[2011] VCAT 1443
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2011-07-28
Original judgment source is linked above.
Section 77 of the Planning & Environment Act 1987; Moonee Valley Planning Scheme;
Whether the building's scale, height and form is appropriate; whether the internal amenity of the dwellings is acceptable; whether the proposal will unreasonably constrain development opportunities on adjoining land; whether parking, access and the level of associated traffic is acceptable.
Mission Express Pty Ltd v Moonee Valley CC [2011] VCAT 1443
Mr. Graeme Peake, Barrister, by direct brief. He called, as expert witnesses, Mr. Mark Sheppard, urban designer of David Lock Associates, Mr. Shayne Linke, town planner of Contour Consultants Australia and Mr. Brownlie, traffic engineer of Cardno.
Ms. Lorraine Stupak, of LS Planning. She called, as expert witness, Mr. Benny Chen, traffic engineer, of ML Traffic.
Mr. Damien Loughlan, town planner, of Gattini & Partners, for Mr. Cimone.
A four-storey building with two shops on the ground floor together with a parking area and 24 apartments on the other three floors. The apartments range in size from studio (12) to one-bedroom (8) to two-bedroom (4). Cars enter the parking area from a rear laneway and parking is provided in a three-tier mechanical stacking system.
Application pursuant to s.77 of the Planning & Environment Act 1987 to review the decision of the responsible authority to refuse to grant a permit.
Business 2 zone. Adjoining land to the east and west is similarly zoned, together with land on the opposite side of Maribyrnong Road. Land to the north, across the rear laneway, is zoned Residential 1. Maribyrnong Road is zoned Road Zone (category 1).
Clause 34.02-1: use of land for dwellings in a Business 2 zone
Clause 34.02-4: buildings and works in a Business 2 zone
Clause 52.06: waiver of part of the requirement for on-site parking
Clause 52.07: waiver of the requirement for a loading bay.
Clauses 15.01-2, 21.02, 21.03, 21.04, 21.05, 21.06, 22.01, 22.13
The site is rectangular, situated on the northern side of Maribyrnong Road and one lot west of its intersection with Union Road and has a cobbled laneway across its rear boundary. It has a frontage of about 12 metres and an area of about 460 square metres. The buildings to the site's east and west are older buildings: one-storey commercial (to the east) and two-storey, reputedly residential (to the west). Permits have been granted for sites a little further west to be developed with buildings of three (now existing) and five storeys (now commencing construction), the latter having frontage setbacks for the higher levels.
The site contains a two-storey commercial building that is built to the street frontage and has rear vehicular access to an open yard.
There is also a three-storey apartment along the northern side of the rear laneway and a three-storey Victorian hotel diagonally across the intersection of Maribyrnong and Union Roads.
The site is situated in a Major Activity Centre with good public transport access (a tramline in Maribyrnong Road and one extending south along Union Road).
I made an unaccompanied inspection of the site and its locality on the 5th June 2011.
Would the building be too high, too prominent or otherwise inappropriate in scale?
Would the proposal's parking provision and traffic access be acceptable?
Would the internal amenity of the proposed dwellings be acceptable?
Would the proposal cause any unreasonable loss of amenity for its neighbours?
Would the proposal unreasonably restrict redevelopment opportunities on the adjoining site to the east?
Do any other matters warrant rejection of the proposal?
Development and use of the land for a four storey mixed use building comprising of two retail premises and dwellings, a reduction in the statutory car parking, waiver of the requirement for visitor bicycle storage and the provisions for loading and unloading
Before the development starts, amended plans (three copies) must be submitted to and approved to the satisfaction of the Responsible Authority. The plans must be drawn to scale, with dimensions, and be generally in accordance with the plans SK01-SK10, Revision A, dated 29.04.11 but modified to show:
(a) The residential entry at ground level, on the southern elevation to:
be provided with a large single door in lieu of double doors
include signage, which provides for a sense of address
(b) Additional screening to windows and balconies facing into the courtyards and balconies along the eastern side of the site to satisfy the reasonable requirements of Standard B22 of Clause 55.04-6
(c) The western alignments of the balcony associated with Dwelling 24 to be screened in accordance with Clause 55.04-6 of the Moonee Valley Planning Scheme
(d) Balconies of less than 2 metres width must be provided with access via a sliding or concertina-type door
(e) The windows and glazed door to the balcony of Unit 16 to be modified to maximise the area of glazing
(f) Skylights to the bedrooms of Units 21 and 22 to be vented.
(g) Any water retention system required by Condition 11
(h) A schedule of all external material and finishes. The schedule must show the material, colour (including colour samples) and finishes of all external walls, roof, fascias, windows frames, fences and paving
Once approved these plans become the endorsed plans of this permit.
With the exception of buildings and works associated with the undertaking of the assessment required by this condition, the construction or carrying out of buildings and works (including excavation) must not occur until an environmental assessment of the site, prepared by a suitably qualified environmental professional, is submitted to the Responsible Authority to its satisfaction.
If the consultant's opinion is that an environmental audit should be undertaken, then before the development is occupied, either:
In the event that the management measures are required, or a Statement is issued in accordance with Part IXD of the Environment Protection Act 1970, before the development is occupied:
At the direction of the Responsible Authority, before the development is occupied, the owner must enter into an agreement with the Responsible Authority pursuant to Section 173 of the Planning and Environment Act 1987 to:
Before the development is occupied, the owner must procure that the Section 173 Agreement is registered on the Title to the land. The owner must pay the costs of the preparation and execution of the Agreement and entry of the memorandum on Title, including any statutory fees.
The layout of the site and the size, design and location of the buildings and works permitted must always accord with the endorsed plan and must not be altered or modified without the further written consent of the Responsible Authority.
The privacy screens as shown on the endorsed plans must be installed prior to the occupation of the building.
Prior to the occupation of the development, all boundary walls must be cleaned and finished to the satisfaction of the Responsible Authority.
Service units, including air conditioning units, must not be located on any of the balconies or terrace areas unless appropriately visually and acoustically screened to the satisfaction of the Responsible Authority.
All pipes (except downpipes), fixtures, fittings and vents servicing the building on site and below roof level must be concealed in service ducts or otherwise hidden from external views to the satisfaction of the Responsible Authority.
Before any building or works start, a Construction Management Plan must be submitted to and approved by the Responsible Authority detailing the construction activity proposed. Once submitted and approved the works detailed by the Construction Management Plan must be carried out to the satisfaction of the Responsible Authority.
Floor levels shown on the endorsed plan(s) must not be altered or modified without written consent of the Responsible Authority.
Before the use commences, a parking management plan must be submitted to and approved by the responsible authority. When approved, the parking management plan will become part of the permit. The plan must include
The parking management plan may be amended from time to time with the written agreement of the responsible authority.
A stormwater detention system to be provided and maintained to the satisfaction of the responsible authority.
Prior to the commencement of the development, the applicant shall submit a Waste Management Plan to the Responsible Authority for approval. The Waste Management Plan shall be in accordance with the City of Moonee Valley's "Waste Management Plans - Guidelines for Applicants" and once approved shall be implemented to the satisfaction of the Responsible Authority. The Waste Management Plan may be amended to the satisfaction of the responsible authority.
The amenity of the area must not be detrimentally affected by the use of land, through:
This permit will expire if one of the following circumstances applies:
the development is not commenced within two (2) years from the date of issue of this permit; or
the development is not completed and the use is not commenced within four (4) years from the date of issue of this permit.
Before the permit expires or within three (3) months afterwards the owner or occupier of the land may in writing request the responsible authority to extend the expiry date.
[1] Hansen Partnership provided two reports to Council. The first recommended a 2 metre northern setback to the fourth level, which has been adopted. The later report recommended that this setback be increased further.
[2] The ABS data for Moonee Valley indicates, according to Mr. Brownlie, that in Moonee Valley City, 76% of studio apartments, 43% of one-bedroom and 26% of two-bedroom apartments do not generate any demand for parking. Given that this is City-wide data, the parking demand for apartments close to good public transport, and themselves of lower rather than higher amenity, is likely to be less rather than more than these figures.
Mission Express Pty Ltd
Moonee Valley CC [2011] VCAT 1443