......Aesthetically, while there are examples of unrelated postwar development within the precinct, as a whole, it retains remarkably intact and cohesive groups of nineteenth and early twentieth century buildings that are an integral part of the special character of early Williamstown. Key elements include:
....
Avoid the demolition of heritage places unless one of the following applies:

Figure1: Determining side sight lines. Source Heritage guidelines.
Figure 2: Sight lines. Source Heritage guidelines.
Figure 3: Proposed extent of demolition to West (front) elevation.
Ms Lardner's comments here are supported in principle.
Subject to further investigation to be undertaken subsequent to removal of the existing concrete, unless there is clear evidence of an original verandah floor of a different character, it is recommended that the new verandah should be floored with hardwood boards in the traditional manner.
Although the plans refer only to the retention of the cast iron lacework to the verandah, it is appropriate that both lacework and columns be reused. It is also appropriate that the fascia detailing below the gutter be either retained or reproduced to match, and that the new gutter itself be ogee profile rather than quad profile.
The amended plans indicate the existing roof sheets are to be retained. It is not clear why the screws would need to be replaced.
Figure 4: Sight line diagram.
Figure 5: Proposed West elevation.
Whether the location, bulk, form or appearance of the proposed building will adversely affect the significance of the heritage place.
Whether the demolition, removal or external alteration will adversely affect the significance of the heritage place.
Whether the proposed works will adversely affect the significance, character or appearance of the heritage place.
Construct a building or construct or carryout works.
(a) Show retention of the front four rooms of the existing dwelling including repairs only as required.
(b) Include reference to the staging of demolition and reconstruction works on the site.
(c) Detail the necessary protection works required during the demolition works to protect those parts of the building to be retained.
Once approved by the Responsible Authority, all buildings and works must be in accordance with the demolition method statement.
(a) A full description and clear methods of dismantling of the parts of the building and the subsequent reconstruction of the building.
(b) Photographs of the existing conditions and detailed drawings of heritage elements to be removed and reinstated must be provided to enable them to be accurately reinstated.
The plans must be substantially in accordance with the amended plans substituted 10 June 2025, but modified to show to the satisfaction of the Responsible Authority:
(a) Show retention of the front four rooms including the hipped roof form of the existing dwelling including repairs only as required.
(b) Recess the ground floor laundry (north elevation) and office (south elevation) by a minimum of 300mm behind the existing building line (retained front rooms). The office may include a new ground floor window, to the satisfaction of the responsible authority.
(c) The first floor addition on the northern elevation is to be setback from the ground level by a minimum of 1 metre.
(d) Works to the existing verandah are to be amended as follows:
- The new verandah be floored with hardwood boards in the traditional manner.
- Both the lacework and columns be reused. The fascia detailing below the gutter be either retained or reproduced to match, and that the new gutter itself be ogee profile.
- The existing roof sheets and screws are to be reused.
(e) A schedule of all external materials and finishes. The schedule must show the materials, colour and finish of all external walls, roof, fascias, gutters, down pipes, window frames and paving.
(f) Details including elevations and materials of the front fence.
(a) A suitable Tree Protection Zone with barrier fence must be established around the existing street tree.
(b) The Tree Protection Zone must be enclosed using a 2-metre high temporary cyclone fence or similar, which must remain in place through all stages of the development. This fence must not enclose the footpath which must be kept clear for pedestrian access and a sign must be erected on the fence informing that the fence is a 'Tree Protection Zone'.
(c) The area within the Tree Protection Zone must not be disturbed by any means (including parking of vehicles or storage of plant & equipment, materials, soil or waste).
(d) No excavation is allowed within the Tree Protection Zone except with the consent of Council's Town Planning Department and under the supervision of a qualified Arborist.
(a) The development is not started within two years of the date of this permit.
(b) The development is not completed within four years of the date of this permit.
The Responsible Authority may extend the period in which to start the development if a request is made in writing before the permit expires or within six months afterwards.
The Responsible Authority may extend the period in which to complete the development if a request is made in writing before the permit expires or within 12 months afterwards and the development was lawfully started before the permit expired.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] This report was submitted as part of the applicant's submission. It is not evidence.
Marshall
Hobsons Bay CC [2025] VCAT 624