[2009] NSWLEC 1358
Land and Environment Court (NSW)
2009-09-23
Mr J
Original judgment source is linked above.
The applicant shall confer with Energy Australia to determine if an electricity distribution substation is required. Written confirmation of Energy Australia's requirements shall be obtained prior to issue Construction Certificate.
The applicant shall confer with Energy Australia to determine if installation of electricity conduits in the footway is required. Written confirmation of Energy Australia's requirements shall be obtained prior to issue Construction Certificate.
A dilapidation survey shall be undertaken of all properties and/or Council infrastructure, including but not limited to all footpaths, kerb and gutter, stormwater inlet pits, and road carriageway pavements, in the vicinity which could be potentially affected by the construction of this development. Any damage caused to other properties during construction shall be rectified. A copy of the dilapidation survey and an insurance policy that covers the cost of any rectification works shall be submitted to the Accredited Certifier (AC) prior to issue of the Construction Certificate. The insurance cover shall be a minimum of $10 million.
Prior to the issue of the Construction Certificate a permit pursuant to Section 138 of the Roads Act 1993 shall be obtained from Council for the following works in Beach Street as outlined in the concept stormwater plans:
ii) The installation of 375mm ø and 450mm ø reinforced concrete pipe;
iv) The reconstruction of an existing kerb inlet pit to a heavy duty grated inlet pit.
The design and documentation of the works shall be in accordance with Council's design specification. Design checking fees apply to the assessment of the plans and issue of the permit.
Prior to issue of the Construction Certificate, a longitudinal driveway profile shall be submitted to Council or an Accredited Certifier for assessment and approval. The profile shall start in the centre of the road and be along the critical edge (worst case) of the driveway. Gradients and transitions shall be in accordance with Council's Code. The profile shall be drawn to a scale of 1 to 20 and shall include all relevant levels, grades (%) and lengths.
The subsurface structure shall be designed with a waterproof retention system (ie tanking and waterproofing) with adequate provision for future fluctuation of the water table. The subsurface structure is required to be designed with consideration of uplift due to water pressure and "flotation" (buoyancy) effects. Subsoil drainage around the subsurface structure must allow free movement of groundwater around the structure, but must not be connected to the internal drainage system. The design of subsurface structure, tanking and waterproofing, and subsoil drainage shall be undertaken by a suitably experienced Chartered Professional Engineer(s). Design details and construction specifications shall be included in the documentation accompanying the Construction Certificate.
Prior to issue of the Construction Certificate the Certifying Authority shall be satisfied that the detailed plans for construction clearly identify that there is no loss of floodplain flood storage within the development. Such storage volume is below 3.25 m AHD but excludes above ground storage for the absorption system. Supporting calculations shall be provided with the detailed plans for construction.
Prior to issue of the Construction Certificate the Certifying authority shall be satisfied that the detailed plans for construction clearly identify that water from the Rainwater Tank (RWT) is to be used for all toilet flushing within the units, all landscape watering and supply of water to three internal and three external taps for non-potable uses. The layout of the reuse system must meet Sydney Water requirements and include a pre-treatment device for the RWT, a 30 micron filter to clean the reuse water and mains bypass to ensure continuous toilet supply.
The contaminated site shall be re-mediated in accordance with 'State Environmental Planning Policy No 55 Remediation of Land' (SEPP55) prior to the issue of a Construction Certificate. A Site Remedial action Plan (SRAP) prepared by a suitably qualified and experienced Contaminated Land Consultant, shall be submitted to Council being the Regulatory Authority for the management of contaminated land. It is preferable that the plan be prepared by the same consultant who assessed the site for contamination.
Within one (1) month of completion of the remedial works and prior to the issue of a Construction Certificate, a copy of the Validation Report shall be submitted to Council being the Regulatory Authority for the management of contaminated land. The Validation Report shall be prepared in accordance with the NSW Environment Protection Authority's (EPA) guidelines, Consultants Reporting on Contaminated Sites, and shall include, but not be limited to the following: 1 describe and document all works performed;
2 include results of validation testing and monitoring;
3 include validation results of any fill imported on to the site;
4 show how all agreed cleanup criteria and relevant regulations have been complied with; and
5 include clear justification as to the suitability of the site for the proposed use and the potential for off-site migration of any residual contaminants.
A detailed assessment of asbestos and lead based paint materials shall be carried out from a suitably qualified and experienced environmental consultant. The report shall be submitted to Council prior to the issue of construction certificate. It shall include the environmental management plan for safe handling and disposal of any such materials in accordance with relevant legislation.
Any part of the proposed building within 3m of the proposed detention tank or absorption trench shall be constructed on a pier and beam foundation with piers extending no less than 300mm below the bottom of the tank or trench base. This requirement shall be reflected on the Construction Certificate plans and supporting documentation.
Stormwater management requirements for the development site, including the final discharge / end connection point, must comply with DCP 78 - Stormwater Management and the agreed design recommendations listed in the Joint Statement of Evidence by the stormwater and flooding experts.
A visitor car space shall also operate as a car wash bay. A tap shall be provided. A sign shall be fixed saying 'Visitor Car Space and Car Wash Bay'. The runoff shall be directed and treated as per DCP 78. Details shall be provided with the plans accompanying the Construction Certificate.
Prior to the issue of the Construction Certificate, detailed drainage design plans for the management of stormwater are to be submitted to Council or an Accredited Certifier for assessment and approval. Design certification, in the form specified in DCP 78, and drainage design calculations are to be submitted with the plans. Council's DCP 78 sets out the minimum documentation requirements for detailed design plans.
The following conditions must be completed prior to the commencement of works.
Council's warning sign for soil and water management must be displayed on the most prominent point on the building site, visible to both the street and site workers. The sign shall be erected prior to commencement of works and shall be displayed throughout construction.
Soil and sedimentation controls are to be put in place prior to commencement of any work on site. The controls are to be maintained in effective working order during construction. The controls are to be designed and installed in accordance with the Soil and Water Management for Urban Development Guidelines produced by the Southern Sydney Regional Organisation of Council. Copies of the guidelines are available from Council.
A Soil and Water Management Plan shall be prepared in accordance with Soil and Water Management for Urban Development Guidelines produced by the Southern Sydney Region Organisation of Councils. A copy of the plan must be submitted to Council. The Plan must include details of the proposed erosion and sediment controls to be installed on the building site. A copy of the Soil and Water Management Plan must be kept on-site at all times and made available on request. Sediment control devices shall not be located beneath the driplines of trees, which are to be retained.
A sign must be erected at the front boundary of the property clearly indicating the Development Approval Number, description of work, builder's name, licence number and house number before commencement of work. If owner/builder, the Owner/Builder Permit Number must be displayed.
A sign must be erected in a prominent position on any work site on which work involved in the erection or demolition of a building is being carried out: i) stating that unauthorised entry to the work site is prohibited, and
ii) showing the name of the person in charge of the work site and a telephone number at which that person may be contacted outside working hours.
Any such sign is to be removed when the work has been completed.
iii) building work carried out inside an existing building or
iv) building work carried out on premises that are to be occupied continuously (both during and outside working hours) while the work is being carried out.
Where it is necessary to import landfill material onto the site to fill the land to levels shown on the plans forming part of the consent, a certificate, prepared by a suitably qualified and experienced Contaminated Land Consultant, shall be submitted to Council being the Regulatory Authority prior to the commencement of works, certifying that the imported fill is suitable for the land use.HealthTechnological Hazards
The site shall be secured by a 1500 mm (minimum) high temporary fence for the duration of the work. Gates shall be provided at the opening points.
When the work involved in the erection or demolition of a building: i) is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient, or
ii) building involves the enclosure of a public place, a hoarding or fence shall be erected between the work site and the public place.
When necessary, an awning is to be erected, sufficient to prevent any substance from, or in connection with, the work falling into the public place.
Any such hoarding, fence or awning is to be removed when the work has been completed.
The work site must be kept lit between sunset and sunrise if it is likely to be hazardous to persons in the public place.
Toilet facilities are to be provided, at or in the vicinity of the work site, at the rate of one toilet for every 20 persons or part of 20 persons employed at the site and the toilet facilities must be designed and installed in accordance with the provisions of clause 781 of the Environmental Planning and Assessment Regulation 1994, and be installed before any other work is commenced.
A system of fire and smoke alarms and/or detection system (as applicable) shall be provided throughout the building. Details shall be submitted for assessment and approval prior to commencement of works
The following conditions must be complied with during demolition, excavation and or construction.
A copy of the Construction Certificate and the approved plans and specifications must be kept on the site at all times and be available to Council officers upon request.
Hours of construction shall be confined to between 7 am and 6.30 pm Mondays to Fridays, inclusive, and between 8 am and 3.30 pm Saturdays with no work being carried out on Sundays and all public holidays.
For Class 2, 3 and 4 structures, the building works are to be inspected during construction, by the principal certifying authority (or other suitably qualified person on behalf of the principal certifying authority) to monitor compliance with Council's approval and the relevant standards of construction encompassing the following stages: i) after excavation for, and before the placement of, any footing, and
ii) prior to covering waterproofing in any wet areas, for a minimum of 10% of rooms with wet areas within a building, and
iii) prior to covering any stormwater drainage connections, and
iv) after the building work has been completed and prior to any occupation certificate being issued in relation to the building.
Documentary evidence of compliance with Council's approval and relevant standards of construction is to be obtained prior to proceeding to the subsequent stages of construction and copies of the documentary evidence are to be maintained by the principal certifying authority and be made available to Council officers upon request.
Upon inspection of each stage of construction, the Principal Certifying Authority (or other suitably qualified person on behalf of the Principal Certifying Authority) is also required to ensure that adequate provisions are made for the following measures (as applicable), to ensure compliance with the terms of Council's approval: 6 Sediment control measures
7 Provision of perimeter fences or hoardings for public safety and restricted access to building sites.
8 Maintenance of the public place free from unauthorised materials, waste containers or other obstructions.
Demolition operations shall not be conducted on the roadway or public footway or any other locations, which could lead to the discharge of materials into the stormwater drainage system.
All waste generated on site shall be disposed of in accordance with the submitted Waste Management Plan.
A Registered Surveyor's check survey certificate or compliance certificate shall be forwarded to the certifying authority detailing compliance with Council's approval at the following stage/s of construction: i) After excavation work for the footings, but prior to pouring of concrete, showing the area of the land, building and boundary setbacks.
ii) Prior to construction of each floor level showing the area of the land, building and boundary setbacks and verifying that the building is being constructed at the approved level.
iii) Prior to fixing of roof cladding verifying the eave, gutter setback is not less than that approved and that the building has been constructed at the approved levels.
iv) On completion of the building showing the area of the land, the position of the building and boundary setbacks and verifying that the building has been constructed at the approved levels.
v) On completion of the drainage works (comprising the drainage pipeline, pits, overland flow paths, on-site detention or retention system, and other relevant works) verifying that the drainage has been constructed to the approved levels, accompanied by a plan showing sizes and reduced levels of the elements that comprise the works.
All excavation and backfilling associated with the erection or demolition of a building must be executed safely and in accordance with appropriate professional standards and guarded and protected to prevent them from being dangerous to life or property.
When excavation associated with the erection or demolition of a building extends below the level of the base of the footings of a building or an adjoining allotment of land, you shall. i) preserve and protect the building from damage and
ii) underpin and support the building in an approved manner, if necessary and
iii) give notice of intention to excavate below the level of the base of the footings of a building on an adjoining allotment of land to the owner at least 7 days prior to excavation and furnish particulars of the excavation to the owner of the building being erected or demolished.
Note: The owner of the adjoining allotment of land is not liable for any part of the cost of work carried out for the purposes of this clause, whether carried out on the allotment of land being excavated or on the adjoining allotment of land.
In this conditions allotment of land includes a public road and any other public place.
76 Wind blown dust from stockpile and construction activities shall be minimised by one or more of the following methods:
Works shall not encroach onto or over adjoining properties, including retaining walls, fill material or other similar works. Soil shall not be lost from adjoining sites due to construction techniques employed on the subject site.
All contractors shall comply with the following during all stages of demolition and construction: 9 A Waste Container on Public Road Reserve Permit must be obtained prior to the placement of any waste container or skip bin in the road reserve (i.e. road or footpath or nature strip). Where a waste container or skip bin is placed in the road reserve without first obtaining a permit, the Council's fees and penalties will be deducted from the Footpath Reserve Restoration Deposit. Permits can be obtained from Council's Customer Service Centre.
10 A Road Opening Permit must be obtained prior to any excavation in the road reserve (i.e. road or footpath or nature strip). Where excavation is carried out on the road reserve without first obtaining a permit, the Council's fees and penalties will be deducted from the Footpath Reserve Restoration Deposit. Permits can be obtained from Council's Customer Service Centre.
11 A Hoarding Permit must be obtained prior to the erection of any hoarding (Class A or Class B) in the road reserve (i.e. road or footpath or nature strip). Where a hoarding is erected in the road reserve without first obtaining a permit, the Council's fees and penalties will be deducted from the Footpath Reserve Restoration Deposit. Permits can be obtained from Council's Customer Service Centre.
12 A Crane Permit must be obtained from Council prior to the operation of any activity involving the swinging or hoisting of goods across or over any part of a public road by means of a lift, hoist or tackle projecting over the footway. Permits can be obtained from Council's Customer Service Centre.
13 A Permit to Dewater or Pump Out a site must be obtained prior to the discharge of pumped water into the road reserve, which includes Council stormwater pits and the kerb and gutter. Permits can be obtained from Council's Customer Service Centre.
The existing dwelling/structure shall be demolished and removed from the site prior to works commencing. All demolition work shall be carried out in accordance with Council's Demolition and Erection of Buildings Code, with AS2601 - 2001: The Demolition of Structures and with the requirements of the WorkCover Authority of NSW.
Stockpiles are not permitted to be stored on Council property (including nature strip) unless prior approval has been granted. In addition stockpiles of topsoil, sand, aggregate, soil or other material shall be stored clear of any drainage line or easement, natural watercourse, kerb or road surface
Building and demolition operations such as brickcutting, washing tools or paint brushes, and mixing mortar shall not be performed on the roadway or public footway or any other locations which could lead to the discharge of materials into the stormwater drainage system.
All disturbed areas shall be stabilised against erosion within 14 days of completion, and prior to removal of sediment controls.
Stormwater from roof areas shall be linked via a temporary downpipe to an approved stormwater disposal system immediately after completion of the roof area.
Stormwater from roof areas shall be linked via a temporary downpipe to an approved stormwater disposal system immediately after completion of the roof area
Building, demolition and construction works not to cause stormwater pollution and being carried out in accordance with Section 2.8 of Council's Stormwater Pollution Control Code 1993. Pollutants such as concrete slurry, clay and soil shall not be washed from vehicles onto roadways, footways or into the stormwater system. Drains, gutters, roadways and access ways shall be maintained free of sediment. Where required, gutters and roadways shall be swept regularly to maintain them free from sediment. Note: The Applicant may be liable to prosecution under the Environmental Planning and Assessment Act 1979 for a breach of an approval condition, or under the Protection of the Environment Operations Act 1997, if its employees, agents or sub-contractors allow sediment, including soil, excavated material, building materials, or other materials to be pumped, drained or allowed to flow to the street, stormwater pipes or waterways. The Applicant shall ensure that its employees, agents or sub-contractors understand and maintain sediment control measures.
Owners/Applicants/Builders and demolishers are required to confine access to building and demolition sites to no more than two 3m driveways, and provide a footpath protection pad over Council's footpath at these points (see attached detail). Within the site, provision of a minimum of 100mm coarse crushed rock is to be provided for a minimum length of 2 metres to remove mud from the tyres of construction vehicles. An all weather drive system or a vehicle wheel wash, cattle grid, wheel shaker or other appropriate device, shall be installed prior to commencement of any site works or activities, to prevent mud and dirt leaving the site and being deposited on the street. Vehicular access is to be controlled so as to prevent tracking of sediment onto adjoining roadways, particularly during wet weather or when the site is muddy. Where any sediment is deposited on roadways it is to be removed by means other than washing and disposed of appropriately. In addition builders / demolishers are required to erect a 1.5m high fence along the whole of the street alignment other than at the two openings. Such protection work, including fences, is to be constructed, positioned and maintained in a safe condition to the satisfaction of the Principal Certifying Authority, prior to the demolition of the existing structures and commencement of building operations.
Council's warning sign for soil and water management must be displayed on the most prominent point on the building site, visible to both the street and site workers. The sign must be displayed throughout construction. A copy of the sign is available from Council.
Prior to Issue of Occupation Certificate or Commencement of Use
The following conditions must be complied with prior to issue of the Occupation Certificate or Commencement of Use.
An Occupation Certificate shall be obtained in relation to the approved works prior to any use or occupation of the building.
Tactile differentiation on floor surfaces indicating change of gradient shall be provided to those buildings where access and facilities for people with disabilities has been provided. This includes the external parts of the building, eg. access walkways and ramps. Such differentiation shall have regard to the provisions of AS1428.4.
Where Council's park/reserve is damaged as a result of building work or vehicular building traffic, this area shall be restored by Council at the applicant's expense. Repairs shall be completed prior to the issue of the Occupation Certificate.
All excess excavated material, demolition material, vegetative matter and builder's rubbish shall be removed to the Waste Disposal Depot or the Regional Tip prior to final inspection. Note: Burning on site is prohibited.
Lot B of DP 335717 and Lot C of DP 335717 are to be consolidated into one allotment. A copy of the plan of consolidation must be provided to the Principal Certifying Authority prior to release of the Strata Certificate.
All landscape works are to be carried out in accordance with the approved landscape plans. The landscaping is to be maintained to the approved standard at all times.
All works within the road reserve, which are subject to approval pursuant to Section 138 of the Roads Act 1993, shall be completed and accepted by council.
Where an electricity substation is required by Energy Australia, a final film survey plan shall be endorsed with an area having the required dimensions as agreed with Energy Australia over the location of the proposed electricity distribution substation site. The substation must be located within the boundary of the development site, or within the building, subject to compliance with the BCA. The substation site shall be dedicated to Council as public roadway, or as otherwise agreed with Energy Australia. Energy Australia's requirements shall be met prior to release of the issue of the Occupation Certificate.
Vehicles shall enter and exit the site in a forward direction at all times. A plaque with minimum dimensions 300mm x 200mm shall be permanently fixed to the inside skin of the front fence, or where there is no front fence a prominent place approved by the Principal Certifying Authority, stating the following: "Vehicle shall enter and exit the site in a forward direction at all times".
Prior to completion of the building works, a full width vehicular entry is to be constructed to service the property. Any obsolete vehicular entries are to be removed and reconstructed with kerb and gutter. This work may be done using either a Council quote or a private contractor. There are specific requirements for approval of private contractors.
The internal driveway is to be a minimum of 3.5 m and a maximum of 5.5 m at the boundary.
Eighteen (18) off-street car spaces shall be provided in accordance with the submitted plan and shall be sealed and linemarked to Council's satisfaction. The pavement of all car parking spaces, manoeuvring areas and internal driveways shall comply with Australian Standard AS3727 - Guide to Residential Pavements.
A Section 73 Compliance Certificate under the Sydney Water Act 1994 must be obtained from Sydney Water Corporation.
Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the web site www.sydneywater.com.au then refer to "Water Servicing Coordinator" under "Developing Your Land" or telephone 13 20 92 for assistance.
Following application a "Notice of Requirements" will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.
The Section 73 Certificate must be submitted to the Principal Certifying Authority prior to occupation of the development.
Prior to occupation, a registered surveyor shall certify that the driveway(s) over the footpath and within the property have been constructed in accordance with the approved driveway profile(s). The certification shall be based on a survey of the completed works. A copy of the certificate and a works-as-executed driveway profile shall be provided to Council if Council is not the Principal Certifying Authority.
Where the installation of electricity conduits is required in the footway, the builder shall install the conduits within the footway across the frontage/s of the development site, to EnergyAustralia's specifications. EnergyAustralia will supply the conduits at no charge. A Road Opening Permit must be obtained from Council prior to the installation of conduits. The builder is responsible for compaction of the trench and restoration of the footway in accordance with Council direction. A Compliance Certificate from Energy Australia shall be obtained prior to the issue of the Occupation Certificate.
Testing and evaluation of the wall insulation system is to be carried out at post construction stage by a suitably qualified acoustical engineer to show an Acoustical Star Rating of 5 has been achieved in accordance with the standards prescribed by the Association of Australian Acoustical Consultants (AAAC) in accordance with the report submitted to Council with the Development Application. A report is to be submitted to the Principal Certifying authority prior to the issue of the Occupation Certificate.
Testing and evaluation of the floor system is to be carried out at post construction stage by a suitably qualified acoustical engineer to show that an Acoustical Star Rating of 5 in accordance with the standards prescribed by the Association of Australian Acoustical Consultants (AAAC) and in accordance with the report submitted to Council with the Development Application has been achieved. A report is to be submitted to the Principal Certifying Authority prior to the issue of the Occupation Certificate.
A certificate is to be provided to Council that all wet areas have been effectively waterproofed (prior to tiling) in accordance with AS3740 and the product manufacturer's recommendations.
A Landscape Architect shall provide a report to the certifying authority (with a copy provided to Council, if Council is not the principal certifying authority) stating that the landscape works have been carried out in accordance with the approved plans and documentation.
Prior to occupation, the installer of the tank and the waterproofer shall certify that the tanking and waterproofing has been constructed in accordance with the approved design and specification. A copy shall be provided to Council if council is not the Principal Certifying Authority.
A certificate from a Registered Surveyor shall be provided to the Principal Certifying Authority (PCA) certifying that the habitable/commercial floor level is constructed a minimum of 500mm above the 1% Annual Exceedance Probability (A.E.P) Flood Level. A copy of the certificate shall be provided to Council where Council is not the Principal Certifying Authority.
Prior to occupation a Chartered Professional Engineer shall certify that the stormwater system has been constructed in accordance with the approved plans and as required by Council's DCP 78 - Stormwater Management. The certificate shall be in the form specified in DCP 78 and include an evaluation of the completed drainage works. A works-as-executed drainage plan shall be prepared by a registered surveyor based on a survey of the completed works. A copy of the certificate and works-as-executed plan(s) shall be supplied to the Principal Certifying Authority. A copy shall be provided to Council if Council is not the Principal Certifying Authority.
All absorption trenches must be inspected, and a compliance certificate under Part 4A of the EP&A Act issued prior to back filling and proceeding to subsequent stages of construction. Copies of the certificate are to be maintained by the principal certifying authority and be made available to Council officers upon request.
Prior to issue of the Occupation Certificate a registered surveyor is to certify that there has been no loss of floodplain storage below 3.25 m AHD at the rear /side of the site has been achieved.
Prior to issue of the Occupation Certificate the hydraulic/flood consultant is to certify that all the requirements of the Flood Management Plan have been satisfied.
Prior to issue of the Occupation Certificate the plumber or hydraulic consultant is to certify that all the requirements of the rainwater reuse system, including provision of all the taps and toilet flushing, have been satisfied.
The underground garage shall be flood proofed to a minimum of 500mm above the 1% Annual Exceedance Probability flood level. The levels shall be certified by a registered surveyor prior to construction of the driveway or other openings.
The development shall comply with Council's DCP 66 - Management of Flood Risk, and the Planning Considerations and Development Controls listed in the Flood Advice letter issued by Council on 1 February 2007.
Boundary fencing shall be reconstructed to allow fro overland flows by installing open form louvres to a minimum height of 0.4m above finished ground level, for the full length of the rear boundary, and for the portion of the side boundary with 50 Beach Street measuring 9.6m from the rear boundary.
The maximesh screens and removable geotextile are to be installed in the absorption system prior to connection of the downpipes to ensure the effective performance of the system during construction and the long term viability of the system.
A kerb shall be provided along the boundary to prevent surface flows from discharging onto the neighbouring property.
A positive covenant pursuant to the Conveyancing Act 1919 shall be created on the title of the lots that contain the stormwater retention and detention facility to provide for the maintenance of the retention and detention facility.
The pump system, including all associated electrical and control systems, shall be tested and inspected by a suitably qualified and experienced person. Records of testing shall be retained and provided to the certifying hydraulic engineer and/or PCA upon request.
The drainage system shall be constructed in accordance with the approved drainage plans and any amendments in red. All stormwater drainage plumbing work shall comply with the NSW Code of Practice: Plumbing and Drainage and Australian Standard AS3500
The owner of the premises shall inform Sydney Water that a Rainwater tank has been installed in accordance with applicable requirements of Sydney Water.
The overflow from the rainwater tank shall be directed to the storm water system.
All plumbing work proposed for the installation and reuse of rainwater shall comply with the NSW Code of Practice: Plumbing and Drainage and be installed in accordance with Sydney Water "Guidelines for rainwater tanks on residential properties.
A first flush device shall be installed to reduce the amount of dust, bird faeces, leaves and other matter entering the rainwater tank.
Prior to THE Issue of THE Subdivision Certificate OR THE STRATA CERTIFICATE
The following conditions must be complied with prior to the issue of the Subdivision Certificate or the Strata Certificate.
Parking spaces shall be allocated to dwellings in the development in the following manner and this shall be reflected in any subsequent strata subdivision of the development:
Small/medium dwelling (s) (<100m2 GFA) 1 space each minimum (minimum) 12 spaces Visitor Spaces (minimum) 3 spaces Total: 18
All common property spaces shall be labelled as visitor spaces on the final strata plan for the site.
Construction related activities must not take place on the roadway without Council approval.
Short-term activities (including operating plant, materials delivery) that reduce parking spaces, affect access to a particular route or prevent or restrict the passage of vehicles along the road must not occur without a valid Temporary Roadside Closure Permit.
Activities involving occupation of the parking lane for durations longer than allowed under a Temporary Roadside Closure Permit require a Construction Zone Permit and must not occur prior to the erection of Construction Zone signs by the RTA.
Permit application forms should be lodged at Council's Customer Service Centre allowing sufficient time for evaluation. An information package is available on request. 128. The following works will be required to be undertaken in the road reserve at the applicant's expense:
i) construction of a new fully constructed concrete vehicular entrance/s;
ii) removal of the existing concrete vehicular entrance/s, and/or kerb laybacks which will no longer be required;
iii) reconstruction of selected areas of the existing concrete Footpath/vehicular entrances and/or kerb and gutter.
ii) The installation of 375mm ø and 450mm ø reinforced concrete pipe;
iv) The reconstruction of an existing kerb inlet pit to a heavy duty grated inlet pit. Note: The design and documentation of the works shall be in accordance with Council's design specification. Design checking fees apply to the assessment of the plans and issue of the permit. The detailed plans of the works are required to be submitted to Council for assessment and approval pursuant to Section 138 of the Roads Act 1993 , prior to the issue of the Construction Certificate.
131 Any driveway works to be undertaken in the footpath reserve by a private contractor requires an "Application for Consideration by a Private Contractor" to be submitted to Council together with payment of the application fee. Works within the footpath reserve must not start until the application has been approved by Council.
a. You are advised to consult with your utility providers (i.e. Energy Aust, Telstra etc) in order to fully understand their requirements before commencement of any work.
b. If Council is appointed as the Principal Certifying Authority (PCA), a fee shall be paid before a Construction Certificate is issued. If payment is made after the end of the financial year, the amount shall be adjusted in accordance with Council's adopted fees and charges. The fees charged encompass all matters related to ensuring that the proposed development is carried out in accordance with the approved plans and any post inspection issues that may arise.
c. If Council is the Principal Certifying Authority for the development, a drainage inspection fee of $265.10 shall be paid prior to the issue of the Construction Certificate. If payment is made after the end of the financial year, the amount shall be adjusted in accordance with Council's adopted fees and charges. NB: This fee does not include a confined space entry into the on-site detention tank. Where a confined space entry is required, an additional fee of $388.00 is payable. A confined space entry will be required where: a) Information provided in the works-as-executed drawing and engineering certification is inconclusive as to the compliance of the system with the approved plans; and/or
b) Visual inspection from outside the tank is inconclusive as to the compliance of the system with the approved plans.
d. All asbestos fibre demolition material and asbestos dust shall be handled, stored and removed in accordance with the relevant legislation and guidelines including: 14 Occupational Health and Safety Act 2000
16 Occupational Health and Safety Amendment (Chrysotile Asbestos) Regulation 2003
17 Code of Practice for the Safe Removal of Asbestos [NOHSC: 2002 (2005)]
18 Code of Practice for the Management and Control of Asbestos in Workplaces [NOHSC: 2018 (2005)]
19 Protection of the Environment Operations (Waste) Regulation 1996
All work procedures shall be devised to minimise the release of dust and fibres. A checklist of safety precautions when working with asbestos is available in Health & Safety Guidelines prepared by the WorkCover Authority of NSW. Collection, storage and transportation is subject to the Protection of the Environment Operations (Waste) Regulation 1996.
e. The water from the rainwater tank should not be used for drinking, Sydney Water shall be advised of the installation of the rainwater tank.
f. The removal, cleaning and disposal of lead-based paint shall conform with the requirements of the NSW Environment Protection Authority's guideline - "Lead Alert - Painting Your Home"
T A Bly Commissioner of the Court ljr
DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated.
Medium Density Pty Ltd
Rockdale City Council
CITATION : Medium Density Pty Ltd v Rockdale City Council [2009] NSWLEC 1358
CASES CITED: Stromness Pty Limited v Woollahra Municipal Council [2006] NSWLEC 587 Fodor Investments v Hornsby Shire Council [2005] NSWLEC 71