austlii:qld/QBCCMCmr/2025/322
General information, not legal advice.
QBCCMCmr
2025-09-23
Original judgment source is linked above.
Landsborough 65 [2025] QBCCMCmr 322
Body Corporate for Landsborough 65 (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(b) and 229(3)(a)
Body Corporate and Community Management (Accommodation Module) Regulation 2020 (Accommodation Module)
INTERIM ORDER - whether interim orders are warranted.
That the adjudicator order the Body Corporate, at its expense, to follow through on the insurer's builder recommendation and investigate water ingress on the level 3 balcony, and carry out any necessary make-safe works (Attachments 15, pp.3-5). Although flood testing and temporary/emergency makesafe works are currently being performed by Ian Freeme, the Body Corporate-appointed builder, it remains unclear whether the Body Corporate will implement the insurer's full recommendations.
If the Body Corporate Committee fails to act, that the lot owner be authorised to engage a suitably qualified contractor and be reimbursed by the Body Corporate for the reasonable costs incurred.
That the adjudicator order the Body Corporate, at its expense, to engage a suitably qualified and licensed contractor to carry out mould remediation and cleaning works in the master suite, living room, and bedroom 2 within 7 days of the order, and to repeat such works if mould recurs before the application for final orders is decided.
If the Body Corporate Committee fails to act, that the lot owner be authorised to engage a suitably qualified contractor and be reimbursed by the Body Corporate for the reasonable costs incurred.
That the adjudicator order the Body Corporate, at its expense, to engage an independent, suitably qualified and licensed structural engineer to carry out an assessment of the master suite and immediate surrounding structure within 14 days of the order. The assessment should identify:
This assessment is limited to evaluating structural integrity, existing water ingress damage, and associated risks. It does not duplicate or replace the ongoing work of the flood-test builder, who is currently engaged to locate and seal water entry points.
If the Body Corporate fails to engage the engineer within 14 days, the lot owner be authorised to engage an independent structural engineer at the Body Corporate's expense, with reasonable costs reimbursed.
That the adjudicator order the Body Corporate, at its expense, to take temporary remedial action to address mould, rot, and damage to the carpet, underlying foam, and wooden underframe in the master suite and surrounding areas, including:
This interim order is temporary and sought to prevent immediate harm to the lot owner and pets until final orders are made requiring the Body Corporate to fully repair or replace the carpet, underframe, and any related damage caused by water ingress and mould.
If immediate action is required to prevent further damage or loss of insurance rights (policy expiring 21/11/25; Attachment 21, p.2), the lot owner may take temporary measures using private contents insurance. The Body Corporate is to reimburse only reasonable costs incurred to prevent immediate harm, pending final orders for full remediation.
That the adjudicator order the Body Corporate, at its expense, to:
That the adjudicator order the Body Corporate, at its expense, to engage a qualified and licensed expert to carry out the previously determined inspection and repair of the suite bedroom and bedroom 2 sliding doors, panels, and windows, as per (Attachments 3, p.10; 20, p.9).
That the adjudicator order the Body Corporate to repair the damage to the water-damaged carpet, underframe, and floor substrate caused by the Body Corporate's repeated failure to address water ingress, mould, and ongoing leaks from the master suite and surrounding areas from 17/10/24 to the present.
That the adjudicator order the Body Corporate, at its expense, to reimburse the lot owner for:
That the adjudicator order the Body Corporate to provide access to all documents, records, correspondence, and information relating to the master suite leakage and mould from 04/10/24 to present, as requested in the third and fourth formal letters (Attachments 14, pp.32-33; 18, pp.17-18), including all reports, quotes, and communications with insurers, brokers, builders, and consultants.
Where the Body Corporate asserts that any information or documents are unavailable from DCS Management, brokers, or any other party, the Body Corporate must, within 10 business days:
That failure to comply be treated as evidence of unreasonable conduct, lack of diligence, and bad faith, permitting the adjudicator to draw an adverse inference against the Body Corporate and make any costs or other orders the adjudicator considers appropriate.
That the adjudicator direct the Body Corporate to amend the minutes of meetings from February to August to accurately record all matters relating to the master suite leakage, including correspondence, determinations, and relevant discussions.
That the Body Corporate issue a circular to all lot owners clarifying the leakage issue from 04/10/24 to present, including the insurance claim process.
That the amended minutes and circular be completed within 30 days, or such other period as the adjudicator considers reasonable, and reflect a full and accurate record.
That the adjudicator declare that the Body Corporate, through its committee, failed to act diligently and in good faith, mismanaged repairs, insurance claims, and lot owner requests, and breached its statutory obligations under s.101A(1), s.94(1)(c), and related provisions, and to order any penalties, interest, or other remedies the adjudicator considers appropriate.
Interim order 4 - Temporary remediation of carpet and underframe
[3] See sections 227, 228, 276 and schedule 5 of the Act.
[4] This section provides for the protection of committee members from liability.
[5] This is the code of conduct for committee voting members, pursuant to section 101B of the Act.
[6] Noting the limitation on parties to a dispute in section 227(1) of the Act.
[10] Sections 48C and 49C(4) of the Land Title Act 1994
[11] Registrar of Titles Directions for the Preparation of Plans, Department of Natural Resources and Mines, Manufacturing and Regional and Rural Development, 1998-2025, paragraphs 9.6.3 and 4
[12] For example, Somerset Gardens [2023] QBCCMCmr 332, para 4
[15] Bingham & Anor v 7-Eleven Stores P/L [2003] QCA 402 at 106-8 citing R P Meagher, J D Heydon and M J Leeming, Meagher, Gummow and Lehane's Equity, Doctrines and Remedies (Butterworths LexisNexis, 4th ed, 2002) at 21-395
[16] Section 201 of the Accommodation Module
[17] Section 170 of the Accommodation Module
[18] Section 170(2)(a) of the Accommodation Module
[19] Section 170(2)(b) of the Accommodation Module
[20] It is not necessary for present purposes to detail all the statutory exceptions.
[21] Section 170(3) of the Accommodation Module
[22] Section 177 of the Accommodation Module
[24] Section 188 of the Accommodation Module
[25] Section 94(1) of the Act
[26] Section 94(2) of the Act
[27] Section 100(5) of the Act
[28] I note section 193 of the Accommodation Module regarding insurance excesses.
[29] It is not clear the applicant wants the body corporate to pursue the quotes obtained in November 2024.
[30] Section 162 of the Accommodation Module
[31] Noting section 238(1)(b) of the Act
[32] See the definition of 'records' in the schedule 6 of the Act and section 231 of the Standard Module
[33] The prescribed fees are set out in section 222 of the Accommodation Module
[34] Body Corporate for the Rocks Resort CTS 9435 v East [2014] QCATA 308, particularly at 10 and 13, and Ainsworth v Body Corporate for Viridian Noosa Residences CTS 34034 [2014] QCATA 176 at 54
[35] For example, pursuant to section 163 of the Act
[36] Section 63 of the Accommodation Module
[37] Section 107 of the Accommodation Module
[38] Truth About Motorways v Macquarie [2000] HCA 11, Ainsworth v Criminal Justice Commission [1992] HCA 10