[2012] VCAT 1916
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2012-12-14
Original judgment source is linked above.
Section 79 of the Planning & Environment Act 1987; Yarra Planning Scheme; mixed use development of 6-7 storeys; demolition of a dwelling in a Heritage Overlay; built form and scale; Major Activity Centre; amenity of dwellings in a Business 1 Zone; impact on neighbourhood character.
Mohr Nominees Pty Ltd v Yarra CC [2012] VCAT 1916
Mr Cicero called expert evidence from Chris Goss (visualisation) of Orbit Solutions, Bryce Raworth (heritage consultant) of Bryce Raworth Pty Ltd, Jason Walsh (traffic engineer) of Traffix Group, John Patrick (landscape architect) of John Patrick Pty Ltd, Jan Talacko (sustainability consultant) of Ark Resources and Catherine Heggen (town planner) of Message Consultants.
David Gold (town planner) of Planned FX Pty Ltd provided an explanation at the commencement of the hearing of a number of errors within the plans, and was made available for questions of clarification from the other parties.
Mr Rantino called expert evidence from Andrew Hutson (architect) and Robyn Riddett (heritage consultant) from Anthemion Consultancies.
Jane Sharp, Barrister appeared by direct brief for Paul Beekman, David Fox, Jane Allardice, P Caldon and B Walker, Pauline Ryan & K Johns, Trudie Fraser, Sue Wheatley, Nola Rushford, Susannah Dax, and Carol Butters.
Terry Glenane, Michael McManus, Louise Elliot, Charles Sowerwine and Marc Banks all appeared in person.
Demolition of the existing buildings, and development of the land with a six to seven storey building[1] comprising a food and drink premises, gymnasium and 54 dwellings. A basement will provide 55 car parking spaces predominantly in stackers as well as storage and bicycle parking facilities.
Application under Section 79 of the Planning and Environment Act 1987.
Clause 34.01-1 to use land within the Business 1 Zone for a dwelling.
Clause 34.01-4 to construct a building or construct or carry out works on land within the Business 1 Zone.
Clause 43.01-1 to demolish a building and to construct a building or construct or carry out works on land affected by the Heritage Overlay.
Clause 52.06-3 to reduce the standard amount of car parking required under that Clause.
Clause 52.07 to waive the loading bay requirements.
Clauses 10, 11, 13, 15, 16, 17, 18, 21, 22.02, 22.03, 22.05, 22.12, 34.01, 43.01, 52.02, 52.06, 52.07 and 65.
The land is an irregular shaped allotment of some 1405 square metres with frontages to Hodgson Street of 45.04 metres, to Gore Street of 36.15 metres and to Moor Street of 30.22 metres. The land presently supports a two storey office building that presents to all three street frontages and a single storey detached dwelling that presents to Moor Street. Car parking to the site is currently available via both Hodgson and Moor Streets.
The Tribunal conducted an accompanied inspection of the subject site and surrounding area on 7 December 2012.
Virgon Constructions Pty Ltd v Boroondara CC [2011] VCAT 2296; JCT v Bayside CC [2009] VCAT 2064; Lawonnue PL v Port Phillip CC [1999] VCAT 695.
Is the demolition of the contributory heritage building at 221 Moor Street appropriate?
To ensure the conservation of places of heritage significance.
To encourage the preservation, maintenance, restoration and where appropriate, reconstruction of heritage places.
Generally encourage the retention of a building in a heritage place, unless
Note: The poor condition of a heritage place should not, in itself, be a reason for permitting demolition.
To conserve and enhance heritage places of natural or cultural significance.
To conserve and enhance those elements which contribute to the significance of heritage places.
Is the building an appropriate built form response to its heritage and character context?
Encourage a diversity of housing types at higher densities in and around activity centres.[7]
Encourage higher density housing development on sites that are well located in relation to activity centres, employment corridors and public transport.[8]
Development on strategic redevelopment sites or within activity centres should generally be no more than 5-6 storeys unless it can be demonstrated that the proposal can achieve specific benefits such as:
In considering these issues, it is important to recognise that the subject site and the residential development to the west of the subject site are all in the Business 1 Zone. The test for unreasonableness is different in a business zone situation in Major Activity Centre compared to residential street in Hampton. There are different purposes of the zone and different strategic concepts that direct more intensive development and different level of commercial activity to these areas. Similarly, there is no requirement on the application to meet Rescode Standard although they sometimes are useful for comparative purposes.
In attempting to place some perspective of the issues at and near a residential interface I refer to the words of an often repeated decision of Martin Stuart[12]:
The owners and occupiers of allotments at such zone interfaces must both make compromises. The occupier of the residential allotment must accept a lower residential amenity. The occupier of the business zone allotment must accept a possible requirement that the height and intensity of development that may be appropriate elsewhere in the zone be softened or scaled down at the boundary.
In this case the subject site does not abut a residential zone. Whilst it is close to a residential zone, it abuts a residential development that is built up to the side laneway in a hard-edged form within a Business 1 Zone. The applicant has compromised, to a certain degree, in its expectation for development close to the residential interface in an appropriate manner by setting the upper level of the building back 6.8 metres from that rear boundary. The building is also set back at a lower level to accommodate balconies. This seems to be is a reasonable design response in a Major Activity Centre
Residents living next to or inside a Major Activity Centre should temper their expectations of what is appropriate in terms of neighbourhood character and amenity standards because State and Local Planning policies direct a higher form of development of the kind proposed in this application, into the Hampton Street Activity Centre, and that this activity centre will be the focus for a change.
Are car parking and traffic impacts appropriately resolved?
Demolition and development of the land with a seven storey building comprising dwellings and a food and drinks premises, use of the land for dwellings, reduction in the car parking provision, waiver of loading bay requirements, removal and construction of crossovers and removal of easements (instrument numbers N542588M and N542587Q) generally in accordance with the endorsed plans
all to the satisfaction on the Responsible Authority.
The Responsible Authority may approve extensions to these time limits if requests are made before the permit expires or within three months afterwards.
[1] As the basement partly protrudes above ground at some locations it is officially a storey and so makes the development seven storeys high.
[2] We have considered all submissions presented by the parties although we do not recite all of the contents in these reasons.
[7] Clause 11.01-2 of the Yarra Planning Scheme.
[9] We accept the evidence of Mr Talacko that the building achieves such a standard.
[10] We note that two planning permit applications have been lodged to develop tall buildings on the two adjoining properties to the east. While we have not give weight to the pictured built forms, we consider the applications to demonstrate the intent to redevelop these sites.
[11] [2009] VCAT 2064, at paragraphs 35-38 inclusive.
[12] Martin Stuart Pty Ltd v Port Phillip CC [2000] VCAT 887
[13] As measured from the existing ground level within Mr McManus' rear yard according to the survey information submitted by the Applicant.
Mohr Nominees Pty Ltd
Yarra CC [2012] VCAT 1916