[2021] QCAT 117
General information, not legal advice.
Queensland Civil and Administrative Tribunal
2021-04-01
Original judgment source is linked above.
GENERAL ADMINISTRATIVE REVIEW - BUILDING - REVIEW OF DECISION NOT TO ISSUE A DIRECTION TO RECTIFY - whether deficiencies in upstairs flooring works the result of "building work" within the meaning of s 72 of the Queensland Building and Construction Commission Act 1991 (Qld) - whether works fall within the exemption relating to "laying of vinyl flooring" - whether a direction to remedy should be issued
Queensland Building and Construction Commission Act 1991 (Qld), s 3, s 71J, , (1)(e), , Schedule 2
Queensland Building and Construction Commission Regulation 2003 (Qld), s 5, Schedule 1AA, item 30
A visual inspection of the item was undertaken and the following observed.
Conclusion: Item 1 of your complaint form has been investigated and identified as being outside the ambit of building work. The Queensland Building and Construction Commission Regulation 2003 Section 5 provides a specific definition of building work. The item you have identified to the QBCC falls outside the legislation's definition of building work. Therefore, the QBCC cannot exercise any statutory power in relation to the items in question.
A compulsory conference has been scheduled for the 27th of March 2020.
The purpose of the return visit was to place a level over the joins of the upper floor area where vinyl was laid, to measure the height differences from the joins to the centre of the flooring sheets.
(d) For other surface finishes, full sanding shall be required if the particleboard has been exposed to the weather. The surface shall be given a first cut with 60-80 grit closed coat paper, followed by a finishing cut with 100 grit closed coat paper.
Particleboard not exposed to weather during construction shall be sanded as above if the particleboard was supplied unsanded. If sanded particleboard was used, the joints shall be sanded over with 80-100 grit closed coat paper.
(e) The depth of material removed shall not exceed the following, except where otherwise specified by the manufacturer:
Preparation
Preparation of particleboard flooring to receive floor surfacings will depend on the type of covering or finish and the effect of weather exposure on the floor.
....
Sanding
Sand the surface of the product to level sheet joins and fixing points, even out irregularities and remove any loose weathered particles. For general purpose sanding use 40-60 grit closed coat paper. Refer to sanding provisions detailed under Platform Exposure above.
Heavier sanding, with maximum 40 grit paper, may be required on floors which have been exposed to severe wetting. Avoid excessive sanding and limit to a 1mm maximum cut over general floor areas, 2mm maximum cut over supported sheet joins, in accordance with AS 1860.2.
Supply and install 124.88 m2 Polaris 5mm vinyl plank colour Coastal Blackbutt incl 15lt Smartgrip adhesive incl trims
...
No allowance has been made for:
Moving of furniture
Pull up of existing floor covering
Floor prep
Timber floor sanding done by builder not up to standard, rough joins and piant (sic) still on floor. Builder has been advised of this but insisted we install planks. He has been advised that no Warranty will be given.
Spoke to Sony regarding uneven subfloor. Insisted we keep laying, his problem. Advised no warranties on installation due uneven floor and paint on floor. Any rectification work to be paid for.
72 POWER TO REQUIRE RECTIFICATION OF BUILDING WORK AND REMEDIATION OF CONSEQUENTIAL DAMAGE
(1) This section applies if the commission is of the opinion that -
(a) building work is defective or incomplete; or
(b) consequential damage has been caused by, or as a consequence of, carrying out building work.
(2) The commission may direct the person who carried out the building work to do the following within the period stated in the direction -
(a) for building work that is defective or incomplete - rectify the building work;
(b) for consequential damage - remedy the damage.
(2A) The commission must make the direction no later than the end of the period prescribed by regulation.
(3) In deciding whether to give the direction, the commission may take into consideration all the circumstances it considers are reasonably relevant and, in particular, is not limited to a consideration of the terms of the contract for carrying out the building work (including the terms of any warranties included in the contract).
(4) The period stated in the direction must be the period prescribed by regulation unless the commission is satisfied that, if the direction is not required to be complied with within a shorter period -
(a) a substantial loss will be incurred by, or a significant hazard will be caused to the health or safety of, a person because of the defective or incomplete building work or consequential damage; or
(b) the defective or incomplete building work, or consequential damage, will cause a significant hazard to public safety or the environment generally.
(5) The commission is not required to give the direction if the commission is satisfied that, in the circumstances, it would be unfair to the person to give the direction.
Example for subsection (5) -
The commission might decide not to give a direction for the rectification of building work because an owner refuses to allow a building contractor to return to the owner's home or because an owner's failure to properly maintain a home has exacerbated the extent of defective building work carried out on the home.
(6) The commission may, before it considers whether building work is defective or incomplete, require the consumer for the building work comply with a process established by the commission to attempt to resolve the matter with the person who carried out the work.
(7) In subsection (3), a reference to a contract for carrying out building work includes a reference to a domestic building contract for managing the carrying out of building work.
(8) To remove any doubt, it is declared that the commission may act under this section in relation to consequential damage whether or not an owner or occupier has made a request under section 71J.
Work that is not building work
(1) For the Act, schedule 2, definition of building work, work stated in schedule 1AA is not building work.
...
Laying carpets, floating floors or vinyl
(1) Laying of carpets, floating floors or vinyl;
(2) In this section -
"floating floor" means a floor that covers a subfloor but is not fixed to the subfloor
(a) Confirm or amend the decision; or
(b) Set aside the decision and substitute its own decision; or
(c) Set aside the decision and return the matter for reconsideration to the decision-maker for the decision, with the directions the Tribunal considers appropriate.[5]
(ii) Whether they were caused by the installation of the particleboard;
(iii) Whether they were caused by inadequate preparation of the subfloor;
(iv) Whether, in either case, the work in (ii) or (iii) comes within the meaning of "laying vinyl flooring" and is therefore excluded from "building work".
(v) Whether it would be unfair to give a direction to the builder to rectify the relevant complaint item.
(a) AS 1860.2-2006- Particleboard flooring - Part 2: Installation (AS 1860); and
(b) AS 1884-2021 - Floor coverings - Resilient sheet and tiles - Installation practices (AS 1884).
(a) Plumb and level the floor framing (as required pursuant to AS 1684);
(b) Ensure the face of the joists the flooring is affixed to are clean and dry;
(c) The appropriate adhesive is to be applied between the joists and particular board flooring;
(d) Secondary boards are to be installed within the tongue and groove junction;
(f) The flooring is to be secured as per the manufacturer's instructions; and
[1] Statement of Reasons, SOR 4 - QBCC Resolution Services - Initial Inspection Report dated 10 June 2019.
[2] Submissions by the applicant filed 8 April 2020, Annexure 7.
[3] Queensland Civil and Administrative Tribunal Act 2009 (Qld) (QCAT Act), s 20(1).
[6] Inspections were conducted on 13 May 2019 and on 14 February 2020.
[7] See also Statement of Brain Bates filed 15 July 2020 at [33].
Mathew
Queensland Building and Construction Commission & ors [2021] QCAT 117