[2026] VCAT 80
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-02-11
Original judgment source is linked above.
To construct a building or construct or carry out works in the Significant Landscape Overlay Schedule 9
To construct a building or construct or carry out works in the Design and Development Overlay Schedule 42
To construct a building or construct or carry out works in the Floodway Overlay Schedule 1
To construct a building or construct or carry out works in the Land Subject to Inundation Overlay Schedule 2
(a) Reduce the building height so that it does not exceed 7.5 metres in height above natural ground level.
(b) The north elevation of the retained shed showing the detail of additional works above the existing wall.
(c) Additional details on the architectural elevations to show ceiling height, floor height, spandrel height and setbacks to the ground floor eaves (or prow) and first floor roof.
(d) Modifications to the eastern end of the front fence along Talbot Street to introduce a metal rod (or similar) atop the retaining wall elements.
(e) The driveway to be in either concrete or asphalt and demonstrated to be able to drain to the satisfaction of the Responsible Authority.
(f) Deletion of works within the SLO16 land and consequential modification to the sunken lounge as necessary.
(a) Deletion of landscaping within the SLO16 land and any consequential modifications as necessary.
(b) One additional Tolley Upright Olive provided to the east of the row of Tolley Upright Olives proposed along the southern boundary.
The landscaping shown on the endorsed plans must be maintained to the satisfaction of the responsible authority.
Verification of buildings set out and roof levels
(a) That the roof levels do not exceed the roof levels specified on the endorsed plans The statement must be submitted to the responsible authority at completion of the set out of the building and at the completion of the frame of the building.
The statement must be submitted to the responsible authority at completion of the set out of the building and at the completion of the frame of the building.
(a) Construct the site stormwater system including separate connection into the underground drain in Talbot Street, or other nominated point/s as approved by the responsible authority. The stormwater connection must be in accordance with City of Greater Geelong Standard Drawings.
(b) Construct vehicular crossings in accordance with the requirements and standards of the City of Greater Geelong.
(c) Remove any redundant vehicular crossings with kerb and channel and the footpath/nature strip area reinstated to match existing construction in the street.
all to the satisfaction of the responsible authority
(a) Runoff is to be treated to achieve current best practice pollutant removal targets by connection to an appropriate Water Treatment Facility, with capacity to treat at least a 3 month ARI storm event, unless approved otherwise by the responsible authority. The Water Treatment Facility must be maintained to the satisfaction of the responsible authority.
(a) All storm water runoff is to be collected on site and discharged to the legal point of discharge using a pump system or as otherwise nominated by the responsible authority. The pump system is to be designed and constructed in accordance with Australian Standard 3500 Part 3.2 Section 9.
(b) In the event of any operational difficulties with the pump system, it is the responsibility of the land owner to rectify these difficulties.
(c) Any pump system is to be replaced by gravity discharge if and when available, and if directed by the responsible authority, at the land owner's full cost.
(d) Provision is made (if appropriate) in any subdivision for Body Corporate drainage works, and access to those drainage works to be on common property or within an easement in favour of the Body Corporate.
(a) The development of the building(s) hereby approved has not commenced within two (2) years of the date of this permit.
(b) The development of the building(s) hereby approved is not completed within four (4) years of the date of this permit.
The responsible authority may extend the periods referred to if a request is made in writing before the permit expires; or
(c) Within six (6) months after the permit expires where the use or development has not yet started; or
(d) Within twelve (12) months after the permit expires, where the development allowed by the permit has lawfully commenced before the permit expiry.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] I have adopted the maximum building height nominated by Council. They say this height is derived from the parapet height of AHD 10.6. They say it equates to a height of 1.2 metres or a height of 8.681 metres.
[6] An amendment 'B' application was withdrawn.
[8] Wattleview Pty Ltd v Yarra CC [2025] VCAT 24 and Creative Property Developments Pty Ltd v Stonnington CC [2023] VCAT 691.
[10] Roberston respondent submission [33].
[11] Applicant's Addendum submission [13].
[13] Pioneer Concrete (Qld) Pty Ltd v Brisbane City Council (1980) 145 CLR 485.
[14] Rowcliff Pty Ltd v Stonnington CC [2005] VCAT 1535.
[17] Agreement AY529650E and AL782866B.
[29] The respondents say this includes swimmers, paddlers, fishers, sailors, children, families and dog walkers.
[31] PP-633-2024 was issued on 3 December 2024.
Luckock
Greater Geelong CC [2026] VCAT 80
(1980) 145 CLR 485