LANDLORD AND TENANT - Section 251 Building Act 1993; whether tenant responsible to implement essential safety measures under terms of the lease; whether landlord liable for costs of implementing essential safety measures. Evidence - whether sufficient evidence adduced; fallibility of human memory. Termination of lease - whether acts or omissions on the part of the landlord prevented the tenant from conducting its business. Pleading - whether fresh issues can be raised in closing submissions which were not raised in points of claim. Misleading and deceptive conduct - representations made by leasing agent; Australian Consumer Law (Victoria) - Part 2.2 Australian Consumer Law and Fair Trading Act . Damages - mitigation of loss and damage; relevant principles considered.
(Written closing submissions last filed on 1 October 2012)
McIntyre & Anor v Kucminska Holdings Pty Ltd (Retail Tenancies) [2012] VCAT 1766
Permitting the proposed amendment at this point in the trial, on necessary terms that would enable the plaintiff to reopen his case, provide further discovery or submit himself or any further witnesses he was to call to cross-examination would be inconsistent with the principles enunciated by the High Court in AON Risk Services Australia Ltd v Australian National University.[1]
Did the Landlord make certain representations concerning work to be carried out?
Thank you for the property inspection... this morning.
As you know, I am aware that the property has been vacant for a few months now and needs a good coat of paint on the outside, the front yard needs to be improved with some beautiful plants to be aesthetically pleasing and to better street appeal.
In view of the above, I would like to make the following offer:
$2300 per month for the next two years with an option to renew the lease on a yearly basis.
a shower in the toilet/powder room area plumbing for a washing machine in the laundry
If the landlord agrees to the above I would also gratefully request the following:
Free access to the property as from Wednesday 26 October
Rent to start from the 03 November to give us time to take care of the above improvements/additions.
I would appreciate it if you would get back to me at your earliest convenience so that I can plan accordingly.
Many thanks for your response, I am very happy with everything except I would like to request 2 things
If we could start the agreement as from 3rd November and have the rent free period until the end of this year, I would be very grateful i.e. start the lease from 03 January 2012.
If I can plant the front porch in front of the garden with daisies myself, the business name is Anna-Marguerite (after my 2 grandmothers and Marguerite is the French word for Daisy) it would mean a lot to me...
If I can meet with you tomorrow afternoon 1 PM to show you where I would like some plants that would be perfect...
Following our phone conversation yesterday, I would be grateful if you could organise for work to be done on the exterior of the house as agreed prior to me signing the lease.
A good clean of the interior and a fresh coat of paint.
The grass has been mowed, but whoever is doing this job is not doing it properly.
There is a branch on the house next that needs to be removed.
There is also a broken window pane at the back which needs to be replaced as water get in when it rains.
If you could just drop in tomorrow, I can show you what needs to be done.
I have just passed your email onto the owner and am now awaiting a reply.
I am trying to organise to get RSJ down to the property and assist with the cleanup.
I did mention to your colleague Nic on the day before I signed the lease (while you were away) that I was not prepared to sign the lease until the building had been cleaned up on the outside. He assured me that it would be done as soon as I signed the lease, so I came in good faith and signed the lease on the 3rd Nov as agreed. Now it is over a month, December is one of the busiest times in the beauty industry and I am not able to work due to not having the accreditation, thus no insurance... I would be grateful if you could deal with this as a matter of urgency, as I cannot have insurance until I get industry accreditation and I cannot receive this Industry Accreditation until the assessors are satisfied that the building meets all the standards and requirements and at the moment it is far from accomplishing that.
A GOOD CLEAN UP OF THE OUTSIDE OF THE HOUSE & FRESH COAT OF PAINT, AS AGREED PRIOR TO SIGNING THE LEASE.
DEAD BRANCH HANGING ON THE FRONT OF THE BUILDING NEEDS TO BE REMOVED, IT IS VERY CLOSE TO ELECTRICITY LINES ON THE HOUSE, SO THIS POSES A REAL DANGER.
ALSO, I STILL DO NOT HAVE A KEY TO THE BACK DOOR, WHICH IS AN OHS ISSUE.
IT IS OVER A MONTH SINCE THE BUILDING HAS BEEN LEASED, AND THE FOR LEASE BOARD IS STILL STANDING.
DUE TO THE CLEANUP OF THE BUILDING NOT DONE, I HAVE NOT BEEN ABLE TO FIX THE FRONT YARD AND PUT ANY NEW PLANTS AS I DO NOT WANT THEM DAMAGED WHILE WORK IS BEING DONE ON THE BUILDING.
... I would request that you reconsider the rent free time to extend to another month since you did not keep your side of the agreement.
Also, please do let me know about the advertising board ASAP.
I agree that has taken a long time to get these works done.
We are having serious issues getting people to do quotes because of the time of year.
Are you able to get your trades to quote and give it to me and I can get the owners approval?
As per our telephone conversation earlier, I would like to put in writing the same points I discussed with you, I am not sure if you were aware of what is really happening or if you are only chasing me for money and disregarding the fact that your side of the agreement has not been respected.
In good faith I paid my rent in advance and spent almost $40,000 to start this business, paid some minor repairs, but still cannot trade legally as I cannot get a permit from the council...
Are you aware that I do not have a backdoor key, in spite of having asked for it several times. The last time I spoke to David, he said just get a locksmith to do it. I thought that it was very unprofessional on his part. According to my lease contract I am not allowed to do so...
No one from your company has been sent to the property to do a condition report. I have asked David several times to meet me on the premises, he never returned my calls...
Attached is a list of the repairs that need urgent attention, it has been recommended not just to do a paint job to cover the rot in disrepair, but to fix the place to make it legally safe...
I will forward some pictures of your handyman's work which leaves a lot to be desired, and request that the work be carried out by someone we recommend and trust only when the work is completed as it should be and as was agreed, will I pay the rent.
(a) Replace gutter for a 3 m section, deep clean gutter and downpipes.
(b) Deep clean around facade, repair rotting columns under front veranda.
(c) Painting needs to be done around outside of building.
(d) Gas pipe has been cut off, needs to be repaired for hot water system.
(e) Hot water system not appropriate for commercial building.
(f) Fix window in back room as frame completely rotten and breaking off.
(g) Broken window frame of same window.
(h) Fix doorframe in front toilet, currently stuck due to moisture.
(i) Sanding and clear protective varnish of the front deck, replace and repair rotting wooden planks.
I have not seen the latest email, but I have seen some of the previous ones.
You may be aware that there was some misunderstanding as I actually never agreed to do any extra work prior to lease of the property.
As you are aware the house is owned by a family trust and I'm just managing that. Have to discuss extra expenses with my parents.
The house has been painted and renovated by Mr Ryan, from RSJ Construction. So all the painting inside and some of outside was done. The cleaning of the property inside and outside was done.
The front of the house was fixed, repaired and I extended the work to the windows, doors etc.
If Cameron construction does not have the keys to the back door, RSJ should still have it, as I did not collect them.
My gardener is doing regular maintenance outside. The overgrown branches of the tree were cut off and removed by RSJ construction as per Dandenong City Council guidelines during the course of house renovation last year. City Council was conducting fire danger review in February and I have not got the letter regarding this property, which means that they were happy. This can be further confirmed with Dandenong City Council...
I think that I was very kind so far, reducing rent, giving rent free time etc.
So unless the rent is paid up to date within 7 days hereof, please issue a notice of objection and make application to recover the lost rent.
Guttering, Roof and downpipes: Good Keeping up with age-looks old and rusty
Walls: Good The whole front has been painted minus the side of the house.
Signs: Sign is still waiting to be put up over the leasing board.
Windows and doors: Good Clean and front door working
Doors: One door is scraping the floor-needs attention.
The back window latch has come off the hinges needs attention.
Door to be looked at - might need re-fitting or shaving so it doesn't scrape the floor.
One door needs re-fitting or shaving down as it keeps scraping the floor
Window latch at the back next to the door is broken needs fixing/replacing.
Doors lock is playing up can you see if it needs a new one and if so quote on that too.
2. Prior to the acceptance and entering of the lease by our client, the following matters were specifically brought to your knowledge.
(a) Inspection of the Property was conducted on 13 October 2011.
(b) Our client mentioned at the inspection various things that required your attention. The agent David Johnson of Cameron Industrial Commercial acknowledged this and assured our client that the following repairs will be tended to:
(ii) Access to the back door and back of the premises with a key.
(iii) A properly working sliding door in the bathroom.
(iv) A brand-new windowpane in the back room, as the current one is broken and this provides for an insurance hazard.
(v) A new window lock for the window, so it may be locked if it required.
(vi) Removal of plants growing on the roof of which are now posing a fire hazard to the premises.
(vii) The fixing and replacement of a central support beam at the front of the premises, which is being eaten away by weather and pests.
Furthermore, human memory of what was said in a conversation is fallible for a variety of reasons, and ordinarily the degree of fallibility increases with the passage of time, particularly where disputes and litigation intervene, and the processes of memory are overlaid, often subconsciously, by perceptions of self-interest as well as conscious consideration of what should have been said or could have been said. All too often what is actually remembered is little more than an impression from which plausible details are then, again often subconsciously, constructed. All this is a matter of ordinary human experience.
Was the Tenant prevented from carrying out its business?
Breach of ss.15 and 17 of the Retail Leases Act 2003
(1) At least 7 days before entering into a retail premises lease, the landlord must give the tenant-
(a) a disclosure statement in the form prescribed by the regulations (but the layout of the statement need not be the same as the prescribed disclosure statement); and
(2) If a tenant has not been given the disclosure statement before entering into a retail premises lease, the tenant may give the landlord, no earlier than 7 days and no later than 90 days after entering into the lease, a written notice that the tenant has not been given the disclosure statement.
(3) If the tenant gives the landlord a notice in accordance with subsection (2) -
(a) the tenant may withhold payment of the rent until the day on which the landlord gives the tenant the disclosure statement; and...
(a) any information provided by the landlord in the disclosure statement is misleading, false or materially incomplete; or
(b) the tenant is not given a copy of the proposed lease in accordance with subsection (1) (b)-
the tenant may give the landlord a written notice of termination.
(6) The tenant may give a notice of termination under subsection (5) at any time before the end of 28 days after-
(a) the tenant is given the disclosure statement; or
(b) the tenant is given a copy of the proposed lease; or
Breach of s.52 of the Retail Leases Act 2003
I was informed that the key to the back door has never been provided to the tenant who is running a beauty salon/school from the premises. This leaves only one exit from the building. The key to the rear door is necessary to ensure employees and persons at the workplace have safe access and egress from the premises, especially if there was a need to evacuate the premises.
It was reported that the front porch was rotted. On inspection I did not see any rotting that would cause any issues to person's health and safety. The entry area appeared to be stable ...
Concerns were raised about a broken drainpipe at the rear of the premises. It wasn't raining at the time so I could not observe any issue ...
There was a broken window observed at the rear of the premises. I was told water comes into the building. I did not observe this as it was not raining at the time ...
I was advised that some of the doors were hard to open. At the time of my visit some of the doors had been fixed, however there was still one door that lead into one of the front rooms that was stuck and difficult to open. This may cause a risk of injury to persons who apply force to open the door.
Breach of Building Act 1993
Unable to sign off due to no proof of or items being maintained. No firefighting equipment on site.
4.1 Throughout the period of the tenancy, it is the Lessee's responsibility to ensure that:
(b) all roller doors, electric gates, electric doors, air-conditioning and heating systems including cooling towers and/or other related equipment that service the property; and
(c) triple interceptor and/or related equipment that service the property;
are appropriately serviced, maintained, repaired and replaced (when necessary);
(e) by an essential safety measure contractor ("ESM Contractor") or other professional to be nominated by the Lessor at its absolute discretion.
(f) in accordance with the Building Act 1993, the Building Regulations 2006 and the Building Code of Australia (Building Legislation) and relevant authority requirements, but does not include works of a capital structural nature.
4.2 Throughout the period of the tenancy, the Lessee must comply with Regulation 1218 of the Building Regulations 2006 and indemnifies the Lessor for any action, liability, penalty, claim or demand in respect of non-compliance of such Regulation.
If the owner of a building or land is required under this Act or the regulations to carry out any work or do any other thing and the owner does not carry out the work or do the thing, the occupier of that building or land or any registered mortgagee of the land or the land on which the building is situated, may carry out the work or do the thing.
(a) recover any expenses necessarily incurred under subsection (1) from the owner as a debt due to the occupier; or
(b) deduct those expenses from or set them off against any rent due or to become due to the owner.
The owner of a building or place of public entertainment must ensure that any essential safety measure required to be provided in relation to that building or place under the Act or these Regulations or any corresponding previous Act or regulation-
(a) is maintained in a state which enables the essential safety measure to fulfil its purpose; and...
The word "mitigation" is used in various ways as the author of Mayne and McGregor on Damages 12th ed. (1963), at par. 144, was at pains to point out. He, however, formulated in three rules the result of the authorities on "mitigation" as that word should be used in the context of the facts of this case and, in our opinion those rules accurately state the relevant law in a convenient form, viz.:-
"(1) The first and most important rule is that the plaintiff must take all reasonable steps to mitigate the loss to him consequent upon the defendant's wrong and cannot recover damages for any such loss which he could thus have avoided but has failed, through unreasonable action or inaction, to avoid. Put shortly, the plaintiff cannot recover for avoidable loss.
"(2) The second rule is the corollary of the first and is that where the plaintiff does take reasonable steps to mitigate the loss to him consequent upon the defendant's wrong he can recover from loss incurred in so doing; this is so even although the resulting damage is in the event greater than it would have been had the mitigating steps not been taken. Put shortly, the plaintiff can recover for loss incurred in reasonable attempts to avoid loss.
"(3) The third rule is that where the plaintiff does take steps to mitigate the loss to him consequent upon the defendant's wrong and these steps are successful, the defendant is entitled to the benefit accruing from the plaintiff's action and is liable only for the loss as lessened; this is so even although the plaintiff would not have been debarred under the first rule form [from] recovering the whole loss, which would have accrued in the absence of his successful mitigating steps, by reason of these steps not being ones which were required of him under the first rule. Put shortly, the plaintiff cannot recover for avoided loss."
(A) The Lessee fails to pay the rental or any other monies payable by the Lessee to the Lessor under this Lease for a period of 14 days after any of the days on which they ought to have been paid, although no formal legal demand has been made...
then the Lessor, despite any waiver of any previous breach or default by the Lessee or the failure of the Lessor to have taken advantage of any previous breach or default, may in addition to any other power, re-enter the Premises or any part and occupy or re-let the Premises.
(iii) Upon re-entry, this Lease shall absolutely determine but without prejudice to the right of action of the Lessor in respect of any previous breach of any of the Lessee's covenants provided that the right of re-entry to any breach of any covenant term or condition to which Section 146 of the Property Law Act 1958 extends shall not be exerciseable until the expiration of 14 days after the Lessor has served on the Lessee the notice required by Section 146 (1)...
[1] [2009] VSC 457 at [36].
[2] (2000) 49 NSWLR 315 at 318-319.
[3] Jones v Dunkel (1959) 101 CLR 298.
[5] Presumably the Tenant had removed her fire extinguisher prior to the inspection by the relevant author of that report.
[6] Paragraph 27 of the witness statement of Dr Anna Kucminska.
[7] The broken gaspipe was not an issue that the WorkSafe inspector thought was material.
[8] [1976] VicRp 50; [1976] VR 501 at 503.
[9] See s. 146(12) of the Property Law Act 1958.
[11] This amount excludes rent for April 2012 as that has been counted under the head of damage for rent arrears.
[12] Progressive Mailing House Pty Ltd v Tabali Pty Ltd [1985] HCA 14; (1985) 57 ALR 609 at 637-638.
[13] Being a period that the Tenant substantially occupied the Premises.
McIntyre & Anor
Kucminska Holdings Pty Ltd
(2000) 49 NSWLR 315
(1959) 101 CLR 298
(1985) 57 ALR 609