Miller v The State of South Australia & Ors [2026] SAET 10
AMACA PTY LTD (FORMERLY JAMES HARDIE & COY PTY LTD)
JURISDICTION: South Australian Employment Court - Dust Diseases Act 2005 (SA) - Costs
JUDGMENT OF: His Honour Deputy President Judge Calligeros
Costs dispute following orders being made after delivery of judgment - The applicant seeks indemnity costs from the respondents - HELD: 1. Each respondent is liable to pay the applicant's costs on a party and party basis and it is appropriate that they do so in equal proportions - 2. The applicant is entitled to receive the difference between his party and party costs and his indemnity costs from the first respondent from 10 July 2025 as the evidence of its own witness on 26 June 2025 undermined its case and made it apparent that the applicant would succeed - There was relevant delinquency in failing to make an offer to the applicant 14 days after 26 June 2025 - 3. The claim for indemnity costs against the second respondent is dismissed - 4. The first respondent is entitled to the costs of the third party action against the third and fourth third parties on a party and party basis - 5. The third and fourth third parties are not liable to contribute to the first respondent's liability to pay the costs of the applicant.
Mutual Community Limited v Lorden Holdings Pty Ltd & Ors (28 April 1993, unreported)
John Holland Constructions & Engineering Pty Ltd v Majorca Projects Pty Ltd & Anor (1 November 1996, unreported)
Oshlack v Richmond River Council [1998] HCA 11; (1998) 193 CLR 72
Holt v Bunney (No 2) [2020] SASCFC 120
Fountain Selected Meat (Sales) Pty Ltd v International Produce Merchants Pty Ltd (1988) 81 ALR 397
Colgate-Palmolive Company v Cussons Pty Ltd [1993] FCA 536; (1993) 46 FCR 225
Hazledene's Chicken Farm Pty Ltd v Victorian WorkCover Authority (No 2) [2005] 13 VR 435
Nominal Defendant v Dighton (No 2) [2012] SASCFC 97
Phantom Precision Engineering Pty Ltd v Luscombe (No 2) [2021] SASC 103
Viscariello v Macks (No 3) [2021] SASC 69
Simpson v British Industries Trust Ltd (1923) 39 TLR 286
Sinclair v William Arnott Pty Ltd (No 2) (1963) 64 SR (NSW) 88
Latoudis v Casey [1990] HCA 59; (1990) 170 CLR 534
Knight v Clifton [1971] Ch 700
Australian Transport Insurance Pty Ltd v Graeme Phillips Road Transport Insurance Pty Ltd (1986) 71 ALR 281
First Respondent: Mr M Roberts KC with Ms E Denbigh
Our client considers the Applicant's offer represents a reasonable compromise of the quantum of his claim. It considers that offer should be accepted.
The only issue preventing acceptance of the Applicant's offer is apportionment between the Respondents. Based on the evidence adduced, Amaca is prepared to contribute 5% up to $2,000,000.00 plus 5% of costs and disbursements to be agreed or taxed on a full and final basis.
lf your client can negotiate a better settlement with the Applicant than his current offer, Amaca offers to contribute 5% of that settlement up to $2,000,000.00 plus 5% of costs and disbursements to be agreed or taxed on a full and final basis.
Amaca will not participate in any further negotiations and does not permit this offer being disclosed to any of the other parties prior to settlement being agreed with the Applicant.
lf Amaca's offer is accepted by 5 pm on Thursday 17 April 2025, then Amaca will bear its own costs of the proceedings to date and agree to a mutual discontinuance of the contribution claims between our clients on the basis that our respective clients each bear their own costs.
lf Amaca's offer is not accepted by your client prior to 5 pm on Thursday 17 April 2025, and Amaca achieves better apportionment of liability, and the Applicant is awarded more than his offer, Amaca will claim costs from your client on an indemnity basis from close of business on 17 April 2025.lt will also argue that the Applicant's costs incurred after close of business on Thursday 17 April 2025 should be paid by your client.
This offer is made in accordance with the principles established in Calderbank v Calderbank [1975] 3 All ER 333 and Cutts v Head [1984] Ch 290 and adopted by the Supreme Court of Victoria in Mutual Community Limited v Lorden Holdings Pty Ltd & Ors (28 April 1993, unreported) and John Holland Constructions & Engineering Pty Ltd v Majorca Projects Pty Ltd & Anor (1 November 1996 unreported).
The State rejected the Calderbank offers made by Mr Miller and Amaca by letters to each of them dated 11 April 2025.
(a) The first respondent is to pay the applicant's costs on the indemnity basis, to be agreed or taxed;
(b) In the alternative to (a), the first respondent is to pay the applicant's costs on the standard costs basis until 1 April 2025 and thereafter on the indemnity basis, to be agreed or taxed; and
(c) The second respondent is to pay the applicant's costs on the standard costs basis until 1 April 2025 and thereafter on the indemnity basis, to be agreed or taxed.
(i) making positive allegations (including that it had instituted and enforced a system of work at the RAH by which employees of Manpower were inducted, trained and educated about the widespread presence of asbestos and its potentially lethal dangers) which the State ought reasonably to have known were not true;
(ii) in the absence of providing the Court with any explanation that included "granular detail" about when it began the process of discovery and the nature and extent of the resources it devoted to this important task - breaching orders for provision of timely discovery leading to significant delay and increases in costs in circumstances where Mr Miller's Statement of Claim was filed and served upon it in July 2024 and, where the State had previously been sued in respect of allegations of exposure at the RAH and provided discovery in those cases.
(1) In exercising its discretion as to costs, the Court may have regard to any factors it considers relevant.
(2) For example, the Court may have regard to the following factors―
(a) any misconduct or unreasonable conduct of a party in connection with a proceeding;
(d) the making or not making of an offer by a party to resolve the proceeding;
(e) the non-acceptance by a party of an offer made by another party to resolve the proceeding;
...
(h) whether costs awarded are to be met by a person or out of a fund.
I believe that it is appropriate to consider awarding "solicitor and client" or "indemnity" costs, whenever it appears that an action has been commenced or continued in circumstances where the applicant, properly advised, should have known that he had no chance of success. In such cases the action must be presumed to have been commenced or continued for some ulterior motive, or because of some wilful disregard of the known facts or the clearly established law. Such cases are, fortunately, rare. But when they occur, the court will need to consider how it should exercise its unfettered discretion.
Notwithstanding the fact that that is so, it is useful to note some of the circumstances which have been thought to warrant the exercise of the discretion... the making of allegations which ought never to have been made or the undue prolongation of a case by groundless contentions ... an imprudent refusal of an offer to compromise ... and an award of costs on an indemnity basis against a contemnor ... Other categories of cases are to be found in the reports. Yet others to arise in the future will have different features about them which may justify an order for costs on the indemnity basis. The question must always be whether the particular facts and circumstances of the case in question warrant the making of an order for payment of costs other than on a party and party basis.
(a) the stage of the proceeding at which the offer was received;
(b) the time allowed to the offeree to consider the offer;
(c) the extent of the compromise offered;
(d) the offeree's prospects of success, assessed as at the date of the offer;
(e) the clarity with which the terms of the offer were expressed; [and]
(f) whether the offer foreshadowed an application for an indemnity costs in the event of the offeree's rejecting it.
The ordinary rule is that the court should award costs on a standard cost basis unless the circumstances of the case must be such as to warrant the court in departing from the usual course.
The court may only award indemnity costs where the justice of the case warrants such an order. Likewise, an award of such costs will only be made where there are circumstances that are special and unusual.
Instances where indemnity costs might be awarded include where there are circumstances that are special or unusual, or involve some irrelevant (sic) delinquency on the part of the successful party.
The categories in which such costs can be awarded are not closed.
In the general trial context, a case does not necessarily have to be hopeless, that is have no chance of success, but it is sufficient if it proceeds without apparent regard to the significant deficiencies in its evidence. However, there is nothing in itself improper or unreasonable in the pursuit of claims involving legal difficulty...
**(**Citations omitted)
...What failings were proven, and then whether this combination of proven failings meant that the first respondent breached its duty of care is a legally complex question which required judicial determination. The scope of an occupier's liability and whether the provision of training to employees of a contractor not employed by the occupier falls within the ambit of the requisite duty is similarly a legally complex question requiring judicial determination.
(a) the quantum of Mr Miller's claim;
(b) the State's liability in respect of Mr Miller's claim;
(c) any offers made by Mr Miller to the respondents (jointly or separately);
(d) the State's view on apportionment of liability on its contribution to BIC/BISA.
It is no answer for the State to say that Amaca was unwilling to negotiate based upon certain correspondence from Amaca. The liability of each of the State and Amaca is joint and several. There is no legal requirement for an agreement amongst all respondents for one respondent to accept an offer by an applicant. Further, there was never a reasonable possibility that Amaca would bear more of the liability to the Applicant than the State.
(a) the costs that were incurred by the Applicant to the date upon which the State ought to have accepted the Applicant's settlement offer, being either;
(i) 23 December 2024, being the date of expiry of the Applicant's Formal Offer of 9 December 2024 to both the State and Amaca;
(ii) 2 January 2025, being the date of expiry of the Applicant's Formal Offer of 19 December 2024 to the State;
(iii) 2 April 2025, being the date upon which the Applicant made his offer to accept $2,000,000 plus costs, which was capable of acceptance by either or both of the State or Amaca;
(iv) Such other amount as is fair and equitable having regard to the role of each in the continuation of the Applicant's action.
(b) that which would be payable to the Applicant on a standard costs basis (irrespective of any order for indemnity costs payable by the State).
It may be true in a general sense that costs orders are not made to punish an unsuccessful party. However, in the particular circumstance of a case involving some relevant delinquency on the part of the unsuccessful party, an order is made not for party and party costs but for costs on a "solicitor and client" basis or on an indemnity basis. The result is more fully or adequately to compensate the successful party to the disadvantage of what otherwise would have been the position of the unsuccessful party in the absence of such delinquency on its part. [Footnotes omitted]
The scope of an occupier's liability and whether the provision of training to employees of a contractor not employed by the occupier falls within the ambit of the requisite duty is similarly a legally complex question requiring judicial determination.
The State took issue with how often Mr Miller said that he encountered asbestos at the RAH. The State submitted Mr Miller's original statement in his first affidavit that he came across asbestos 'almost invariably', or multiple times each week, was out of step with the evidence of all other witnesses. At the outset of his oral evidence, Mr Miller modified his affidavit to say that rather than coming across asbestos 'almost invariably' or 'most of the time', he came across it "from time to time". The State submitted that in doing so, Mr Miller "effectively conceded that what he had said in his [first] affidavit was not true". The State challenged Mr Miller's reliability and credibility.
The State submitted that I need to feel an actual persuasion that Mr Miller was exposed to asbestos at the RAH. The State submitted that there was a divergence between his account and the account of the other non-expert witnesses. For the following reasons I find there are strong similarities between the evidence of the Manpower electricians and Mr Miller, and I accept those accounts, and I feel an actual persuasion that Mr Miller was exposed to asbestos, including crocidolite, at the RAH. (Footnotes omitted)
My client has done its best to comply with the order for Discovery in good faith. However, my client is continuing to search for relevant documents and acknowledges that there are likely other relevant documents which will be located. If and when further discoverable documents are located they will be discovered in accordance with the ongoing obligation to do so.
- On 4 February 2025, the Court ordered that '[a]ny party that seeks to be heard on any issue, including the ambit of discovery... or dealing with the issue of exemplary damages... is to file and serve an application for directions and supporting affidavit by 4pm on 13 February 2025 setting out what is sought.'
- On 13 February 2024, an affidavit of Ms Mary Therese Karpinski was filed by the first respondent (Ms Karpinski's affidavit) which contained a detailed explanation of the process of discovery that had been undertaken, with reference to contact with twenty-one (21) State government agencies and the enormity of the task at hand. Ms Karpinski deposed to the discovery process commencing on 20 August 2024.
- On 19 February 2025, the first respondent filed List of Documents - Revision 1, in accordance with its ongoing discovery obligation. Contrary to Ms Hoffman's affidavit, Mr Frajer's 2010 memorandum was discovered in this list (no. 191).
- On 20 February 2025, argument occurred before the Court. During that hearing, the first respondent did not seek an extension of time to make discovery, instead noting that it had continuing discovery obligations per rule 73.10 of the Uniform Civil Rules 2020 (SA) (UCRs). In the course of that hearing, the applicant agreed that the ongoing obligation to discover continued, and that should the ongoing discovery cause a problem during the course of the trial, either the first respondent or the applicant could make an application for an adjournment of the trial.
- On 6 March 2025, the first respondent filed List of Documents - Revision 2, in accordance with its continuing discovery obligation.
- On 11 April 2025, the first respondent filed List of Documents - Revision 3, in accordance with its continuing discovery obligation. Contrary to Ms Hoffman's affidavit, the 2007 audit report was discovered in this list (no. 339).
- On 11 April 2025, during a directions hearing, the applicant's counsel raised the issue of the State's ongoing discovery. The applicant's counsel queried when the discovery process would come to an end. The first respondent reiterated that it had ongoing discovery obligations. However, the Court was minded to impose an end date for discovery.
- On 15 April 2025, the Court ordered the 'completion of discovery' of relevant documents in relation to the RAH by 16 May 2025 and other relevant documents by 28 May 2025.
- On 16 April 2025, the first respondent emailed the Court and sought clarification in relation to the phrase 'completion of discovery'. Further email communications in relation to this occurred on 28 and 29 April 2025.
- On 30 April 2025, the first respondent filed an affidavit of Ben Lu, which addressed the abovementioned history of the first respondent's discovery. The first respondent sought clarification as to whether the Court's order for the first respondent to 'complete discovery' was intended to relieve the first respondent of its continuing obligation to make discovery.
- On 7 May 2025, the Court ordered that the first respondent be relieved of its obligation to make further discovery after 20 May 2025.
- On 20 May 2025, the first respondent filed List of Documents - Revision 4. (Footnotes omitted)
The positive assertions made by the State and Mr McGowan's evidence
(a) the State controlled and supervised the work and was responsible for the safety of all workers (including contractors) from the potentially lethal effects of asbestos;
(b) he was the principal officer in charge of asbestos procedures including provision of information;
(c) from the mid-1980s it was known that tradesmen working at the hospital might be exposed to asbestos dust in circumstances where they did not expect it to be present and that such exposure might only become apparent during the course of the work after exposure had occurred;
(d) from the mid-1980s he, as the principle asbestos safety officer, knew that asbestos fibres were carcinogenic, and that workmen exposed to even one fibre might contract mesothelioma and die;
(e) the State did not provide any training or "any information" regarding asbestos to employees of contractors including Manpower because he considered that was not the responsibility of E&BS.[47]
Mr McGowan said that a project to remove asbestos from the RAH was designed in 1985 and commenced operation in 1986 or 1987. Some smaller asbestos removal had occurred before then. Mr McGowan said that the removal of asbestos on a larger scale was underway by 1989.
Mr McGowan said that the ceiling spaces in the RAH were grossly contaminated by sprayed asbestos but there was no sprayed asbestos in the riser ducts. He said that performing work "in the riser ducts was a matter for fire prevention, rather than asbestos work". The comment suggests he did not understand the nature and extent of electrical work done in risers by the Manpower electricians. Later in his evidence Mr McGowan agreed that there could be asbestos in a riser if there had been "a dislodgement of a piece of sprayed asbestos that dropped...in the ceiling space and in the ordinary air flow". He said that it was possible for asbestos fibres to be disturbed and move prior to the time when fire barriers were installed in ceiling spaces. That supports Mr Villiers' evidence in that regard.
The process of erecting fire barriers in ceiling spaces was in its infancy and far from complete when Mr Miller worked at the RAH. Mr McGowan's evidence supports the evidence of Mr Miller and the Manpower electricians that asbestos was present in RAH ceiling spaces and risers, and in abundance in the case of the former.
Mr McGowan agreed that the management of asbestos at the RAH was delegated to him. He said the certificate given by the DLI[52] to certify the completion of asbestos training was required by all employees who worked in the maintenance division. Mr Miller and the Manpower electricians worked in the project division.
(Footnotes omitted)
Mr Reynolds stated that inductions "included all contract workers as well". I take that comment to refer to internal contractors.[54] The same construction applies to Mr Reynolds' assertion that all workers were required to wear protective clothing and respirators. If Mr Reynolds meant employees and contractors working for E&BS, as his statement suggests, I accept that evidence. If he meant to include Manpower employees in the comment, I reject that evidence.
To the extent that Mr Reynolds' evidence conflicts with that of Mr Miller or the Manpower electricians about their training, safety awareness and the provision of PPE, I prefer their evidence to that of Mr Reynolds. Their evidence that they were given no training is consistent with the evidence of Mr McGowan. Mr McGowan did not consider it was his responsibility or role to educate external contractors about asbestos.
The Manpower electricians all said that they encountered asbestos in the early part of their time at the RAH. That is not surprising. As Mr Villiers said, the RAH was literally full of asbestos in the early 1990s. The State submitted that "sprayed asbestos covered thousands of metres of structural steelwork". Precautions such as wearing PPE and using the bubble may have applied to RAH/E&BS employees and internal contractors working in asbestos zones, but did not apply to Mr Miller during his time at the RAH.
(Footnotes omitted)
Mr Busuttil stated that all tradesmen at the RAH had to assume that the risers, ceiling spaces and catacombs were contaminated with asbestos and if they were not taking precautions to protect themselves, they were not doing the right thing. He assumed that his level of knowledge of asbestos was shared by all who worked at the RAH and was plainly wrong about that. His evidence went well beyond his limited experience at the RAH. It is unfortunate that the ALU[56] or AMU[57] did not suggest to RAH management that all tradespersons and labourers should wear masks in risers, ceiling spaces and the catacombs.
I accept the submission of counsel for Mr Miller that Mr Busuttil's evidence about the knowledge of the ALU and the DLI supports Mr Miller's case because Mr Busuttil agreed that by the late 1980s:
(b) the State knew that asbestos fibres were carcinogenic, and that there was no safe level of exposure to asbestos dust;
(c) the State knew that asbestos dust could be friable and resuspended in the air if tradesmen disturbed it;
(d) the State considered that workers at the RAH should be provided with an induction, training and information regarding asbestos and the need to protect themselves from it;
(e) the State knew that because of the risk that any service riser, ceiling space and catacomb at the RAH might be contaminated with asbestos, all of these areas were deemed by the ALU to be contaminated with asbestos; and
(f) the State knew that any tradesman entering a service riser, ceiling space or catacomb at the RAH should wear respiratory protection at all times because of the risk of exposure to asbestos.
Mr Carlaw claimed that if Mr Miller had been supervised by Luke Barnard, he would not have been allowed to knowingly undertake work with asbestos without PPE and adhering to procedures. Like the evidence of the other former RAH managers, Mr Carlaw's evidence was given through the prism of someone familiar with the treatment and management of RAH employees and internal contractors. His account is neither relevant nor accurate in relation to the Manpower electricians and Mr Miller.
Mr Carlaw's evidence that inductions took place from the mid to late 1980s is qualified by Mr Maybank's evidence that he, and by logical extension the RAH, did not arrange for external contractors who worked at the RAH to be inducted. The induction Mr Carlaw described only took 20 minutes and involved completing a one page document by ticking boxes.
Mr Carlaw said there was asbestos in the East Wing and North Wing, specifically in outpatients, the theatre block and the risers. The policies and procedures he described for working safely with asbestos did not apply to external contractors like Mr Miller, Mr Drury, Mr Bastian and Mr Villiers.
Mr Carlaw said that the asbestos register 'supposedly' described all areas where asbestos was present. He used his fingers to place air quotation marks around the word 'supposedly'. It was apparent that he did not think the register was reliable. Mr Carlaw said that each tradesman could choose whether to wear a mask when working outside of an asbestos zone. [Footnotes omitted]
Despite the evidence of some of the witnesses called by the State, it was found that inductions and asbestos awareness training were not provided to external contractors when Mr Miller worked at the RAH as Mr Miller, his liability witnesses and Mr McGowan all testified.
9.1 It took reasonable steps to eliminate, mitigate and/or otherwise protect workers, including the Applicant, undertaking works in the hospital against the risk of exposure to asbestos, by:
9.1.1Commencing a process in the 1980s to remove asbestos from asbestos contaminated areas, which continued in the 1990s and thereafter.
9.1.2Identifying asbestos contaminated areas within the hospital and maintaining a record of its location, fibre type and condition.
9.1.3 Adopting the procedures set down by Code of Practice identified in South Australian Health Commission Technical Bulletin 24 ("the Code").
9.1.4 Adopting the procedures laid down by the Occupational, Health, Safety and Welfare (Asbestos) Regulations 1991 after their commencement on 1 April 1991.
9.1.5 Notifying workers of the presence of asbestos in areas of the hospital where works were to be carried out.
9.1.6 Notifying workers of the existence of the Code and the need to meet its requirements.
9.1.7 Requiring that workers be trained in relation to the risks arising from exposure to asbestos before commencing to undertake work at the hospital.
9.1.8 Requiring workers to wear respiratory protective equipment and protective clothing:
9.1.8.1Whenever works were required to be undertaken in the immediate vicinity of asbestos.
9.1.8.2 During the performance of maintenance and alteration work that could give rise to disturbing asbestos including when removing ceiling tiles and undertaking works in suspended ceiling spaces.
9.1.9 Requiring workers to wear protective equipment until the works which disturbed or was likely to disturb asbestos was finished and the area had been cleaned by vacuum cleaning and all asbestos waste removed.
9.1.10Requiring workers and equipment leaving work areas to first be decontaminated by either vacuum cleaning or washing.
Mr Roberts relied on the decision of Hazeldene's Chicken Farm v VWA (No 2) (2005) 13 VR 435. Whilst it is not a binding decision on this Court, it is a helpful summary outlining what considerations a court should consider when making a determination on costs following the making of Calderbank offers. The court in Hazeldene said that the following matters that should be borne in mind. First, what stage the proceedings were at when the offer was received. Secondly, the time allowed to consider the offer. Thirdly, the extent of the compromise offer. Fourthly, the prospects of success from the date of the offer. Fifthly, the clarity in which the terms were expressed and finally, whether the offer foreshadowed indemnity costs in the event the offeree rejected it. We agree that there (sic) are the appropriate criteria to consider.
(1) Each of the following principles are subject to -
(a) the presumptive costs rules in rule 194.4 (to the extent that the Court does not otherwise order);
(b) other applicable rules;
(c) other applicable principles; and
(d) the overriding discretion of the Court as to costs.
(1) In exercising its discretion as to costs, the Court may have regard to any factors it considers relevant.
(2) For example, the Court may have regard to the following factors -
(a) any misconduct or unreasonable conduct of a party in connection with a proceeding;
(b) any breach by a party of overarching obligations, these Rules or an order of the Court;
(c) any breach by a party of the pre-action obligations imposed by Chapter 7 Part 1;
(d) the making or not making of an offer by a party to resolve the proceeding;
(e) the non-acceptance by a party of an offer made by another party to resolve the proceeding;
(f) the value and importance of the relief sought or any relief obtained;
(g) any public interest in the subject matter of the proceeding or public benefit from the prosecution or defence of the proceeding; or
(h) whether costs awarded are to be met by a person or out of a fund.
**Note - **
See also rule 61.16 in relation to pre-action steps and rule 132.11 and rule 132.12 in relation to formal offers.
[2] Applicant's Submissions on Costs [41].
[3] Oshlack v Richmond River Council [1998] HCA 11 [44]; [1998] HCA 11; (1998) 193 CLR 72.
[4] Applicant's Submissions on Costs [11].
[13] [2012] SASCFC 97 [8].
[18] Written submissions of the first respondent on costs [11.a.].
[20] Closing submissions of the first respondent dated 23 July 2025 [59]-[66], [295]-[296].
[21] Written submissions of the first respondent on costs [21].
[23] Gerson v Simpson Reitlinger and Others, Third Parties (1903) 2 KB 197 at 203 per Collins MR; Simpson v British Industries Trust Ltd (1923) 39 TLR 286; Jerred and Others v T Roddam Dent & Son Ltd; (Glen Line Ltd Third Party) [1948] 2 All ER 104 at 110 per Atkinson J; Sinclair v William Arnott Pty Ltd (No. 2) (1963) 64 SR (NSW) 88 at 96 per Walsh J.
[24] Further Written submissions of the First respondent on costs [5].
[25] Written submissions of the third parties [1].
[30] [1971] Ch. 700 [718].
[32] Ibid [1] per Brennan CJ referring to Latoudis v Casey [1990] HCA 59; (1990) 170 CLR 534 at 542.
[34] Written submissions of the first respondent on costs [14].
[35] Second Defence of the first respondent [9.1.7].
[36] Written submissions of the first respondent on costs [14].
[40] Written submissions of the first respondent on costs [21].
[44] Tr 1351, 25-37; Tr 1352, 27-36; Primary decision [655]-[656].
[45] Applicant's Submissions on Costs [32].
[46] Applicant's Submissions on Costs [31].
[47] The RAH Engineering and Building Services Department.
[48] Witness statement dated 6 March 2025 [29].
[52] The South Australian Department of Labour and Industry.
[54] In the primary decision, internal contractors is the label used to describe contractors who were engaged by the RAH and were not employed by a third party. Unlike external contractors, internal contractors were under the direct control and supervision of RAH management.
[57] The RAH Asbestos Management Unit which was replaced by the ALU in or about 1985.
[60] Second Defence of the first respondent.
[63] [2020] SASCFC 120 [9].
[67] Evidence summarised at [538]-[573] primary decision.
[68] Evidence summarised at [574]-[593] primary decision.
[69] Evidence summarised at [594]-[628] primary decision.
Miller
The State of South Australia & Ors [2026] SAET 10
(1998) 193 CLR 72
(1990) 170 CLR 534
(1986) 71 ALR 281
(2005) 13 VR 435
(1988) 81 ALR 397
(1993) 46 FCR 225