[2025] VCAT 855
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-09-29
Original judgment source is linked above.

Figure 2: Proposed streetscape with the site in the centre.
To manage and ensure that development is responsive to the identified neighbourhood character, heritage, environmental or landscape characteristics.
Amendment VC283 to the Victoria Planning Provisions and all planning schemes is required to update the Planning Policy Framework to implement Plan for Victoria (Department of Transport and Planning, 2025). The amendment updates and introduces policy, removes references to Plan Melbourne 2017-2050: Metropolitan Planning Strategy and makes general drafting improvements and clarifications.
DOES THE PROPOSAL APPROPRIATELY RESPOND TO THE SITE AND POLICY CONTEXTS OF THE AREA?
To maintain the detached, one to two storey scale and spacious, suburban character of the area.
To protect and enhance the area's 'leafy' feel and the garden setting of dwellings.
To maintain the fine grain rhythm of streetscapes and to enhance the landscape character of the area.
The preferred character statement and design guidelines contained in the Boroondara Neighbourhood Character Precinct Statements 2013 (or as amended and adopted by Council from time to time).
Stormwater Drainage Plan Prerequisite Requirements
(a) The use of an On-site Stormwater Detention ('OSD') system;
(b) The connection to the Council nominated Legal Point of Discharge;
(c) The outfall drainage works necessary to connect the subject site to the Council nominated Legal Point of Discharge;
(d) The integration, details and connections of all Water Sensitive Urban Design ('WSUD') features in accordance with the Sustainable Design Assessment ('SDA') and STORM report and include drainage details as a result of landscaping;
(e) A properly prepared design with computations for the internal drainage and method of disposal of stormwater from all roofed areas and sealed areas;
(f) All drainage plans must show the Trees to be retained (1, 11, 12, 13, 14 and the hedges along the southern boundary of 73 Ashburn Grove) and the Tree Protection Zone ('TPZ') radius, as detailed and calculated in accordance with the arborist report submitted with the application;
(g) All drainage plans must show proposed trees to be planted in accordance with the landscape plan submitted with the application.
(a) Any new obstructions, including fencing and/or letterboxes, must be no higher than 900mm or 50% permeable within the sight triangles in accordance with Design Standard 1 of Clause 52.06.
(b) Demonstrate that the over bonnet storage located within each garage will comply with the design standards of Clause 52.06.
(c) The overall height of Dwelling 1's porch to be less than 3.6 metres in height.
(d) Dwelling 3's first floor bedroom 3 west facing, rumpus room north facing and bedroom 4 north facing windows to be screened to 1.7 metres above the finished floor level ('FFL') or demonstration of how overlooking to the secluded private open space ('SPOS') of 77 Ashburn Grove is limited in accordance with Standard B22 of Clause 55 (Overlooking).
(e) Dwelling 2's first floor rumpus room north facing windows to be screened to 1.7 metres above the FFL or demonstration of how overlooking to the SPOS of neighbouring properties is limited in accordance with Standard B22 of Clause 55 (Overlooking).
(f) Dwelling 2's bedroom 3 south facing windows to be screened to 1.7 metres above the FFL or demonstration of how overlooking to the SPOS of neighbouring properties is limited in accordance with Standard B22 of Clause 55 (Overlooking).
(g) Dwelling 1's first floor north facing bedroom 2 window to be screened to 1.7 metres above the FFL or demonstration of how overlooking of the SPOS of dwellings within the development is limited in accordance with Standard B23 of Clause 55 (Internal Views).
(h) Dwelling 2's first floor north facing bedroom 2 window to be screened to 1.7 metres above the FFL or demonstration of how overlooking of the SPOS of dwellings within the development is limited in accordance with Standard B23 of Clause 55 (Internal Views).
(i) The northern first floor wall of Dwelling 1 to comply with the numerical requirements of Standard B17 of Clause 55.
(j) A brick finish provided to the ground floor façade of Dwelling 1, to the front, to the northern wall on boundary and to the south.
(k) The rendered finish of the first floor walls interrupted with another finish, to incorporate feature materials of either face brick or the timber finish of the garage doors.
(l) A schedule of construction materials, external finishes and colours (including swatch samples); and corresponding material codes annotated to the elevations to clearly depict which materials are located where.
(m) Initiatives contained within the SDA along with the proposed changes, including:
- Location of 2,500L rainwater tank(s) to each dwelling shown on plans.
- The location, surface area and cross-sectional diagram of the proposed raingarden.
(n) The TPZ and Structural Root Zone of Tree Nos. 1, 11, 12, 13, & 14 as identified in the Arborist Report submitted with the application prepared by Bluegum (dated 10/10/2023) and the hedges along southern boundary of 73 Ashburn Grove drawn on all site and floor plans.
(o) Notation on all site and floor plans that Tree Nos. 1, 11, 12, 13, & 14 and the hedges along southern boundary of 73 Ashburn Grove are to be retained and protected in accordance with the endorsed Tree Management Plan required by this Permit.
(p) Any built form reductions recommended in the endorsed Tree Management Plan required by this Permit; all reductions are to be absorbed within the building envelope and without the reduction of any setback.
(q) The siting of any necessary stormwater detention pit, underground service pits, and/or rainwater harvesting tank to be located outside any area set aside for tree planting and outside the TPZ of any trees to be retained/protected.
(r) Notation on all site and floor plans that all excavations within the TPZ of Tree 12 must be undertaken with hand tools or hydro-vacuum and that all excavation works must be supervised, document and certified by the Project Arborist.
(s) Permanent fencing within the TPZ of Tree 1, 11, & 12 constructed on pier foundations with any required plinths constructed above existing grade.
(t) Update the first floor plan or south elevation of Dwelling 1 as necessary, to ensure consistency between the floor plans and elevations (noting a window is shown on the elevation, adjacent to the stairwell window, which is not present on the floor plan).
(u) Notation on all site and floor plans that no strip footing is permitted within the TPZ of Tree 11.
(v) Development Stormwater Drainage Plans in accordance with Condition 1 of this permit.
(w) A Landscape Plan in accordance with Condition 4 of this permit.
(x) A Tree Management Plan in accordance with Condition 5 of this permit.
(y) The development must demonstrate full compliance with Clause 55.04-6 (Standard B22) and demonstrate the accurate depiction of habitable room windows as it relates to unit 3/73 Ashburn Grove.
(z) The SPOS of Dwelling 2 must comply with Clause 55.05-4 (Standard B28) with all built form changes to be reductions, to be absorbed within the building envelope and without reducing any setbacks.
(aa) Increase setback of the ground floor bedroom 1 and bathroom of Dwelling 3 from the northern side boundary to 1.5 metres with all built form changes to be reductions, to be absorbed within the building envelope and without reducing any other setbacks.
(bb) Delete reference to Tree 4 being retained as it has been removed.
(a) A survey (including botanical names) of all existing trees to be retained and of those to be removed. The intended status of the trees shown on the landscape plan must be consistent with that depicted on the development layout plan;
(b) All hard surfaces proposed within the TPZ of Tree Nos. 11 as identified in the Arborist Report submitted with the application Bluegum (dated 10/10/2023) must be constructed of permeable materials; be constructed above current grade; and be constructed on foundations that maintain appropriate permeability for each tree, to the satisfaction of the responsible authority;
(c) Detailed construction specifications for all permeable surfaces that include cross-section diagrams;
(d) Two (2) canopy trees (minimum 2 metres tall when planted and must achieve a minimum mature height of 10 metres and canopy spread of 5 metres) in the front setback of the property;
(e) One (1) small tree (minimum 2 metres tall when planted and must achieve a minimum mature height of 5 metres and canopy spread of 3 metres) in the secluded private open space of each dwelling;
(f) Each canopy tree must be provided a minimum of 49 sqm of soil, with the available soil area clearly shown on the landscape plan;
(g) Each small tree must be provided a minimum of 12 sqm of soil, with the available soil area clearly shown on the landscape plan;
(h) All trees must comply with Australian Standard AS2303:2015 - Tree Stock for Landscape Use;
(i) All canopy trees must be planted by an AQF Level 3 Qualified Arborist, Landscape Gardener or Horticulturist;
(j) All canopy trees must be planted more than 2 metres away from any structures, paving, decking, property boundaries, easements, existing trees or shrubs;
(k) All small trees must be planted more than 1 metre away from any structures, paving, decking, property boundaries, easements, existing trees or shrubs;
(l) All trees adequately setback from common boundaries to minimise mature canopy overhang of neighbouring spaces.
(a) A Tree Protection Plan drawn to scale that shows:
- TPZs and Structural Root Zones of all trees to be retained;
- All tree protection fenced off areas and areas where ground protection systems will be used;
- The type of foundations (illustration or notation) within each TPZ;
- Any services to be located within the TPZ and a notation to state that all services will either be located outside of the TPZ, bored under the tree protection zone, or installed using hydro excavation under the supervision of the project arborist; and
- A notation to refer to the Tree Management Plan for specific detail on what actions are required within the TPZ.
(b) Details of how the root system of any tree to be retained will be managed. This must detail any initial non-destructive trenching and pruning of any roots required to be undertaken by the project arborist; and details of how any permeable surfaces within the TPZ of retained trees will be constructed;
(c) Supervision timetable and certification of tree management activities required by the Project Arborist to the satisfaction of the responsible authority;
(d) All remedial pruning works that are required to be performed on trees during demolition and development of the site. The pruning comments must reference Australian Standards 4373:2007 Pruning of Amenity Trees and provide a detailed photographic diagram specifying what pruning will occur. Note: Only Council or Authorised Council Contractors can prune Tree No. 1. Any request for the pruning of trees on public land must be made through Council's Environmental Sustainability and Open Spaces Department.
(e) The recommendations contained in the approved Tree Management Plan must be implemented to the satisfaction of the responsible authority and any changes to the endorsed Tree Management Plan will require written authorisation from the responsible authority.
Tree Management Plan and Construction Management Plan
Contractors to be advised of trees to be retained and protected
Regulation of activities in Tree Protection Area
Documentation and Certification by Project Arborist
(a) The development is not started within two (2) years of the issued date of this permit.
(b) The development is not completed within four (4) years of the issued date of this permit.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] The submissions of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] [2012] VCAT 1675 ('Sprut').
[4] Refer to the Housing Framework Plan under Clause 02.04-3.
[5] Identified under Clause 15.01-5L - 'Policy documents' in 'Neighbourhood Character Precinct Statements (City of Boroondara, 2023)'.
Mackay
Boroondara CC [2025] VCAT 855