[2025] VCAT 476
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-05-28
Original judgment source is linked above.
Figure 6 - Extract from planning property report, with the review site marked red.
To implement the MPS and the PPF.
To provide housing at increased densities in buildings up to and including four storey buildings.
To encourage a diversity of housing types in locations offering good access to services and transport including activity centres and town centres.
To encourage a scale of development that provides a transition between areas of more intensive use and development and other residential areas.
To ensure residential development achieves design objectives specified in a schedule to this zone.
Design and Development Overlay - Schedule 11 (DDO11)
DOES THE DEVELOPMENT ACHIEVE A SATISFACTORY LEVEL OF COMPLIANCE WITH THE BUILT FORM OUTCOMES OF DDO11?
Figure 6 - section plan.[7]
WILL THE PROPOSAL CAUSE UNREASONABLE AMENITY IMPACTS TO THE ADJOINING RESIDENTIAL PROPERTIES?
DOES THE CREATION OF THE CROSSOVER IN HOTHAM STREET RAISE TRAFFIC SAFETY CONCERNS?
Construct a building and construct and carry out works within 4 metres of a protected tree.
(a) The garage door height clearance to be annotated on plan as having a minimum 2.2m height clearance.
(b) A 2.7m height clearance area for the waste truck collection area to be shown on the Basement Level 1 floor plan.
(c) Double glazing of Unit 7 and 8 north-facing, habitable room windows situated above the driveway access ramp.
(d) The locations of Tree Protection Zones described in Condition 8, with all nominated trees clearly identified and numbered on both ground floor plan and landscape plan, and the requirements of Conditions 8 and 9 to be annotated on the development and landscape plans.
(e) A Landscape Plan in accordance with Condition 2, including the following:
- The two 'Type B' trees, as shown on the development plans in the front setback, to be capable of growing in excess of 8 metres.
- All new trees must be planted at a minimum height of 1.5 metres.
(f) A Landscape Maintenance Plan in accordance with Condition 4.
(g) A Car Park Management Plan in accordance with Condition 12.
(h) A Waste Management Plan in accordance with Condition 17 of this permit.
(i) Development plans to reflect all sustainability features that are required as part of a submitted and approved Sustainability Management Plan (SMP), together with any requirement outlined in Condition 22. The plans are to be generally in accordance with the plans submitted but indicating:
- A comment that the development must be constructed in accordance with the recommendations contained within the endorsed Sustainability Management Plan.
- Solar photovoltaic panels with capacity maximised for the available roof area as per Clause 15.01 (Encourage On-site renewable energy generation and storage technology).
- Any changes required to comply with the Sustainability Design Assessment under Condition 22.
(j) Screening of the first, second and third floor balcony (Units 16, 22 and 27) of northern elevation and opposite the private open space of the adjoining property in accordance with Standard D14 of Apartment Developments of Clause 58.
All of the above must be to the satisfaction of the Responsible Authority. Once approved these plans become the endorsed plans of this permit.
The layout of the site and the size, design and location of the buildings and works permitted must always accord with the endorsed plan and must not be altered or modified without the further written consent of the Responsible Authority.
(a) A survey of all existing vegetation, abutting street trees, natural features and vegetation.
(b) Buildings, outbuildings and trees in neighbouring lots that would affect the landscape design.
(c) Planting within and around the perimeter of the site comprising trees and shrubs capable of:
- providing a complete garden scheme,
- softening the building bulk,
- providing some upper canopy for landscape perspective.
(d) A schedule of the botanical name of all trees and shrubs proposed to be retained and those to be removed incorporating any relevant requirements of Condition 1.
(e) Type B replacement tree species to be selected from the list provided by the Responsible Authority or to the satisfaction of the Responsible Authority.
(f) The proposed design features such as paths, paving, lawn and mulch.
(g) A planting schedule of all proposed vegetation (trees, shrubs and ground covers) which includes, botanical names, common names, pot size, mature size and total quantities of each plant.
(h) Details of containerised planting including container size, growing medium, anchoring systems and infrastructure (ie: irrigation and drainage) to support ongoing plant growth and health.
Landscaping in accordance with this approved plan and schedule must be completed before the development is occupied.
Once approved these plans become the endorsed plans of this permit.
(a) Irrigation system/program for all common property landscaping and containerised plantings, including details of frequency and water delivery method.
The requirements of the Landscaping Maintenance Plan must be implemented by the building manager, owners and occupiers of the site for the life of the building, to the satisfaction of the Responsible Authority
(a) Tree Protection Zone distances:
- Tree 1 (Quercus robur 'Fastigiata') - 3.7 metre radius from the centre of the tree base
- Tree 2 (Quercus robur 'Fastigiata') - 3.0 metre radius from the centre of the tree base
- Tree 3 (Melaleuca styphelioides) - 8.4 metre radius from the centre of the tree base
- Tree 4 (Melaleuca styphelioides) - 9.5 metre radius from the centre of the tree base.
(b) Tree Protection Zone measures are to be established in accordance with Australian Standard 4970-2009 and are to include the following:
- Erection of solid chain mesh or similar type fencing at a minimum height of 1.8 metres in height held in place with concrete feet.
- Signage placed around the outer edge of perimeter the fencing identifying the area as a TPZ. The signage should be visible from within the development, with the lettering complying with AS 1319.
- Mulch across the surface of the TPZ to a depth of 100mm and undertake supplementary provide watering/irrigation within the TPZ, prior and during any works performed.
- No excavation, constructions works or activities, grade changes, surface treatments or storage of materials of any kind are permitted within the TPZ unless otherwise approved within this permit or further approved in writing by the Responsible Authority.
- All supports and bracing should be outside the TPZ and any excavation for supports or bracing should avoid damaging roots where possible.
- No trenching is allowed within the TPZ for the installation of utility services unless tree sensitive installation methods such as boring have been approved by the Responsible Authority.
- Where construction is approved within the TPZ, fencing and mulching should be placed at the outer point of the construction area.
- Where there are approved works within the TPZ, it may only be reduced to the required amount by an authorized person only during approved construction within the TPZ, and must be restored in accordance with the above requirements at all other times.
(a) A Tree Protection Plan (TPP) must be submitted to and approved and endorsed by Council prior to the commencement of all buildings and works. It must be written in accordance with the requirements set out on Page 21, under Section 5.2 Tree Protection Plan in AS4970-2009 Protection of Trees on Development Sites. It must include Tree Protection Zone Fencing Measures. It must detail how Tree 16, 17, 18 and 19 will be protected Pre-Construction, Construction Stage and Post Construction, and must be to the satisfaction of the Responsible Authority (RA).
(b) The Tree Protection Plan (TPP) must detail how any excavation works within the Tree Protection Zone of Tree 16, 17, 18 and 19 will (and any other trees shown to be retained on the plans) will be undertaken and how tree roots will be managed, so that the health and stability of trees are not adversely impacted now or into the future.
(c) The Tree Protection Plan (TPP) must detail where services will be located and how they will be installed within the Tree Protection Zone of Tree 16, 17, 18 and 19 will to be located outside of the Tree Protection Zone, bored under the tree protection zone, or installed using hydro excavation under the supervision of the project arborist.
(d) Prior to the commencement of any site works, including demolition and excavation, the Responsible Authority (RA) must be provided with evidence that a project arborist has been engaged as part of the ongoing consultant team to oversee all buildings and works, and to ensure the development does not have a detrimental impact on the ongoing health and stability of the trees to be retained. The project arborist must have a qualification in arboriculture and hold a minimum Diploma in Horticulture (Arboriculture) to be the project arborist.
(a) Consistency with Condition 1 requirements.
(b) Allocation of car spaces to individual dwellings.
(c) The collection of waste and garbage, including the separate collection of organic waste and recyclables, which must be in accordance with the Waste Management Plan required by Condition 15.
(d) Details of access controls to the basement parking area.
The provisions, recommendations and requirements of the endorsed Car Park Management Plan must be implemented and complied with to the satisfaction of the Responsible Authority.
Residential reticulated gas condition (Condition 13 only)
(a) Consistent with the Condition 1 requirements.
Once submitted to and approved by the Responsible Authority, the WMP must form part of the documents endorsed as part of this planning permit.
(a) Consistency with the requirements of Condition 1.
(b) A commitment that the development achieves an average minimum NatHERS 7 star energy efficiency rating reflecting best practice energy efficiency and thermal comfort as per NCC 2022 requirements.
(c) Council strongly encourages an all-electric design that is net-zero ready in line with the Green Building Council's 'practical guide to electrification: for new buildings'
(d) Solar photovoltaic panels with capacity maximised for the available roof area as per Clause 15.01 (Encourage On-site renewable energy generation and storage technology). In addition, comment and recommendations on options and feasibility of energy storage is to be provided.
(e) Hot water systems noted as energy efficient electric solar / heat pump hot water heating system. Electric systems are net zero emissions ready in line with Whitehorse planning Clause 22.10 (To reduce total operating greenhouse gas emissions).
(f) Address Electric Vehicle (EV) charging:
- Capacity and Load Management: Dedicated EV distribution board(s) in each carpark storey that is capable of: Supplying a minimum 7 kW (32 Amp single phase) dedicated circuit to all residential car parking spaces.
- A strategy for load sharing and managing the maximum demand load of the development so that it does not exceed the site capacity. Alternatively, confirm the site electrical capacity will cater for the EV charging load in maximum demand calculations as per AS/NZS 3000.
- Dedicated space for cable trays to support the future installation of EV cabling from the distribution board to the edge of each applicable car parking space.
- Additional EV infrastructure, as required, which may include power use metering and communication systems, increased electrical capacity, and conduit installations.
Prior to the occupation of the development, the development must be constructed in accordance with the endorsed Sustainability Management Plan (SMP) report to the satisfaction of the Responsible Authority.
When approved, the CMP will be endorsed and will form part of this permit and must be complied with, to the satisfaction of the Responsible Authority, to the extent that this is in the control of the owner of the land. The owner of the land is to be responsible for all costs associated with the works to be undertaken in accordance with the requirements of the approved CMP.
(a) the development is not commenced within two (2) years from the date of issue of this permit;
(b) the development is not completed within four (4) years from the date of this permit.
The Responsible Authority may extend the periods referred to if a request is made in writing pursuant to the provisions of Section 69 of the Planning and Environment Act 1987.
[1] The submissions of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Review site shown with orange arrow, Nearmap March 2025.
Leung
Whitehorse CC [2025] VCAT 476