[2025] VCAT 808
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-09-15
Original judgment source is linked above.
...the Builder, as part of their tender process, attended the Subject Site in association with Adams Structural and Civil Engineers and Architect Andrew Shaw, to investigate the condition of the existing dwelling that was to be retained. During this investigation, they uncovered some of the floors and walls in the front two rooms and identified major concerns to the structural viability. As a result of those investigations it was identified that the structural condition of the existing dwelling fabric to be retained was poor, and it is considered unachievable and unsafe to maintain and repair the existing structure.
All architectural features that contribute to the architectural character of the building, such as the hipped roof form, front façade detailing, comprising bracketed eaves and verandah, and brick chimneys, will be retained as part of the proposal....
The removal and replacement of the non-original tubular steel verandah posts and the concrete paving with new timber posts and a tessellated tile flooring is an appropriate response that will improve the principal façade and serve as a contemporary interpretation of a posted verandah. Where required in the instance of rot or damage, timber weatherboards, window and door joinery will be replaced to match existing. These works will not alter the presentation of the building in the streetscape.
In addition, the repainting of the building will improve the presentation of the building....
CHANGES REQUESTED IN THE CURRENT AMENDMENT APPLICATION

Figure 2 - Extract from plan TP-16S (Proposed works, west elevation, with the approved two- storey addition shown to the rear).
Partial demolition of the existing dwelling and construction of a double storey rear addition.
The photos within the Applicant's reports to date show only local damage requiring replacement, but not enough to consider the weatherboard unsalvageable. Where local repairs are required to the weatherboards, heritage-suitable materials can be recycled from the rear of the site (i.e. from the extent of the building to be removed).
It is generally acceptable to repair or replace heritage corrugated iron roof sheeting with Council-approved products. The above position - that the roof sheeting is in salvageable condition - is made on the basis that there is no evidence to the contrary.
The following is a list of arguments that the Council should clearly and concisely present at the VCAT hearing.
The purpose of this brief Consultant's Advice Notice (CAN) is not to act as an exhaustive response to the latest 80-page report; it is to reiterate the Council's main structural arguments.

Figure 3 - Subject land (marked) HO309. Image source: Planning property report.
To conserve and enhance heritage places of natural or cultural significance.
To conserve and enhance those elements which contribute to the significance of heritage places.
To ensure that development does not adversely affect the significance of heritage places.
Main development era
The main development era evident in the heritage overlay is that of the Victorian and Edwardian-eras, with a contribution from well preserved inter-war buildings and individually significant places of all eras, such as the former Wertheim Piano Factory.
Contributory elements
The contributory buildings in the Bendigo St Heritage Overlay Area include mainly (but not exclusively) small attached and detached Victorian-era and Edwardian-era one-storey houses, but with some well preserved residential examples from the immediate post First-War era, having typically:
How is it significant?
HO309 Bendigo Street Heritage Overlay Area, Richmond is aesthetically and historically significant to the City of Yarra (National Estate Register [NER] Criteria E1, A4)
Why is it significant?
The Bendigo Street Heritage Overlay Area is significant for:
Retain those elements that contribute to the importance of the heritage place.
Encourage the conservation and restoration of contributory elements of a heritage place.
To conserve and enhance Yarra's natural and cultural heritage.
To preserve the scale and pattern of streetscapes in heritage places.
To ensure the adaptation of heritage places is consistent with the principles of good conservation practices.
To promote signs that conserve and enhance the significance of a heritage place.
New development, alterations or additions
Retain, conserve and enhance individually significant and contributory buildings as identified in the incorporated document in schedule to clause 72.04 'City of Yarra Database of Heritage Significant Areas.'
Protecting and conserving the view of heritage places from the public realm (except from laneways, unless fabric visible from laneways is identified as being significant in the Statement of Significance for the place).
Demolition
Prioritise the conservation and adaptive reuse of a heritage place over demolition.
Prevent the demolition of individually significant or contributory buildings unless all of the following can be demonstrated:
Restoration and reconstruction
Retain the significance of the heritage place and the original fabric through:
Support the reconstruction of a building or works that previously existed in a heritage place if:
Relocation
Retain a heritage place or a contributory element to a heritage place in its original location unless:
Not feasible to both retain and lift the levels in the building
The primary issue with remediating the footings in this case is that there is no point in temporarily retaining the existing floor framing, wall framing, and roof / ceiling framing so that the existing footings system can be augmented, only to then completely demolish the existing floor framing and wall framing systems anyway.
...the original dwelling structure is in a severely deteriorated and compromised condition, is not structurally sound, and is beyond reasonable repair. As such, it is my opinion that the original dwelling structure is at the stage where it will require complete demolition and replacement with a new structure, and cannot practically or reasonably be retained and repaired in place.
...[he] had considered all reasonable options for the retention and repair of the building and determined that they are not feasible in this case, prior to concluding that the building cannot be retained and repaired in place, and will therefore require complete demolition and reconstruction. [31]
Furthermore, in my Second Report I considered all of the options and alternatives provided by the first Council Engineer CAN in relation to the retention and repair of the building in detail, and determined that they are not feasible.[32]
Even if it were practical to carry out underpinning and/or re-stumping of the building (which it is not), this suggested course of action would involve extensive structural and non-structural works, only for the finished product to be highly susceptible to unacceptable building damages....
Findings on reconstruction/replacement building
RESPONSE TO CLAUSE 32.09 - CHARACTER AND AMENITY

Figure 4 - Zoning of the subject land (marked). Image source: Planning property report.
To recognise areas of predominantly single and double storey residential development.
To manage and ensure that development is responsive to the identified neighbourhood character, heritage, environmental or landscape characteristics
APPENDIX A - AMENDED PERMIT DESCRIPTION AND CONDITIONS
To demolish or remove a building, including a front fence
(a) An amended external materials, finishes and colours legend addressing the reconstructed works for the front of the new dwelling (comprising the area identified as the front four rooms labelled as 'bedroom' and 'living room', plus the 'entry' and hall, shown on plans TP-04P and TP-06P).
(b) The reconstructed roof pitch must match the roof pitch of the following four front rooms in the existing building - three labelled as 'bedroom' and one labelled 'living room' (x 1) shown on plans TP-04P, TP-06P, and TP-07P.
(a) Fully dimensioned and accurately measured plans at a scale of no less than 1:50 prepared by a suitably qualified heritage practitioner/ architect, detailing:
- The existing façade, roof and return walls to a depth of approximately 5 metres, including sections of the thickness of architectural elements;
- The proposed reconstruction, to the existing façade, roof, chimney and return walls, with all dimensions and levels; and
- Photographs of all external architectural elements to be reconstructed such as doors and windows.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) Monday-Friday (excluding public holidays) before 7 am or after 6 pm;
(b) Saturdays and public holidays (other than ANZAC Day, Christmas Day and Good Friday) before 9 am or after 3 pm; or
(c) Sundays, ANZAC Day, Christmas Day and Good Friday at any time.
(a) the development is not commenced within two years of the date of this permit; or
(b) the development is not completed within four years of the date of this permit.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within six months afterwards for commencement or within twelve months afterwards for completion.
[1] The submissions and evidence of the parties, supporting exhibits given at the hearing and statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the Tribunal's practice, not all of this material will be cited or referred to in these reasons.
[2] Based on Ms Cincotta's instructions that the dwelling has been vacant since 2015.
[3] Section 57A of the Planning and Environment Act 1987 (Vic). Our understanding is based on Ms White's oral evidence at the current hearing. She authored a 2021 heritage impact statement.
[4] Section 82 of the Planning and Environment Act 1987 (Vic).
[5] Applicant's written submission at paragraph 5. The Adams report is dated 20 May 2021. It was said by Ms Cincotta to be the first structural condition report to be sought for the building.
[6] This is not an exhaustive list, but focuses on key relevant matters to this proceeding.
[7] The relevant information is shown on the plans which have ground, floor, gutter and ridge levels (among others), to which we refer again below.
[8] Using information on the plans. We note the use of RLs and AHD. A datum to AHD is cited on the plans. TP-07P shows 'TBM Nail in Path RL 12.07 AHD'.
[9] We referred to a potential change in the roof pitch at the hearing, discerned from our reading of the plan levels. By the end of the hearing, Ms Cincotta stated that roof pitch of the front portion is 28-32 degrees, and the intent has been, and is, to match the current roof profile and form.
[10] We do know, however, that the land is subject to surface water flows that, as we refer to below, have contributed to its current state.
[11] Council's written submission at paragraph 14.
[12] Heritage Impact Assessment, December 2021, by Lovell Chen, page 12.
[13] Decision plans have various revision numbers. TP-08U (09.07.24) TP-10U (09.07.24) and TP-11U (09.07.24) show proposed brick chimneys 'to match existing chimney' and proposed timber doors and windows 'to match existing'.
[14] Wattleview Pty Ltd v Yarra City Council (Corrected) [2025] VCAT 24, to which Ms Cincotta referred.
[15] Stated in Mr Juers' oral evidence.
[16] We observe with some reservation with respect to the adequacy of information in structural engineering reports.
[17] The applicant's submission (paragraph 49) says the applicant invited the Council's structural engineer (at the applicant's cost) to meet onsite with the applicant's structural engineer. This invitation was not, we were advised, accepted.
[18] This is a different position to the officer's report which states in part 'that the raising of the internal floor does not require the full demolition of the dwelling'.
[19] 'Consultant advice notice' to the Council dated 5 August 2025, page 2.
[20] There appear to be different views as to whether these works are already approved because the endorsed demolition plans do not show the verandah removed but did show a new floor level. TP-05T, which is part of the current amendment request, shows its removal. The verandah is agreed by parties to be non-original fabric.
[21] Written advice by email to the Council's planning appeals advocate dated 5 August 2025.
[22] The Council officer refers to a maximum flood height of 12.20m AHD, with finished floor levels to be 300mm above (ie. 12.550mm). The endorsed plans show 12.700mm as recorded above.
[23] There is no material from a quantity surveyor. The applicant states repairs are on the evidence of Mr Juers not practical or feasible and thus costs are not argued for this reason.
[24] 'Consultant advice notice' to Council dated 5 August 2025, page 1, document 24-S-092-CAN-003 (Rev 1).
[25] It states it was formerly Appendix 8, City of Yarra review of Heritage Overlay Areas, Graeme Bulter and Associates (2007) which is as a background document in the schedule to clause 72.08.
[26] Incorporated document under the schedule to clause 72.04 - City of Yarra, Database of Heritage Significant Areas March 2024.
[27] The Council refers to lifting the building as 'relocation' for the purpose of policy.
[28] Ford v Port Phillip CC [2017] VCAT 1348; Advant Pty Ltd v Port Phillip CC [2016] VCAT 1113 which was followed in the decision of Poulakis v Moreland CC [2022] VCAT 195.
[29] Adopting wording in Poulakis v Moreland CC [2022] VCAT 195at [100] which relied to Advant Pty Ltd v Port Phillip CC [2016] VCAT 1113, at [22] and [23] with approval.
[30] There is no arborist report relating to that tree root, which is suggested in evidence to be from the street tree in front of the subject land. This plane tree appears to be part of the 'mature plane tree avenue plantings' cited in the statement of significance. What was pointed out at our accompanied site visit by a person associated with the applicant as being a very large tree root in the south-west bedroom was, in our observation, likely pipe-work or similar. We discussed this with the representatives at the hearing, after the site visit. It appeared common ground that the tree root identified by Mr Juers' (photograph 50 in his first report 9/4/25) related to a different bedroom, the north-west room.
[31] Supplementary evidence dated 7 August 2025, at paragraph 5.11.
[32] Second report dated 2 July 2025, at 8.15 point a.
[33] Timber detail above the verandah. However, this is not what the approved plans document or identify, as noted earlier in these reasons.
[34] We note a permit relating to 71 Bendigo Street, and endorsed plans, dating from 2021.
McWolf Pty Ltd
Yarra CC [2025] VCAT 808