[2025] VCAT 700
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-08-06
Original judgment source is linked above.
WILL THE ROOMING HOUSE CAUSE UNREASONABLE AMENITY IMPACTS?
IS THE PARKING LAYOUT AND PROVISION ACCEPTABLE?
To construct a building or construct or carry out works associated with a rooming house, caretakers house and shop
To construct a building or construct or carry out works
(a) The location and design of, electricity supply meters boxes, water meters and any other required service facilities integrated into the building design with a minimised presentation to High Street Road and the public realm.
(b) Any air conditioning/reverse cycle units are to be installed so they are screened from view from High Street Road.
(c) Linemarking of parking bays and bin locations at the rear of car parking spaces to be modified generally in accordance with Collies Layout Plan Revision A dated 13 June 2025.
(d) Finished floor levels to AHD of the parking area.
(e) The provision of full operational/technical details of the car stacker.
(f) A landscaping plan for the rooftop space showing all plantings, materials, finishes and maintenance details.
(g) Acoustic rated glazing or alternative acoustic treatment to windows and doors on the west elevation to prevent noise intrusion.
(h) Materials, colours and finishes schedule.
(i) Southern edge of the communal roof terrace screened to minimise overlooking of any private open space or habitable room window of the dwelling at 209 High Street Road or alternatively sections and plans to demonstrate no screening is required.
(j) Additional daylight access to be provided to the caretaker's house by the provision of an enlarged kitchen window, separate additional window or glazing added to the front door.
(k) An updated sustainable Design Assessment in accordance with Condition 3.
(l) An updated Waste Management Plan in accordance with Condition 5.
(m) Location of the rainwater tanks.
all to the satisfaction of the Responsible Authority.

Demonstration of how 'best practice' sustainability measures have been addressed.
Identify relevant statutory obligations, strategic or other documented sustainability targets or performance standards.
Document the means by which the appropriate target or performance is to be achieved.
Identify responsibilities and a schedule for implementation, and ongoing management, maintenance and monitoring.
Demonstrate that the design elements, technologies and operational practices that comprise the SMP can be maintained over time.
All works must be undertaken in accordance with the endorsed Sustainability Design Assessment to the satisfaction of the Responsible Authority. No alterations to the endorsed Sustainable Design Assessment may occur without written consent of the Responsible Authority and (to the extent material and necessary) any relevant flow-on changes to the design response must be also incorporated into the endorsed architectural plans.
(a) The method and location of collection of all waste from the land;
(b) Waste volume calculation and total waste generated per waste stream;
(c) Frequency of Waste collection and permitted collection times;
(d) Plans showing the location of bin storage areas, required bin storage equipment and features, number of bins and location of temporary bin storage at collection point(s);
(e) Provision of bin cleaning equipment, washing facilities and sewer disposal within the waste storage area;
(f) Type / Size of private waste vehicles;
(g) Changes to the bin areas and location in accordance with Condition 1;
(a) hours for construction activity;
(b) measures to control noise, dust and water and sediment laden runoff;
(c) prevention of silt or other pollutants from entering into the Council's underground drainage system or road network;
(d) measures relating to removal of hazardous or dangerous material from the site, where applicable;
(e) cleaning and maintaining surrounding road surfaces;
(f) public safety and site security;
(g) a plan showing the location of parking areas for construction and subcontractors' vehicles on and surrounding the site, to ensure that vehicles associated with construction activity cause minimum disruption to surrounding premises

a Traffic Management Plan including how access to the laneways will be managed;
measures to ensure that sub-contractors/tradespersons operating on the site are aware of the contents of the CMP;
any other relevant matters, including the requirements of Head, Transport for Victoria or Public Transport Victoria.
The provisions, recommendations and requirements of the endorsed Construction Management Plan must be implemented and complied with by all contractors to the satisfaction of the Responsible Authority.

Any new vehicle crossover or modification to an existing vehicle crossover must be constructed to the satisfaction of the Responsible Authority.
Once the development has started it must be continued and completed to the satisfaction of the Responsible Authority.
Walls on boundaries must be finished to the satisfaction of the responsible authority.
(a) Rooms managed and under the control of a single operator responsible for the operation and maintenance of the entire premises for the life of the use as a rooming house;
(b) The 24 hour contact details for the management of the premises displayed in a manner and location that it is visible to any person entering the premises. This information is to be updated as required immediately following any change to the nominated responsible management contact person;
(c) Appropriate maintenance of the premises, including the roof top communal areas;
(d) Appropriate management of the car park including access arrangements;
(e) Waste Disposal, including management of bins, in accordance with the waste management conditions of this permit;
When approved, the Operational Management Plan will be endorsed to form part of this permit and must be implemented to the satisfaction of the Responsible Authority.
(a) The development is not started before 3 years from the date of issue_._
(b) The development is not completed before 5 years from the date of issue_._
(c) The rooming house use is not started within two years of completion of the development.
In accordance with section 69 of the Planning and Environment Act 1987, the responsible authority may extend the periods referred to if a request is made in writing before the permit expires.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Site and Ground Floor Plan, Sheet 2 of 8, Revision C.
[3] First Floor Plan, Sheet 3 of 8, Revision C.
[4] Second Floor Plan, Sheet 4 of 8, Revision C.
[5] Third Floor Plan, Sheet 5 of 8, Revision C.
[8] Mondib Group Pty Ltd v Moonee Valley City Council [2021] VSC 722 and Wattleview Pty Ltd v Yarra City Council CC [2025] VCAT 24.
[10] Victoria's Housing Statement: The decade ahead 2024-2034.
[12] Director of Housing v Maribyrnong [2005] VCAT 2403, Bello Designs Pty Ltd v Monash CC [2021] VCAT 1211 and Dimitrovici Pty Ltd v Greater Dandenong CC [2022] VCAT 5.
[14] Supershine Panel & Paint Pty Ltd v Yarra CC [2006] VCAT 784 [9].
[15] Colliers advice dated 17 June 2025
Liveriadis Pty Ltd
Monash CC [2025] VCAT 700