(a) drainage retention to the satisfaction of the Responsible Authority being provided within Lot 2 prior to the occupancy of any dwelling built on Lot 2; and
(b) a stormwater drainage system that meets the current best practice performance objectives for stormwater quality to the satisfaction of the Responsible Authority being provided within Lot 2 prior to the occupancy of any new dwelling developed on Lot 2.
The reasonable costs of the preparation and registration of this 173 Agreement must be met by the Permit Holder and the 173 Agreement must be executed and registered prior to the issue of the Statement of Compliance.
Callum MacLeod & Catherine Baird appeared in person
(a) A restriction under the Subdivision Act 1988 that prevents buildings being located within 5 metres of the rear boundary at the rear lot;
(a) The existing dwelling drained by means of a drainage system designed to retain a post development 1 in 10 year storm event for the critical storm duration on the property. Discharge from site must be limited to an equivalent pre-development flow based on a 1 in 2 year storm event for the critical storm duration;
(b) Provision of an underground drainage system to discharge stormwater from lots 1 and 2 to the kerb and channel in Baden Powell Drive utilising the existing easement located on 105 Baden Powell Drive;
(c) Each lot being provided with a drainage property inlet to be independently and directly connected to a drain of the Responsible Authority; and
(d) A stormwater drainage system on the site designed so that stormwater runoff exiting the land meets the current best practice performance objectives for stormwater quality, as contained in the Urban Stormwater Best Practice Environmental Management Guidelines (Victorian Stormwater Committee, 1999) as follows:
80% retention of the typical annual load of suspended solids;
45% retention of the typical annual load of total phosphorous;
45% retention of the typical annual load of total nitrogen; and
70% retention of the typical annual load of gross pollutants.
In lieu of meeting the above standard on site, the stormwater quality objectives may be achieved by demonstrating to the satisfaction of the Responsible Authority, that the intended outcomes of Clause 56.07-4 of the Planning Scheme have been met.
The land is located east of Canadian Bay Road, Mt Eliza (other than in the area between Jacksons Road and Williams Road, West of Watts Parade, Mt Eliza) and no more than two dwellings are proposed for every 2600 square metres of site area.
The minimum area of any lot within a subdivision must be no less than 2500 square metres and each lot must be able to contain a rectangle a rectangle with minimum dimensions of 25 metres x 35 metres.
21.02: Profile of the Mornington Peninsula (recreation and tourism)
21.03-1: The regional role of the Mornington Peninsula
21.04: Mornington Peninsula Strategic Framework Plan
21.06: Strategic Framework and the Peninsula's Settlement Pattern
52.01- Public open space contributions and subdivision
A subdivision is exempt from a public open space requirement, in accordance with Section 18(8)(a) of the Subdivision Act 1988, if:
No discretion re percentage payable under Clause 52.01
Can the open space contribution payable under Clause 52.01 be applied to only part of the overall land being subdivided?
The responsible authority has dealt with the assessment of the cash contribution for public open space, but not in accordance with cl.52.01. It has contemplated separate assessments in relation to lots 1 and 2 whereas it should be 5% of the site value of all the land being subdivided for residential purposes. Clause 52.01 does not actually say all the land being used for that purpose, but that is clearly the meaning. The expression "all the land" appearing in previous legislative manifestations of these provisions has been omitted in cl.52.01.
Previous Tribunal decisions regarding how to apply the term "unlikely"
The test is whether it is unlikely that a proposed new lot will be further subdivided. There is no time constraint on when such further subdivision will occur. I could not say that it is unlikely that proposed lot 1 will be resubdivided in the future. I have seen plenty of recently renovated dwellings demolished (albeit in a middle ring suburban environment) to make way for two double storey townhouses
The word "unlikely" does not mean "impossible". It does not necessarily mean that further subdivision is "likely". The notion of "further" subdivision necessarily involves a consideration of future possibilities and whether such possible subdivision is "unlikely". It does not impose a limit as to the extent of time into the future that is likely to be considered.
[1] See Section 184(4)(b) of the Planning and Environment Act 1987