[2007] VCAT 1282
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2007-07-16
Original judgment source is linked above.
Anne Paul, Julia Davis, Estal Nominees Pty Ltd, Graeme Thornton, Sue Roberts, Heidelberg Golf Club, Melbourne Water Corporation, Department of Sustainability and Environment
Loudi Pty Ltd v Banyule CC [2007] VCAT 1282
I determine the questions of law referred to me as follows:
Mr Stephen Jones of counsel, instructed by Minter Ellison.
[71] The issue of protecting future residents from golf balls had been the subject of expert evidence at the earlier review. Evidence had been provided by Mr. R. Baird, consulting engineer with expertise in the design of golf courses. Mr. Baird had concluded that it would be possible for misdirected balls from the Heidelberg Golf Course's fourth tee or the related fairway to cross the boundary of lot 2A. His evidence concluded that a protective barrier should be provided, most appropriately constructed of "pole and net system" with the following characteristics:
My recommendation for the layout of a barrier ... is that it should commence on the western boundary rising to a peak height of 18m over a length of 20m and then to fall to 8m over the entire length, 100m approx, of the southern boundary.
[72] No party contested the credibility of Mr. Baird's evidence or conclusions, but limited submissions to raising questions about, or criticising, the appearance of such a barrier.
[73] Mr. Hooper submitted that the permit applicant was prepared to provide such a barrier and to also provide additional planting along the Golf Course's side of the barrier, so that its appearance would be substantially diminished. Mr. Cicero and Mr. Hooper each provided a draft of a condition requiring construction of such a barrier, that proposed by Mr. Hooper being based on the recommendation of Mr. Baird and including a specific requirement as to landscaping.
[74] We conclude that, in the circumstances of the uncontested evidence provided at the earlier hearing by Mr. Baird, such a barrier should be provided and that additional landscaping should be included. This would assist in screening the barrier in the longer-term and would add further to the vegetated character of the site's locality. Mr. Hooper's suggested condition appears appropriate.
[1] Prior to the issue of a Certificate of Compliance a suitable barrier fence shall be constructed, at the expense of the Permit Holder, along the southern boundary of the subject land to prevent the intrusion of golf balls from the adjoining golf course to the south. Such fence shall comprise, inter alia, of a pole and net system commencing on the western boundary rising to a peak height of 18 metres over a length of 20 metres and then falling to a height of 8 metres over the entire length of approximately 100 metres of the southern boundary generally in accordance with the recommendations of R M Baird & Associates contained in the supplementary report dated 27 May 2003 filed in Application for Review No. P3394/2002, to the satisfaction of the Responsible Authority.
[2] A legally binding agreement under Section 173 of the Planning and Environment Act 1987 shall be entered into between the land owner and the Responsible Authority prior to the completion of the subdivision hereby permitted which requires by way of Owners Covenants -
Prior to the issue of a Certificate of Compliance a suitable barrier fence shall be constructed, at the expense of the Permit Holder, along the southern boundary of the subject land to prevent the intrusion of golf balls from the adjoining golf course to the south. Such fence shall comprise, inter alia, of a pole and net system commencing on the western boundary rising to a peak height of 18 metres over a length of 20 metres and then falling to a height of 8 metres over the entire length of approximately 100 metres of the southern boundary generally in accordance with the recommendations of R M Baird & Associates contained in the supplementary report dated 27 May 2003 filed in Application for Review No. P3394/2002, to the satisfaction of the Responsible Authority.
Prior to the issue of a Certificate of Compliance a Landscape Plan and Maintenance Schedule shall be submitted to the Responsible Authority to its satisfaction for its approval, which shall generally be in accordance with the Landscape Plan prepared by Mr Richard Dare, Landscape architect, and which shall include, inter alia:
Provision for screen planting along the barrier fence proposed to be constructed along the southern boundary of the subject land.
"and/or such other arrangements and/or means or protecting future residents from golf balls, acceptable to the Heidelberg Golf Club, and to the satisfaction of the Responsible Authority."
[1] See Kitsone Pty Ltd v City of Doncaster and Templestowe (appeal 1992/31062); Pisanelli v Yarra CC [2004] VCAT 2033
Loudi Pty Ltd
Banyule CC [2007] VCAT 1282