood as limited to documents drawn by businessmen for themselves and without legal assistance (cf. Upper Hunter County District Council v. Australian Chilling and Freezing Co. Ltd. [1968] HCA 8; (1968) 118 CLR 429, at p 437 )."
"It is not the subjective beliefs or understandings of the parties about their rights and liabilities that govern their contractual relations. What matters is what each party by words and conduct would have led a reasonable person in the position of the other party to believe. References to the common intention of the parties to a contract are to be understood as referring to what a reasonable person would understand by the language in which the parties have expressed their agreement. The meaning of the terms of a contractual document is to be determined by what a reasonable person would have understood them to mean. That, normally, requires consideration not only of the text, but also of the surrounding circumstances known to the parties, and the purpose and object of the transaction."
"35 Both Verve and the Sellers recognised that this Court has reaffirmed the objective approach to be adopted in determining the rights and liabilities of parties to a contract. The meaning of the terms of a commercial contract is to be determined by what a reasonable businessperson would have understood those terms to mean. That approach is not unfamiliar. As reaffirmed, it will require consideration of the language used by the parties, the surrounding circumstances known to them and the commercial purpose or objects to be secured by the contract. Appreciation of the commercial purpose or objects is facilitated by an understanding 'of the genesis of the transaction, the background, the context [and] the market in which the parties are operating'. As Arden LJ observed in Re Golden Key Ltd [[2009] EWCA Civ 636 at [28]], unless a contrary intention is indicated, a court is entitled to approach the task of giving a commercial contract a businesslike interpretation on the assumption 'that the parties ... intended to produce a commercial result'. A commercial contract is to be construed so as to avoid it 'making commercial nonsense or working commercial inconvenience' [Zhu v Treasurer of New South Wales [2004] HCA 56; (2004) 218 CLR 530 at 559 [82]]. (Endnotes omitted, citation added.)
"55 The defendants are not saying that they would not be obliged to engage in some form of tender process, but rather, that:
55.1 the defendants were only ever obliged to engage in a tender process that produced workshop drawings and performance specifications for the plant and equipment contemplated in the Preston Lane plans in the file marked 'Architectural' in the CD;
55.2 those plans of Preston Lane contemplated only very large air-conditioning and refrigeration units such as the evaporators and condensers necessary to make the various Chiller and Freezer rooms operational for the purposes of a fish processing factory under the Agreement to Lease (and those were installed); and
55.3 the twelve air-condition ventilation units claimed in this proceeding were not contemplated by the Preston Lane plans, and were not necessary to achieve the occupancy permit required by the Agreement to Lease, and which was ultimately granted.
"Where a word or an expression is defined in a commercial contract the court will give effect to the definition. The proper course is to read the text of the definition into the relevant clause and then to construe the relevant clause having regard to the contract as a whole. Ordinarily, the purpose of a definition in a commercial contract is to attribute the meaning agreed upon by the parties to the relevant word or expression and to avoid unnecessary and lengthy repetition of the text of the definition in the contract."
"Concerns over the air conditioning not being installed as of yet have been raised. Pat indicated he is waiting for the last $150k of finance to come through before this can be completed."
"In this agreement unless there be something in the subject or context inconsistent therewith the expressions following shall have the respective meanings hereinafter mentioned" (Emphasis added.)
"Okay. I'll take you on to your paragraph 4, which is at page 52 of the PDF?......Yeah.
So here's we're talking about the main floor - ?......Yes.
In issuing certification in relation to any specific floor finish, Biosecurity Tasmania will take into account matters such as the ability of the floor finish to be cleaned and effectively drained. Here, the department's issued consent on the basis of the as designed plans which did not include the cutting and installation of drains into existing concrete, as per Mr Freeman's proposal.
Now, my question to you is, isn't it possible, though, that if Mr Freeman's proposal is utilised - ?......Yes.
And isn't it true that even on - on your proposal that - that the plans would have to be amended and recertified?......Correct.
So, Biosecurity would have to give certification to your - to your proposal, anyway?......They would, although, I'd say there's a higher chance, because it's in accordance with an Australian Standard, rather than a patch up job.
But again, my question to you is, isn't Mr Freeman's suggestion then, in relation to area 4, a viable option?......It could be, yes. [indistinct words]
The difficulty with Mr Freeman's proposal to construct another drainage point is that it will require at the very least, adjustments to the current concrete floor via cutting into the slab. This can in turn create issues with the concrete, such as creation of joints in the finish. Depending on the location of the drains, structural considerations may be required.
And my question to you is, these aren't insurmountable - insurmountable problems, are they?......Well, as long as you can get approval from Biosecurity, they're not insurmountable, no.
And my question about that is, isn't there a chance that that could happen with Mr Freeman's proposal, because it's a viable possibility?......I can't speak for Biosecurity, so you're suggesting it's a possibility, I mean, we - we - we like to pursue all possibilities, whether they're -
HIS HONOUR: You'd have to run it past Biosecurity first, wouldn't you?
HIS HONOUR: You'd be crazy to be cutting - cutting concrete with a concrete saw for long lines and putting drains in, and then asking Biosecurity if they would approve it.
MR O'RAFFERTY: (Resuming) Well, what about for your suggestion, would you need approval first for your suggestion from Biosecurity?......You would, but it's in accordance with an Australian standard so therefore it'd be easily accepted. There's no element of - the element of proof for compliance is less.
HIS HONOUR: Even so, you wouldn't pump (sic) that either, would you? You'd - no.
MR O'RAFFERTY: (Resuming) And I'll take you to your paragraph 10, which is over the page?......Ah, yes.
And page 53 of the PDF?......Yeah, I've got it thanks.
Even if this were not the case, there's a risk that poor installation may cause further compliance issues.
But again the same question. It might not be poor installation?......No, that's correct.
And poor installation may occur with your proposed rectification?......It can happen any - on anything, really."
"...it reflects the plaintiff's interest in securing performance of the contract, even if that reflects some subjective aesthetic or eccentric benefit bargained for by the plaintiff rather than some objective financial benefit. It permits the recovery of damages assessed by reference to the performance the plaintiff bargained for, rather than confining the plaintiff to compensation for the loss of the objective financial or economic benefits of performance."