This particular step in the excavation process is to comprise a "HOLD" point at which time the level of the excavation can only be taken deeper by certified RELEASE by the supervising geotechnical engineer/engineering geologist.
The Method Statement for excavation is to ensure that the bracing beams are to remain in place until the lateral support they provide for the shoring can be replaced by the internal floors of the building.
5. Applicants will be required to obtain prior to the issue of a Construction Certificate, a Section 139 Certificate for Works on the Public Road Reserve issued by the Council under the provisions of Section 138 of the Roads Act 1993 for the design and construction of any works located on the road reserve.
6. Civil engineering details of the proposed excavation/landfill are to be submitted to the Accredited Certifier or Council with the Construction Certificate application. Each plan/sheet is to be signed by a qualified practising Civil Engineer who has corporate membership of the Institution of Engineers Australia (M.I.E) or who is eligible to become a corporate member and has appropriate experience and competence in the related field.
7. A dilapidation survey of adjoining properties 2075 Pittwater Rd, 2081 Pittwater Rd & 2081a Pittwater Rd, detailing the physical condition of the property, both internally and externally, including such items as walls, ceilings, roof, structural members and other similar items, shall be submitted to Council and the Certifying Authority (where Council does not issue the Construction Certificate) prior to the issue of any Construction Certificate. This survey is to be prepared by an appropriately qualified person appointed by the applicant . All costs incurred in achieving compliance with this condition shall be borne by the person entitled to act on this Consent. In the event that access for undertaking the dilapidation survey is denied by an adjoining owner, the applicant must demonstrate, in writing, to the satisfaction of Council that all reasonable steps have been taken to obtain access and advise the affected property owner of the reason for the survey and that these steps have failed. Written concurrence must be obtained from Council in such circumstances.
Note : This documentation is for record keeping purposes only, and may be used by an applicant or affected property owner to assist in any action required to resolve any dispute over damage to adjoining properties arising from the works. It is in the applicant's and adjoining owner's interest for it to be as full and detailed as possible.)
8. A certificate prepared by an appropriately qualified and practicing structural engineer, at no cost to the Council, detailing the structural adequacy of adjoining properties 2075 Pittwater Rd, 2081 Pittwater Rd & 2081a Pittwater Rd and certifying their ability to withstand the proposed excavation and any measures required to be incorporated into the work to ensure that no damage will occur to adjoining properties during the course of the works, shall be submitted to the Certifying Authority for approval with the Construction Certificate.
9. Submission of construction plans and specifications and documentation which are consistent with the approved Development Consent plans, the requirements of Building Code of Australia and satisfy all conditions shown in Part B above are to be submitted to the Accredited Certifier.
10. The Accredited Certifier or Council must be provided with a copy of plans that a Quick Check agent/Sydney Water has stamped before the issue of any Construction Certificate.
11. The applicant is to consult with Sydney Water to establish whether there are any Section 73 Compliance Certificate requirements for this proposal, under the provisions of the Sydney Water Act, 1994. A copy of any Notice of Requirements letter which may be issued by Sydney Water, is to be provided to the Accredited Certifier with the Construction Certificate application.
Application must be made through an authorised Water Servicing Coordinator. Please refer to the Building Developing and Plumbing section of the web site www.sydneywater.com.au then refer to "Water Servicing Coordinator" under "Developing Your Land" or telephone 13 20 92 for assistance.
Following application a "Notice of Requirements" will advise of water and sewer infrastructure to be built and charges to be paid. Please make early contact with the Coordinator, since building of water/sewer infrastructure can be time consuming and may impact on other services and building, driveway or landscape design.
12. Any proposed demolition works shall be carried out in accordance with the requirements of AS2601-1991 The Demolition of Structures.
Amongst others, precautions to be taken shall include compliance with the requirements of the WorkCover Authority of New South Wales, including but not limited to:
1. Protection of site workers and the general public.
2. Erection of hoardings where appropriate.
3. Asbestos handling and disposal where applicable.
4. Any disused service connections shall be capped off.
The disposal of refuse is to be to an approved waste disposal depot.
13. Design details and technical specifications relevant to recommendations in the Access Report compiled by Accessibility Solutions (NSW) Pty Ltd dated 24 June 2008 and prepared by Mark Relf and in accordance with all relevant accessibility provisions of State Environmental Planning Policy (Housing for Seniors & People with a Disability).must be submitted to the Accredited Certifier or Council with the Construction Certificate application.
14. A contribution of $34,992 is to be made to Cashier Code SOPS, pursuant to Section 94 of the Environmental Planning and Assessment Act, 1979 (as amended), for Embellishment of Open Space, Bushland and Recreation in accordance with Section 94 Contributions Plan No.2.
The Contributions Plan may be inspected at Pittwater Council, No 1 Park Street, Mona Vale. The Section 94 contribution is to be paid prior to issue of the Construction Certificate.
15. A contribution of $7,090 is to be made to Cashier Code SLEL, pursuant to Section 94 of the Environmental Planning and Assessment Act, 1979 (as amended), for Public Library Services in accordance with Section 94 Contributions Plan No.3. The Contributions Plan may be inspected at Pittwater Council, No 1 Park Street, Mona Vale. The Section 94 contribution is to be paid prior to issue of the Construction Certificate.
16. A contribution of $13,362 is to be made to Cashier Code SCSF, pursuant to Section 94 of the Environmental Planning and Assessment Act, 1979 (as amended), for Community Services Facilities in accordance with Section 94 Contributions Plan No.18. The Contributions Plan may be inspected at Pittwater Council, No 1 Park Street, Mona Vale. The Section 94 contribution is to be paid prior to issue of the Construction Certificate.
17. A contribution of $20,814 is to be made to Cashier Code SVSS, pursuant to Section 94 of the Environmental Planning and Assessment Act, 1979 (as amended), for providing improved Village Streetscapes in accordance with Section 94 Contributions Plan No.19. The Contributions Plan may be inspected at Pittwater Council, No 1 Park Street, Mona Vale. The Section 94 contribution is to be paid prior to issue of the Construction Certificate.
D. Matters to be satisfied prior to the commencement of works and maintained during the works:
Note: It is an offence to commence works prior to issue of a Construction Certificate.