[2009] NSWLEC 1402
Land and Environment Court (NSW)
2009-08-24
Original judgment source is linked above.
The applicant must submit to the Certifying Authority BASIX Certificate No.A37196 with any application for a Construction Certificate .
Note : Where there is any proposed change in the BASIX commitments the applicant must submit of a new BASIX Certificate to the Certifying Authority and Council. If any proposed change in the BASIX commitments are inconsistent with development consent (See: Clauses 145 and 146 of the Regulation ) the applicant will be required to submit an amended development application to Council pursuant to section 96 of the Act.
All commitments in the BASIX Certificate must be shown on the Construction Certificate plans and specifications prior to the issue of any Construction Certificate .
Note : Clause 145(1)(a1) of the Environmental Planning & Assessment Regulation 2000 provides: "A certifying authority must not issue a construction certificate for building work unless it is satisfied of the following matters: (a1) that the plans and specifications for the building include such matters as each relevant BASIX certificate requires,"
C.4 Structural Adequacy of Existing Supporting Structures
A certificate from a professional engineer (Structural Engineer), certifying the adequacy of the existing supporting structure to support the additional loads proposed to be imposed by the development, must be submitted with the Construction Certificate application.
Note : This condition is imposed to ensure that the existing structure structural is able to support the additional loads proposed.
The Construction Certificate plans and specifications, required by clause 139 of the Regulation, must include detailed professional engineering plans and/or specifications for all structural, electrical, hydraulic, hydro-geological, geotechnical, mechanical and civil work complying with this consent, approved plans, the statement of environmental effects and supporting documentation. Detailed professional engineering plans and/or specifications must be submitted to the Certifying Authority with the application for any Construction Certificate .
Note: This does not affect the right of the developer to seek staged Construction Certificates
C.6 Stormwater discharge to existing Stormwater Drainage System (Clause 25(2) WLEP 1995)
The Construction Certificate plans and specifications required by clause 139 of the Regulation , must detail :
a. the location of the existing Stormwater Drainage System including all pipes, inspection openings, surface drains, pits and their discharge location, b. the state of repair of the existing Stormwater Drainage System , c. any remedial works required to upgrade the existing Stormwater Drainage System to comply with the BCA, d. any remedial works required to upgrade the existing Stormwater Drainage System crossing the footpath and any new kerb outlets, e. any new Stormwater Drainage System complying with the BCA, f. interceptor drain(s) at the site boundary to prevent stormwater flows from the site crossing the footpath, g. any rainwater tank required by BASIX commitments including their overflow connection to the Stormwater Drainage System , and h. general compliance with the Council's draft Development Control Plan Stormwater Drainage Management (draft version 1, public exhibition copy dated 14 December 2006)
Where any new Stormwater Drainage System crosses the footpath area within any road, separate approval under section 138 of the Roads Act 1993 must be obtained from Council for those works prior to the issue of any Construction Certificate .
All Stormwater Drainage System work within any road or public place must comply with Woollahra Municipal Council's Specification for Roadworks, Drainage and Miscellaneous Works dated January 2003.
Note: Clause F1.1 of Volume 1 and Part 3.1.2 of Volume 2 of the BCA provide that stormwater drainage complying with AS/NZS 3500.3 Plumbing and drainage - Part 3: Stormwater drainage is deemed-to-satisfy the BCA. Council's specifications apply in relation to any works with any road or public place.
Note : Stormwater Drainage Systems must not discharge to any Sewer System. It is illegal to connect stormwater pipes and drains to the sewerage system as this can overload the system and cause sewage overflows. See: http://www.sydneywater.com.au/Publications/Factsheets/SewerfixLookingAfterYourSewerPipes.pdf
Note : Woollahra Municipal Council's Specification for Roadworks, Drainage and Miscellaneous Works dated January 2003 and Council's draft Development Control Plan Stormwater Drainage Management (draft version 1.1, public exhibition copy dated 14 December 2006) can be downloaded from Council's website: www.woollahra.nsw.gov.au
D. Conditions which must be satisfied prior to the commencement of any development work
D.1 Compliance with Building Code of Australia and insurance requirements under the Home Building Act 1989
For the purposes of section 80A (11) of the Act, the following conditions are prescribed in relation to a development consent for development that involves any building work:
a. that the work must be carried out in accordance with the requirements of the Building Code of Australia, b. in the case of residential building work for which the Home Building Act 1989 requires there to be a contract of insurance in force in accordance with Part 6 of that Act, that such a contract of insurance is in force before any building work authorised to be carried out by the consent commences.
a. to the extent to which an exemption is in force under clause 187 or 188, subject to the terms of any condition or requirement referred to in clause 187 (6) or 188 (4), or b. to the erection of a temporary building.
In this condition, a reference to the BCA is a reference to that code as in force on the date the application for the relevant construction certificate is made. Note : This condition must be satisfied prior to commencement of any work in relation to the contract of insurance under the Home Building Act 1989. This condition also has effect during the carrying out of all building work with respect to compliance with the Building Code of Australia.
D.2 Security Fencing, Hoarding and Overhead Protection
Security fencing must be provided around the perimeter of the development site, including any additional precautionary measures taken to prevent unauthorised entry to the site at all times during the demolition, excavation and construction period. Security fencing must be the equivalent 1.8m high chain wire as specified in AS 1725.
Where the development site adjoins a public thoroughfare, the common boundary between them must be fenced for its full length with a hoarding, unless the least horizontal distance between the common boundary and the nearest parts of the structure is greater than twice the height of the structure. The hoarding must be constructed of solid materials (chain wire or the like is not acceptable) to a height of not less than 1.8 m adjacent to the thoroughfare.
Where a development site adjoins a public thoroughfare with a footpath alongside the common boundary then, in addition to the hoarding required above, the footpath must be covered by an overhead protective structure and the facing facade protected by heavy-duty scaffolding, unless either
a. the vertical height above footpath level of the structure being demolished is less than 4.0 m; or b. the least horizontal distance between footpath and the nearest part of the structure is greater than half the height of the structure.
The overhead structure must consist of a horizontal platform of solid construction and vertical supports, and the platform must
a. extend from the common boundary to 200mm from the edge of the carriageway for the full length of the boundary; b. have a clear height above the footpath of not less than 2.1 m; terminate 200mm from the edge of the carriageway (clearance to be left to prevent impact from passing vehicles) with a continuous solid upstand projecting not less than 0.5 m above the platform surface; and c. together with its supports, be designed for a uniformly distributed live load of not less than 7 kPa.
The principal contractor or owner builder must pay all fees associated with the application and occupation and use of the road (footway) for required hoarding or overhead protection.
The principal contractor or owner builder must ensure that Overhead Protective Structures are installed and maintained in accordance with WorkCover NSW Code of Practice - Overhead Protective Structures, gazetted 16 December 1994, as commenced 20 March 1995. This can be downloaded from: http://www.workcover.nsw.gov.au/Publications/LawAndPolicy/CodesofPractice/oheadprotstructs.htm .
Security fencing, hoarding and overhead protective structure must not obstruct access to utilities services including but not limited to man holes, pits, stop valves, fire hydrants or the like.
Note : The principal contractor or owner must allow not less than two (2) weeks from the date of making a hoarding application for determination. Any approval for a hoarding or overhead protection under the Roads Act 1993 will be subject to its own conditions and fees.
Standard Condition: D11 D.3 Site Signs
The Principal Contractor or owner builder must ensure that the sign required by clauses 98A and 227A of the Regulation is erected and maintained at all times.
For the purposes of section 80A (11) of the Act , the requirements of subclauses (2) and (3) are prescribed as conditions of a development consent for development that involves any building work, subdivision work or demolition work.
A sign must be erected in a prominent position on any site on which building work, subdivision `work or demolition work is being carried out:
a. showing the name, address and telephone number of the principal certifying authority for the work, and b. showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours, and c. stating that unauthorised entry to the work site is prohibited.
Any such sign is to be maintained while the building work, subdivision work or demolition work is being carried out, but must be removed when the work has been completed.
This clause does not apply in relation to building work, subdivision work or demolition work that is carried out inside an existing building that does not affect the external walls of the building.
This clause does not apply in relation to Crown building work that is certified, in accordance with section 116G of the Act, to comply with the technical provisions of the State's building laws."
Note : PCA and principal contractors must also ensure that signs required by this clause are erected and maintained (see clause 227A which imposes a penalty exceeding $1,000).
Note : If Council is appointed as the PCA it will provide the sign to the principal contractor or owner builder who must ensure that the sign is erected and maintained as required by Clause 98A of the Regulation .
Standard Condition: D12 D.4 Building - Construction Certificate, Appointment of Principal Certifying Authority, Appointment of Principal Contractor and Notice of Commencement (s81A(2) of the Act) The erection of the building in accordance with this development consent must not be commenced until:
a. a construction certificate for the building work has been issued by the consent authority, the council (if the council is not the consent authority) or an accredited Certifier, and
b. the person having the benefit of the development consent has: i. appointed a principal certifying authority for the building work, and ii. notified the principal certifying authority that the person will carry out the building work as an owner-builder, if that is the case, and
b1. the principal certifying authority has, no later than 2 days before the building work commences: i. notified the consent authority and the council (if the council is not the consent authority) of his or her appointment, and ii. notified the person having the benefit of the development consent of any critical stage inspections and other inspections that are to be carried out in respect of the building work, and
b2. the person having the benefit of the development consent, if not carrying out the work as an owner-builder, has: i. appointed a principal contractor for the building work who must be the holder of a contractor licence if any residential building work is involved, and ii. notified the principal certifying authority of any such appointment, and iii. unless that person is the principal contractor, notified the principal contractor of any critical stage inspections and other inspections that are to be carried out in respect of the building work, and iv. given at least 2 days' notice to the council of the person's intention to commence the erection of the building.
Note: building has the same meaning as in section 4 of the Act and includes part of a building and any structure or part of a structure.
Note : new building has the same meaning as in section 109H of the Act and includes an altered portion of, or an extension to, an existing building.
Note : The commencement of demolition works associated with an altered portion of, or an extension to, an existing building is considered to be the commencement of building work requiring compliance with section 82A(2) of the Act (including the need for a Construction Certificate ) prior to any demolition work. See: Over our Dead Body Society Inc v Byron Bay Community Association Inc [2001] NSWLEC 125.
Note : Construction Certificate Application, PCA Service Agreement and Notice of Commencement forms can be downloaded from Council's website www.woollahra.nsw.gov.au .
Note : It is an offence for any person to carry out the erection of a building in breach of this condition and in breach of section 81A(2) of the Act.
Standard Condition: D15 D.5 Notification of Home Building Act 1989 requirements
a. For the purposes of section 80A (11) of the Act, the requirements of this condition are prescribed as conditions of a development consent for development that involves any residential building work within the meaning of the Home Building Act 1989 .
b. Residential building work within the meaning of the Home Building Act 1989 must not be carried out unless the principal certifying authority for the development to which the work relates (not being the council) has given the council written notice of the following information: i. in the case of work for which a principal contractor is required to be appointed: o the name and licence number of the principal contractor, and o the name of the insurer by which the work is insured under Part 6 of that Act, ii. in the case of work to be done by an owner-builder:
the name of the owner-builder, and if the owner-builder is required to hold an owner-builder permit under that Act, the number of the owner-builder permit. c. If arrangements for doing the residential building work are changed while the work is in progress so that the information notified under subclause (2) becomes out of date, further work must not be carried out unless the principal certifying authority for the development to which the work relates (not being the council) has given the council written notice of the updated information.
d. This clause does not apply in relation to Crown building work that is certified, in accordance with section 116G of the Act, to comply with the technical provisions of the State's building laws. Standard Condition: D17
D.6 Establishment of boundary location, building location and datum
Prior to the commencement of any work the principal contractor or owner builder must ensure that a surveyor registered under the Surveying Act 2002 sets out:
a. the boundaries of the site by permanent marks (including permanent recovery points); b. the location and level of foundation excavations, footings, walls and slabs by permanent marks, pegs or profiles relative to the boundaries of the land and relative to Australian Height Datum ("AHD") in compliance with the approved plans; c. establishes a permanent datum point (bench mark) within the boundaries of the site relative to AHD; and d. provides a copy of a survey report by the registered surveyor detailing, the title boundaries, pegs/profiles, recovery points and bench mark locations as established pursuant to this condition to the PCA.
Note : Where the principal contractor or owner builder notes any discrepancy between the approved development consent and the Construction Certificate , especially in relation to the height, location or external configuration of the building (but not limited to these issues) the principal contractor or owner builder should not proceed until satisfied that the variations as shown are consistent with the consent. Failure to do so may result in a breach of development consent.
Note : On larger developments, or where boundary redefinition is required, the placement of new State Survey Marks as permanent marks should be considered by the registered surveyor.
E. Conditions which must be satisfied during any development work
E.1 Compliance with Building Code of Australia and insurance requirements under the Home Building Act 1989
For the purposes of section 80A (11) of the Act, the following condition is prescribed in relation to a development consent for development that involves any building work:
a. that the work must be carried out in accordance with the requirements of the Building Code of Australia, b. in the case of residential building work for which the Home Building Act 1989 requires there to be a contract of insurance in force in accordance with Part 6 of that Act, that such a contract of insurance is in force before any building work authorised to be carried out by the consent commences.
This condition does not apply: a. to the extent to which an exemption is in force under clause 187 or 188, subject to the terms of any condition or requirement referred to in clause 187 (6) or 188 (4) of the Regulation, or b. to the erection of a temporary building.
In this clause, a reference to the BCA is a reference to that Code as in force on the date the application for the relevant construction certificate is made. Standard Condition: E1
E.2 Compliance with Australian Standard for Demolition
Demolition of buildings and structures must comply with Australian Standard AS 2601 - 1991: The Demolition of Structures, published by Standards Australia, and as in force at 1 July 1993. Standard Condition: E2
Critical stage inspections must be called for by the principal contractor or owner builder as required by the PCA, any PCA service agreement, the Act and the Regulation .
Work must not proceed beyond each critical stage until the PCA is satisfied that work is proceeding in accordance with this consent, the Construction Certificate(s) and the Act . critical stage inspections means the inspections prescribed by the Regulations for the purposes of section 109E(3)(d) of the Act or as required by the PCA and any PCA Service Agreement.
Note : The PCA may require inspections beyond mandatory critical stage inspections in order that the PCA be satisfied that work is proceeding in accordance with this consent.
Note : The PCA may, in addition to inspections, require the submission of Com pliance Certificates , survey reports or evidence of suitability in accordance with Part A2.2 of the BCA in relation to any matter relevant to the development.
a. No work must take place on any Sunday or public holiday, b. No work must take place before 7am or after 5pm any weekday, c. No work must take place before 7am or after 1pm any Saturday, and d. No piling, piering, cutting, boring, drilling, rock breaking, rock sawing, jack hammering or bulk excavation of land or loading of material to or from trucks must take place before 9am or after 4pm any weekday, or before 9am or after 1pm any Saturday. e. No rock excavation being cutting, boring, drilling, breaking, sawing, jack hammering or bulk excavation of rock, must occur without a 15 minute break every hour.
This condition has been imposed to mitigate the impact of work upon the amenity of the neighbourhood. Impact of work includes, but is not limited to, noise, vibration, dust, odour, traffic and parking impacts.
Note : The use of noise and vibration generating plant and equipment and vehicular traffic, including trucks in particular, significantly degrade the amenity of neighbourhoods and more onerous restrictions apply to these activities. This more invasive work generally occurs during the foundation and bulk excavation stages of development. If you are in doubt as to whether or not a particular activity is considered to be subject to the more onerous requirement (9am to 4pm weekdays and 9am to 1pm Saturdays) please consult with Council.
Note : Each and every breach of this condition by any person may be subject to separate penalty infringement notice or prosecution.
Note : The delivery and removal of plant, equipment and machinery associated with wide loads subject to RTA and Police restrictions on their movement out side the approved hours of work will be considered on a case by case basis.
Note : Compliance with these hours of work does not affect the rights of any person to seek a remedy to offensive noise as defined by the Protection of the Environment Operations Act 1997, the Protection of the Environment Operations (Noise Control) Regulation 2000.
Note : EPA Guidelines can be down loaded from http://www.epa.nsw.gov.au/noise/nglg.htm .
E.5 Maintenance of Vehicular and Pedestrian Safety and Access
The principal contractor or owner builder and any other person acting with the benefit of this consent must:
a. Not erect or maintain any gate or fence swing out or encroaching upon the road or the footway. b. Not use the road or footway for the storage of any article, material, matter, waste or thing. c. Not use the road or footway for any work . d. Keep the road and footway free of any obstruction and rectify any damage, including any trip hazard sustained to road and/or footway as a result of the work. e. Not stand any plant and equipment upon the road or footway.
This condition does not apply to the extent that a permit or approval exists under the section 73 of the Road Transport (Safety and Traffic Management) Act 1999, section 138 of the Roads Act 1993 or section 94 of the Local Government Act 1993 except that at all time compliance is required with:
a. Australian Standard AS 1742 (Set) Manual of uniform traffic control devices and all relevant parts of this set of standards. b. Australian Road Rules to the extent they are adopted under the Road Transport (Safety and Traffic Management) (Road Rules) Regulation 1999.
Note : Section 73 of the Road Transport (Safety and Traffic Management) Act 1999 allows the Police to close any road or road related area to traffic during any temporary obstruction or danger to traffic or for any temporary purpose. Any road closure requires Police approval.
Note : Section 138 of the Roads Act 1993 provides that a person must not: (a) erect a structure or carry out a work in, on or over a public road, or (b) dig up or disturb the surface of a public road, or (c) remove or interfere with a structure, work or tree on a public road, or (d) pump water into a public road from any land adjoining the road, or (e) connect a road (whether public or private) to a classified road, otherwise than with the consent of the appropriate roads authority.
Note : Section 68 of the Local Government Act 1993 provides that a person may carry out certain activities only with the prior approval of the council including: Part C Management of Waste:
"1. For fee or reward, transport waste over or under a public place 2. Place waste in a public place 3. Place a waste storage container in a public place." Part E Public roads:
"1. Swing or hoist goods across or over any part of a public road by means of a lift, hoist or tackle projecting over the footway 2. Expose or allow to be exposed (whether for sale or otherwise) any article in or on or so as to overhang any part of the road or outside a shop window or doorway abutting the road, or hang an article beneath an awning over the road." Any work in, on or over the Road or Footway requires Council Approval and in the case of classified roads the NSW Roads and Traffic Authority. Road includes that portion of the road uses as a footway. Standard Condition: E7
All persons must comply with Council's Tree Preservation Order ("the TPO"), other than where varied by this consent. The order applies to any tree, with a height greater than 5 metres or a diameter spread of branches greater than 3 metres, is subject to Council's Tree Preservation Order unless, exempted by specific provisions. Works to be carried out within a 5 metre radius of any tree, subject to the Tree Preservation Order, require the prior written consent of Council.
a. Where excavation encounters tree roots with a diameter exceeding 40mm excavation must cease. The principal contractor must procure an inspection of the tree roots exposed by a qualified arborist. Excavation must only recommence with the implementation of the recommendations of the qualified arborist or where specific instructions are given by Council's Tree Management Officer in strict accordance with such Council instructions.
b. Where there is damage to any part of a tree the principal contractor must procure an inspection of the tree by a qualified arborist immediately. The principal contractor must immediately implement treatment as directed by the qualified arborist or where specific instructions are given by Council's Tree Management Officer in strict accordance with such Council instructions.
Note : Trees must be pruned in accordance with Australian Standard AS 4373 - 2007 "Pruning of Amenity Trees" and Workcover NSW Code of Practice Amenity Tree Industry 1998.
A person must not to do anything on or in relation to the site (the supporting land) that removes the support provided by the supporting land to any other land (the supported land) or building (the supported building).
For the purposes of this condition, supporting land includes the natural surface of the site, the subsoil of the site, any water beneath the site, and any part of the site that has been reclaimed.
Note : This condition does not authorise any trespass or encroachment upon any adjoining or supported land or building whether private or public. Where any underpinning, shoring, soil anchoring (temporary or permanent) or the like is considered necessary upon any adjoining or supported land by any person the principal contractor or owner builder must obtain: a) the consent of the owners of such adjoining or supported land to trespass or encroach, or b) an access order under the Access to Neighbouring Land Act 2000, or c) an easement under section 88K of the Conveyancing Act 1919, or d) an easement under section 40 of the Land & Environment Court Act 1979 as appropriate.
Note : Section 177 of the Conveyancing Act 1919 creates a statutory duty of care in relation to support of land. Accordingly, a person has a duty of care not to do anything on or in relation to land being developed (the supporting land) that removes the support provided by the supporting land to any other adjoining land (the supported land).
Note : Clause 20 of the Roads (General) Regulation 2000 prohibits excavation in the vicinity of roads as follows: " Excavations adjacent to road - A person must not excavate land in the vicinity of a road if the excavation is capable of causing damage to the road (such as by way of subsidence) or to any work or structure on the road." Separate approval is required under the Roads Act 1993 for any underpinning, shoring, soil anchoring (temporary)) or the like within or under any road. Council will not give approval to permanent underpinning, shoring, soil anchoring within or under any road.
Note : The encroachment of work or the like is a civil matter of trespass or encroachment and Council does not adjudicate or regulate such trespasses or encroachments except in relation to encroachments upon any road, public place, crown land under Council's care control or management, or any community or operational land as defined by the Local Government Act 1993.
Standard Condition: E13 E.8 Check Surveys - boundary location, building location, building height, stormwater drainage system and flood protection measures relative to Australian Height Datum
The Principal Contractor or Owner Builder must ensure that a surveyor registered under the Surveying Act 2002 carries out check surveys and provides survey certificates confirming the location of the building(s) and the stormwater drainage system relative to the boundaries of the site and that the height of buildings and the stormwater drainage system relative to Australian Height Datum complies with this consent at the following critical stages.
The Principal Contractor or Owner Builder must ensure that work must not proceed beyond each of the following critical stages until compliance has been demonstrated to the PCA's satisfaction:
a) Upon the completion of foundation walls prior to the laying of any floor or the pouring of any floor slab and generally at damp proof course level; b) Upon the completion of formwork for floor slabs prior to the laying of any floor or the pouring of any concrete and generally at each storey; c) Upon the completion of formwork or framework for the roof(s) prior to the laying of any roofing or the pouring of any concrete roof; d) Upon the completion of formwork and steel fixing prior to pouring of any concrete for any ancillary structures, swimming pool or spa pool or the like; e) Driveway transitions and crest thresholds prior to pavement of driveways; f) Stormwater Drainage Systems prior to or post construction confirming location, height and capacity of works. g) Flood protection measures are in place confirming location, height and capacity.
Note : This condition has been imposed to ensure that development occurs in the location and at the height approved under this consent.
The principal contractor or owner builder must ensure that all waste storage containers, including but not limited to skip bins, must be stored within the site unless:
a) Activity Approval has been issued by Council under section 94 of the Local Government Act 1993 to place the waste storage container in a public place, and b) Where located on the road it is located only in a positions where a vehicle may lawfully park in accordance with the Australian Road Rules to the extent they are adopted under the Road Transport (Safety and Traffic Management) (Road Rules) Regulation 1999.
Note : Waste storage containers must not be located on the footpath without a site specific activity approval. Where such site specific activity approval is granted a 1.5m wide clear path of travel is maintained free of any trip hazards.
Dust mitigation must be implemented in accordance with " Dust Control - Do it right on site " published by the Southern Sydney Regional Organisation of Councils.
a) Dust screens to all hoardings and site fences. b) All stockpiles or loose materials to be covered when not being used. c) All equipment, where capable, being fitted with dust catchers. d) All loose materials being placed bags before placing into waste or skip bins. e) All waste and skip bins being kept covered when not being filled or emptied. f) The surface of excavation work being kept wet to minimise dust. g) Landscaping incorporating trees, dense shrubs and grass being implemented as soon as practically possible to minimise dust.
Note 1 : " Dust Control - Do it right on site " can be down loaded free of charge from Council's web site www.woollahra.nsw.gov.au or obtained from Council's office.
Note 2: Special precautions must be taken when removing asbestos or lead materials from development sites. Additional information can be obtained from www.workcover.nsw.gov.au and www.epa.nsw.gov.au . Other specific condition and advice may apply.
Note 3: Demolition and construction activities may affect local air quality and contribute to urban air pollution. The causes are dust, smoke and fumes coming from equipment or activities, and airborne chemicals when spraying for pest management. Precautions must be taken to prevent air pollution.
F. Conditions which must be satisfied prior to any occupation or use of the building (Part 4A of the Act and Part 8 Division 3 of the Regulation)
F.1 Occupation Certificate (section 109M of the Act)
A person must not commence occupation or use of the whole or any part of a new building (within the meaning of section 109H (4) of the Act ) unless an occupation certificate has been issued in relation to the building or part. Note : New building includes an altered portion of, or an extension to, an existing building.
F.2 Commissioning and Certification of Systems and Works
The principal contractor or owner builder must submit to the satisfaction of the PCA works-as-executed ("WAE") plans, Compliance Certificates and evidence of suitability in accordance with Part A2.2 of the BCA confirming that the works , as executed and as detailed, comply with the requirement of this consent, the Act , the Regulations , any relevant construction certificate , the BCA and relevant Australian Standards .
Works-as-executed ("WAE") plans, Compliance Certificates and evidence of suitability in accordance with Part A2.2 of the BCA must including but may not be limited to:
a. Certification from the supervising professional engineer that the requirement of the Geotechnical / Hydrogeological conditions and report recommendations were implemented and satisfied during development work. b. All flood protection measures. c. All garage/car park/basement car park, driveways and access ramps comply with Australian Standard AS 2890.1 - "Off-Street car parking." d. All stormwater drainage systems. e. All mechanical ventilation systems. f. All hydraulic systems. g. All structural work. h. All acoustic attenuation work. i. All waterproofing. j. Such further matters as the Principal Certifying Authority may require.
Note : This condition has been imposed to ensure that systems and works as completed meet development standards as defined by the Act , comply with the BCA, comply with this consent and so that a public record of works as execute is maintained.
Note : The PCA may require any number of WAE plans, certificates, or other evidence of suitability as necessary to confirm compliance with the Act , Regulation , Development Standards, BCA , and relevant Australia Standards . As a minimum WAE plans and certification is required for stormwater drainage and detention, mechanical ventilation work, hydraulic services (including but not limited to fire services).
Note : The PCA must submit to Council, with any Occupation Certificate , copies of works-as-executed ("WAE") plans, Compliance Certificates and evidence of suitability in accordance with Part A2.2 of the BCA upon which the PCA has relied in issuing any Occupation Certificate .
G. Conditions which must be satisfied prior to the issue of any Subdivision Certificate
H. Conditions which must be satisfied prior to the issue of a Final Occupation Certificate (s109C(1)(c))
H.1 Fulfillment of BASIX commitments - Clause 154B of the Regulation
All BASIX commitments must be effected in accordance with the BASIX Certificate No.A37196.
Note : Clause 154B(2) of the Environmental Planning & Assessment Regulation 2000 provides: "A certifying authority must not issue a final occupation certificate for a BASIX affected building to which this clause applies unless it is satisfied that each of the commitments whose fulfilment it is required to monitor has been fulfilled."
Standard Condition: H7 I. Conditions which must be satisfied during the ongoing use of the development
All BASIX commitments must be maintained in accordance with the BASIX Certificate No.A37196.
Note: This condition affects successors in title with the intent that environmental sustainability measures must be maintained for the life of development under this consent.
Noise from the operation of mechanical plant and equipment must not exceed background noise when measured at the nearest lot boundary of the site. Where noise sensitive receivers are located within the site, noise from the operation of mechanical plant and equipment must not exceed background noise when measured at the nearest strata, stratum or community title boundary.
Reason : This condition has been imposed to protect the amenity of the neighbourhood.
Note : Words in this condition have the same meaning as in the: NSW Industrial Noise Policy ( http://www.environment.nsw.gov.au/resources/ind_noise.pdf ) ISBN 0 7313 2715 2, dated January 2000, and Noise Guide for Local Government ( http://www.environment.nsw.gov.au/noise/nglg.htm ) ISBN 1741370671, dated December 2004. Standard Condition: I53
I.3 Retention of Views In order to retain views to Shark Island from the terrace area of Unit 2/23 Wentworth Street, a restriction in accordance with condition I.4 is imposed over the whole of the proposed terrace located off the north-east of Bedroom 1, as shown cross-hatched on the plan marked "Annexure A" being an extract of drawing DA.6 dated 2 November 2009 prepared by Michael Suttor Architects Pty Ltd. Reason: To provide view sharing of Shark Island from 2/23 Wentworth Street
I.4 Retention of Views No structures, other than the clear glass balustrade located on the northern edge of the proposed terrace shall be placed or erected or landscaping installed or permitted to be grown or temporary devices such as umbrellas and other shade structures are to be used on the terrace referred to in condition I.3 unless they do not exceed the height of the dotted black line shown on the attached plan marked "Annexure B" being an extract of drawing DA.9-S prepared by Michael Suttor Architects Pty Ltd. Reason: To provide view sharing of Shark Island from 2/23 Wentworth Street I.5 Roof Structures No structure or device (including without limitation plant, equipment, air conditioning, ventilation, satellite dish, antenna) is to be placed on any part of the approved roof or extending beyond the limits of the approved walls of the dwellings except where: a) it is required to comply with the BCA and does not otherwise require development consent, unreasonably affect water views or views of Shark Island from 2/23 Wentworth Street or represent an unnecessary design solution b) it is shown on the approved plans c) it is required by a condition of development consent
Reason: To provide view sharing of Shark Island from 2/23 Wentworth Street
I.6 Eaves.projections and awnings No eaves, projections, awnings or any other device or structureis to be erected on any part of the roof or extending beyond the limit of the approved walls of the dwelling including the first floor terrace except where: a) required to comply with the BCA and does not otherwise require development consent, unreasonably affect water views or views of Shark Island from 2/23 Wentworth Street or represent an unnecessary design solution b) it is shown on the approved plans c) it is required by a condition of development consent Reason: To provide view sharing of Shark Island from 2/23 Wentworth Street J. Miscellaneous Conditions
K.1 Criminal Offences - Breach of Development Consent & Environmental laws
Failure to comply with this development consent and any condition of this consent is a criminal offence . Failure to comply with other environmental laws are also a criminal offence.
Where there is any breach Council may without any further warning: - Issue Penalty Infringement Notices (On-the-spot fines); - Issue notices and orders; - Prosecute any person breaching this consent; and/or - Seek injunctions/orders before the courts to restrain and remedy any breach.
Maximum Penalties under NSW Environmental Laws include fines up to $1.1 Million and/or custodial sentences for serious offences.
Should Council have to take any action to enforced compliance with this consent or other environmental laws Council's policy is to seek from the Court appropriate orders requiring the payments of its costs beyond any penalty or remedy the Court may order. This consent and this specific advice will be tendered to the Court when seeking costs orders from the Court where Council is successful in any necessary enforcement action.
Note : The payment of environmental penalty infringement notices does not result in any criminal offence being recorded. If a penalty infringement notice is challenged in Court and the person is found guilty of the offence by the Court, subject to section 10 of the Crimes (Sentencing Procedure) Act 1999, a criminal conviction is recorded. The effect of a criminal conviction beyond any fine is serious. You can obtain further information from the following web sites: http://www.theshopfront.org/documents/ConvictionsCriminalRecords.pdf and the Attorney General's www.agd.nsw.gov.au . Standard Advising: K1 K.2 Dial before you dig
The principal contractor , owner builder or any person digging may be held financially responsible by the asset owner should they damage underground pipe or cable networks. Minimise your risk and Dial 1100 Before You Dig or visit www.dialbeforeyoudig.com.au .
When you contact Dial Before You Dig, you will be sent details of all Dial Before You Dig members who have underground assets in the vicinity of your proposed excavation. Standard Advising: K2
Section 81A of the Act requires among other matters that the person having the benefit of the development consent, if not carrying out the work as an owner-builder , must appointed a principal contractor for residential building work who must be the holder of a contractor licence.
Further information can be obtained from the NSW Office of Fair Trading website about how you obtain an owner builders permit or find a principal contractor (builder): http://www.dft.nsw.gov.au/building.html .
The Owner(s) must appoint the PCA . The PCA must check that Home Building Act insurance is in place before the commencement of building work. The Principal Contractor (Builder) must provide the Owners with a certificate of insurance evidencing the contract of insurance under the Home Building Act 1989 for the residential building work.
K.4 Building Standards - Guide to Standards and Tolerances
The PCA does not undertake detailed quality control inspections and the role of the PCA is primarily to ensure that the development proceeds in accordance with this consent, Construction Certificates and that the development is fit for occupation in accordance with its classification under the Building Code of Australia. Critical Stage Inspections do not provide the level of supervision required to ensure that the minimum standards and tolerances specified by the "Guide to Standards and Tolerances©" ISBN 0 7347 6010 8 are achieved.
The quality of any development is a function of the quality of the principal contractor's or owner builder's supervision of individual contractors and trades on a daily basis during the development. The PCA does not undertake this role.
The NSW Office of Fair Trading have published a "Guide to Standards and Tolerances©" ISBN 0 7347 6010 8. The guide can be obtained from the Office of Fair Trading by calling 13 32 20 or by Fax: 9619 8618 or by post to: Marketing Branch, PO Box 972, Parramatta NSW 2124.
The Guide can be down loaded from: http://www.fairtrading.nsw.gov.au/pdfs/corporate/publications/dft242.pdf
Council, as the PCA or otherwise, does not adjudicate building contract disputes between the principal contractor , contractors and the owner. Standard Condition: K6
The Occupational Health and Safety Act 2000 No 40 and subordinate regulations, codes of practice and guidelines control and regulate the development industry. Note : Further information can be obtained from Workcover NSW's website: http://www.workcover.nsw.gov.au/Industry/Construction/default.htm or through their head office: Location: Workcover NSW, 92-100 Donnison Street, GOSFORD 2250 Postal address: WorkCover NSW, Locked Bag 2906, LISAROW 2252, Phone (02) 4321 5000, Fax (02) 4325 4145. Standard Condition: K7
Council is always prepared to discuss its decisions and, in this regard, please do not hesitate to contact:
Sarah Chambers, Senior Assessment Officer on (02) 9391 7064
However, if you wish to pursue your rights of appeal in the Land & Environment Court you are advised that Council generally seeks resolution of such appeals through a Section 34 Conference, site hearings and the use of Court Appointed Experts, instead of a full Court hearing.
This approach is less adversarial, it achieves a quicker decision than would be the case through a full Court hearing and it can give rise to considerable cost and time savings for all parties involved. The use of the Section 34 Conference approach requires the appellant to agree, in writing, to the Court appointed commissioner having the full authority to completely determine the matter at the conference. Standard Condition: K14
An application must be made to Council by the person who paid the security for release of the securities held under section 80A of the Act .
The securities will not be released until a Final Occupation Certificate has lodged with Council, Council has inspected the site and Council is satisfied that the public works have been carried out to Council's requirements. Council may use part or all of the security to complete the works to its satisfaction if the works do not meet Council's requirements.
Council will only release the security upon being satisfied that all damage or all works, the purpose for which the security has been held have been remedied or completed to Council's satisfaction as the case may be.
Council may retain a portion of the security to remedy any defects in any such public work that arise within 6 months after the work is completed.
Upon completion of each section of road, drainage and landscape work to Council's satisfaction, 90% of the Bond monies held by Council for these works will be released upon application. 10% may be retained by Council for a further 6 month period and may be used by Council to repair or rectify any defects or temporary works during the 6 month period.
Note: The Application for Refund of Security form can be downloaded from http://www.woollahra.nsw.gov.au/pdf/Forms/Planning/RefundofSecurity.pdf
K.8 Pruning or Removing a Tree Growing on Private Property
Woollahra Municipal Council's Tree Preservation Order 2006 (TPO) may require that an application be made to Council prior to pruning or removing any tree. The aim is to secure the amenity of trees and preserve the existing landscape within our urban environment.
Before you prune or remove a tree, make sure you read all relevant conditions. You can obtain a copy of the TPO from Council's website www.woollahra.nsw.gov.au or you may contact Council on 9391-7000 for further advice. Standard Condition: K19
G T Brown
Commissioner of the Court
ljr
DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated.
Michael Suttor Pty Limited
Woollahra Municipal Council
CITATION : Michael Suttor Pty Limited v Woollahra Municipal Council [2009] NSWLEC 1402
CASES CITED: Tenacity Consulting v Warringah Council [2004] NSWLEC 140
Note: See Over our Dead Body Society Inc v Byron Bay Community Association Inc [2001] NSWLEC 125.