Melton Crest Apartments [2025] QBCCMCmr 319
The Body Corporate for Melton Crest Apartments (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(b) and 229(3)(a)
INTERIM ORDER - whether an interim order stopping the body corporate from acting on a potentially defective resolution is warranted.
That the Body Corporate engage STP Consultants for the purposes of providing a Civil & Structural: Water Ingress Assessment. The scope of works as detailed in their quote of 6th August 2025 is > > - Detailed survey (by others) scope of work. Includes extent of survey and information required to allow Civil Design and Documentation of a Stormwater rectification. > > - Structural inspection to identify damage, causation, and recommendations for rectification. > > - Civil Stormwater Design and Documentation of remedial design based on report findings. > > Costs advised up to $11.500.00 are to be met from the sinking fund
An order ceasing any action authorised by the carried committee motion of 31 Aug 25 to engage STP Consultants, pending the outcome of a final order.
An order that the carried committee motion of 31 Aug 25 to engage STP Consultants be rescinded.
[22] The BCCMA is a lengthy, technical and complex instrument, with no fewer than six sets of subordinate and similarly complex 'module regulations'. It cannot be the case that the legislature expected all, or even most committee members of a body corporate, small, large or very large, to be experts in corporate law, or masters of community management. Indeed, the BCCMA implicitly recognises that, if this legislation were at all times, and in all circumstances applied with the utmost rigour and most precious attention to detail, its objects and policies would be retarded by endemic disputation, rather than advanced. > > [23] The direction that a 'body corporate must act reasonably' in the performance of its 'general functions' does not suggest that every minor irregularity should be pounced on to impede or paralyse the normal conduct of business. The Code of Conduct for committee members does not demand administrative perfection, but simply directs them to 'take reasonable steps' to comply with the BCCMA. [citations omitted]
For this section, if a series of proposals forms a single project, the cost of carrying out any 1 of the proposals is taken to be more than the relevant limit for committee spending if the cost of the project, as a whole, is more than the relevant limit.
.. this scope of works should be considered an extension of the works completed in 2020...
The proposal is for the acquisition of goods of a particular characteristic. Goods of that characteristic are only obtainable from 1 source.
(3) Advice of the motion must be given, at the same time notice of the motion is given or, in an emergency, as soon as practicable, to each owner of a lot
[3] SDW2 Pty. Ltd. V JLF Corporation Pty Ltd [2017] QSC 1 at [21].
[4] Beecham Group Ltd v Bristol Laboratories Pty Ltd (1968) 118 CLR 618 at [622-623].
[5] Australian Broadcasting Corp v O'Neill [2006] HCA 46; (2006) 227 CLR 57, at [65], [19].
[7] Australian Broadcasting Corporation v O'Neill [2006] HCA 46; (2006) 227 CLR 57 at [65] citing Beecham Group Ltd v Bristol Laboratories Pty Ltd (1968) 118 CLR 618 at [5].
(1968) 118 CLR 618