Despite any other provision of this planning scheme, in determining applications to which this clause applies, the responsible authority is exempt from and is not required to consider:
If there is any inconsistency between the requirements of this clause and another provision of this planning scheme, this clause prevails.
An application to which this clause applies is exempt from the requirements of:
A permit is not required to construct a building or carry out works provided all the following requirements are met:
For the purpose of this clause a substantial tree is defined as vegetation that has a trunk circumference greater than 0.5 metre at one metre above ground level.
IS THE DEVELOPMENT AN ACCEPTABLE RESPONSE TO THE SLO3 AND THE LANDSCAPE CHARACTER?
Statement of nature and key elements of landscape
The Shire of Nillumbik Neighbourhood Character Study identifies the importance of vegetation and the relationship between the buildings and the landscape to the character of an area. The areas covered by this overlay have a bush garden character that is dominated by mature native and indigenous trees and planted bush style gardens. Dwellings in these areas are set among the trees and are sited so as to minimise disruption to the landform and vegetation. Buildings maintain the patterns of orientations and setbacks of adjoining properties and the streetscape. There is usually little or no delineation of front property boundaries.
The key elements of this landscape are:
Landscape character objectives to be achieved
To retain the dominance of vegetation cover in keeping with the bush garden character.
To ensure that development is compatible with the scale, setbacks and character of existing development.
To ensure that development is sensitive to the natural characteristics of the land including slope, terrain, services and any existing vegetation.
To ensure that development does not penetrate the tree canopy.
To ensure that the health of existing trees is not jeopardised by new development.
Encourage medium density housing development that is designed and sited to appear of a single dwelling when viewed from the street.
Avoid continuous building lines and blank walls.
Encourage building lines and walls that are articulated, contain visual features or are otherwise varied.
To reduce the impact of increased stormwater run-off on the drainage system and downstream waterways.
To facilitate on-site stormwater infiltration.
To encourage stormwater management that maximises the retention and reuse of stormwater.
To contribute to urban cooling
The site area covered by the pervious surfaces is at least 20 percent of the site.
The development includes a stormwater management system designed to:
Note:
A certificate generated from a stormwater assessment tool including Stormwater Treatment Objective - Relative Measurement (STORM), Model for Urban Stormwater Improvement Conceptualisation (MUSIC) or an equivalent product accepted by the responsible authority may be used to demonstrate the performance objectives for stormwater quality are met.
To encourage stormwater management that maximises the retention and reuse of stormwater.
To encourage development that reduces the impact of stormwater on the drainage system and filters sediment and waste from stormwater prior to discharge from the site.
To encourage stormwater management that contributes to cooling, local habitat improvements and provision of attractive and enjoyable spaces.
To ensure that industrial and commercial chemical pollutants and other toxicants do not enter the stormwater system.
Standard W2
The stormwater management system should be designed to:
To protect drainage infrastructure and receiving waters from sedimentation and contamination.
To protect the site and surrounding area from environmental degradation prior to and during construction of subdivision works.
Standard W3
An application should describe how the site will be managed prior to and during the construction period and may set out requirements for managing:
The site is proposing the construction of two new dwellings and associated impervious surfaces. This will increase the stormwater runoff generated from the site than what is currently experienced.
The increase in the proposed stormwater flows expected in storms up to and including the 20% AEP will not impact the existing drainage infrastructure as it has suitable capacity to convey the increases expected.
The increased stormwater flows expected in storm events up to the 1% AEP will not adversely affect surrounding properties as the flow increase is negligible and expected to be captured and conveyed in the existing subsurface drainage system.
The site is adopted stormwater quality devices to facilitate reuse of the stormwater, provide treatment to the stormwater runoff, encourage filtration and infiltration of stormwater runoff and assist to promote urban cooling.
The proposed stormwater quality management for the site meets the current best practice pollutant reduction targets and achieves the stormwater runoff requirements of the General Environmental Duty for the site.
The site complies with all stormwater management requirements outlined in the relevant Victorian Planning Provisions. [sic]
Carry out works that are less than 5.0 metres from the base of a substantial tree.
(a) section drawings of the driveway. The drawings must be in accordance with the section drawings shown on the endorsed plans which form part of Planning Permit 329/2020/14P;
(b) the location of the on-site detention device/system (refer to Condition No. 13)
(c) removal of the third car space and associated hardstand to the north of Garage 1 and its replacement with landscaping;
(d) no part of Dwelling 3 (including eaves) encroaching north of the building envelope;
(e) a notation stating that the proposed 1.9 metre high paling fence on the northern boundary be constructed prior to development commencing
(f) all plant species shown to be consistent with the Landscape Plan (refer to Condition No. 2);
(g) a comprehensive schedule of construction materials, colours and finishes, which must be in muted 'earthy' tones and of low-reflectivity. This must include details of the type and quality of materials, showing their application, appearance and durability.
(a) measures to control erosion and sediment and sediment laden water runoff including the design details of structures;
(b) where any demolition and construction wastes, equipment, machinery and/or earth is to be stored/stockpiled during construction. Demolition and construction waste bins must not be dropped off, stored, or picked up on or near Bridge Street, Plumtree Close or the pedestrian footpath to the rear of the subject site. Demolition and construction waste bins are to be dropped off and picked up via John Street;
(c) where access to the site from John Street for construction vehicle traffic (including where workers personal vehicles will be parked) will occur. Bridge Street and Plumtree Close must not be used for the parking of construction vehicles or construction workers personal vehicles;
(d) Nominal Root Zones (Tree Protection Zones);
(e) the location and details of a sign to be erected at the entrance of the site advising contractors that they are entering a 'sensitive site' with prescribed tree protection zones and fences;
(f) the location of trenching works, boring, and pits associated with the provision of services;
(g) the location of any temporary buildings or yards; and
(h) measures designed to ensure the orderly management of the construction site, including complaint procedures and contact details in the event of a received complaint relating directly to construction works.
The development must be undertaken in accordance with the endorsed Construction Management Plan to the satisfaction of the responsible authority.
The tree protection fencing is to be provided to the extent of the Nominal Root Zone (Tree Protection Zone), calculated in accordance with Australian Standard AS 4970.2025), Protection of trees on development sites.
If works are shown on any endorsed plan of this permit within the confines of the calculated Nominal Root Zone (Tree Protection Zone), then the tree protection fencing must be taken in to only the minimum amount necessary to allow the works to be completed.
All tree protection fencing required by this permit must be erected in accordance with the approved Nominal Root Zone (Tree Protection Zone).
The tree protection fencing must be erected to form a visual and physical barrier and must be a minimum height of 1.5 metres and of chain mesh or similar fence with 1.8 metre support posts (e.g. treated pine or similar) every 3-4 metres, including a top line of high visibility plastic hazard tape erected around the perimeter of the fence.
Fixed signs are to be provided on all visible sides of the tree protection fencing clearly stating "Tree Protection Zone - No Entry", to the satisfaction of the responsible authority.
The area within the Nominal Root Zone (Tree Protection Zone) and tree protection fencing must be irrigated during the summer months with 1.0 litre of clean water for every 1.0 cm of trunk girth measured at the soil/trunk interface on a weekly basis.
All services (including water, electricity, gas and telephone) must be installed underground, and located outside of any Nominal Root Zone (Tree Protection Zone), wherever practically possible. If underground services are to be routed within an established Nominal Root Zone (Tree Protection Zone), they must be installed by directional boring with the top of the bore to be a minimum depth of 600mm below the existing grade, to the satisfaction of the responsible authority.
Bore pits must be located outside of the Nominal Root Zone (Tree Protection Zone) or manually excavated without damage to roots, to the satisfaction of the responsible authority.
(f) Access to Nominal Root Zone (Tree Protection Zone)
Should temporary access be necessary within the Nominal Root Zone (Tree Protection Zone) during the period of construction, the responsible authority must be informed prior to relocating the fence (as it may be necessary to undertake additional root protection measures such as bridging over with timber).
(a) materials or equipment stored within the zone;
(b) servicing and refuelling of equipment and vehicles;
(c) storage of fuel, oil dumps or chemicals;
(d) attachment of any device to any tree (including temporary service wires, nails, screws or any other fixing device);
(e) open cut trenching or excavation works (whether or not for laying of services);
(f) changes to the soil grade level;
(g) temporary buildings and works; and
(h) unauthorised entry by any person, vehicle or machinery.
(a) with respect to bin placement in Plumtree Close location, the bins must be located out of the "T" of the court and on the straight section leading out of Bridge Street for collection; and
(b) clear identification on the Plumtree Close bins with address stickers indicating the number and street name where the bins are from.
The storage and collection of waste and recyclables must be undertaken in accordance with the endorsed Waste Management Plan to the satisfaction of the responsible authority.
The on-site detention device must be designed by a qualified engineer and checked and approved by a registered professional engineer, with the name and registration number to be provided on each plan.
The engineer designing the on-site detention device must obtain tc and tso figures from the responsible authority. The detention must be calculated using the Swinburne Method of On Site Detention Calculation. The permissible site discharge must be restricted to a pre development flow rate for a 20% Average Exceedance Probability (AEP) and detained for a 10% (AEP) event.
Except with the prior written consent of the responsible authority, before the development starts, drainage plans must be submitted to, and be approved by, the responsible authority. When approved, the drainage plans will be endorsed and will then form part of this permit.
(a) The development is not started within three (3) years of the issued date of this permit.
(b) The development is not completed within five (5) years of the issued date of this permit.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition
[1] A planning permit has been issued for the construction of a second dwelling on the adjoining property to the west, at 83 John Street.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] Provisions regarding tree canopy, entry and room depth.
[4] Nillumbik Neighbourhood Residential Areas.
[6] This is with the exception of standard B2-7, which I have made findings on.
[7] That is, the permission to construct two or more dwellings on a lot.
[8] Cupressus macrocarpa - Monterey cypress
[9] Melaleuca stypheliodes - Paper bark
[10] Eucalyptus viminallis - Manna gum
[11] Planning Permit 329/2020/14P. The permit allows 'Subdivision of land into two lots and creation of an easement and Works within 5m of significant trees (Tree #1 and #2) in a Significant Landscape Overlay, in accordance with the endorsed plans.in accordance with the endorsed plans. [sic]
[15] Neighbourhood character - Nillumbik.
[18] Clause 52.06-9, design standard 1 - accessways, states that a passing area is required if the accessway serves ten or more car spaces and is either more than 50 metres long or connects to a road in a Transport Zone 2 or Transport Zone 3. These circumstances do not apply to the application.
[19] Formerly referred to as 'Tree Protection Zones'.