[2015] ACAT 92
ACT Civil and Administrative Tribunal
2015-12-23
Stefaniak AM
Original judgment source is linked above.
...Clause 35 enables the registrar to make an order under Clause 37. The registrar must be satisfied that the person is contravening, or has contravened, this Act or an operational Act and that it is appropriate to make a rectification order. However the clause prevents an order from being given where the registrar is satisfied that the relevant contravention happened, or was part of something that ended more than 10 years previously and provides an example. (emphasis added)
Interpretation of the BCA and how it is 'picked up' by the BA
There is no doubt that Section 40A [of the Building Act 1972] imposes an obligation to carry out building work in accordance with the requirements of the BCA. However, the section is only contravened if the person does not have a reasonable excuse.
57.But none of the allegations considered by the Tribunal has anything to do with particular building materials and their method of use. They relate to matters such as water penetration and the like, which are not related to building materials but to general matters of building construction.
Accordingly, the applicant submits that when the Tribunal comes to consider allegations involving the provisions of the BCA, it can only do so in the context of the requirements of Section 40A not Section 37.
41A Carrying out building work in breach of s 37
(1) Building work (other than maintenance or cleaning of a specialised system) shall not be begun or carried out except in compliance with section 37.
_(5) It is a defence to a prosecution against a person other than the owner of a parcel of land if the person satisfies the court that - _
(a) he or she had carried out the building work under a contract entered into by him or her with another person or at the request and on the instructions of another person; and
_(b) that he or she believed on reasonable grounds that - _
(i) a building approval had been issued in relation to the building work; and
(ii) the work has been carried out in compliance with section 37.
A masonry member or structure shall be designed to allow movements to be controlled or isolated so that damage to the masonry, the building, and its components is avoided....
The recorded defects comprise inadequate construction of the building structure. Inadequate control of building movement has resulted in uncontrolled cracking of façade elements including masonry, EPS panels, fibre cement sheeting, render and applied coatings.
Cracks have been recorded as defects in the Defects Schedule only where they are determined by the author to be significant cracks i.e. in excess of 1mm wide. The façade render elements also exhibited numerous minor cracks i.e. less than 1mm in width, however these have not been incorporated in this report.
The level of cracking and structural movement is to be expected in a building of this age and type, especially considering the diversity of the materials used in and around the structure.
Cracking was primarily noticed to the external façade in the following areas: To the eastern façade at the interface between concrete slabs and rendered masonry walls over/under western entry. Cracking at the parapet level through an area of fascia.
These cracks were noted to be façade cracks only, and minor in size (up to 1mm). The extent of this cracking is not considered extensive. It is my opinion that the cracking is due to building movement and/or settlement, and should be repaired with a flexible sealant, and monitored for any further movement or cracking. There is no suggestion that the building structure is inadequate due to several minor cracks noted in the facade.
I am in agreement with the stated allegation, however, to the extent that cracking at joints where the substrate structure is able to undergo differential movement such as at control joints, where control joints should have been provided but have not been provided, and at junction of dissimilar materials are building defects and breaches of the BCA Performance Requirements BP1.1(a)(iii) regarding local damage only.
2. The penetration of water into the carpark roof affecting the steel support beams is a breach of the following BCA requirement:
A drainage system for the disposal of surface water must:
A roof and external wall (including openings around windows and doors) must prevent the penetration of water that would cause -
(a) Unhealthy or dangerous conditions, or loss of amenity for occupants; and
(b) Undue dampness or deterioration of building elements.
A review of construction plans revealed that a waterproofing membrane to basement perimeter block walls and ground level terrace decks was a requirement of the works.
....... Diagnostech consider the issue to be non-compliant with the plans and specifications for the building.
Corrosion on the blue channel beam in the basement had been caused by ingress of water from above as shown by run marks in [photo] 3 and edge ponding in [photo] 4. Corrosion has not been caused by atmospheric moisture.
A lot of cracking is anticipated in slabs, and it doesn't necessarily represent a problem at all. It does represent a problem if it's an external slab and you're relying on Xypex to keep it waterproof.[10]
3) Penetration of water into ceilings and walls of habitable units
4) Penetration of water from balconies into habitable units
The penetration of water from the balconies into habitable units is in breach of the following BCA requirement:
A drainage system for the disposal of surface water must:
(a) convey surface water to an appropriate outfall; and
(b) avoid the entry of water into a building; and
....the Applicant accepts that the Tribunal has enough evidence from these sources to find that the waterproofing was not done on these balconies in accordance with the BCA requirement FP1.4....
Specifically, the Applicant admits that the waterproof membrane was not properly laid
(a) to the hobs up and under the balcony doors, and
(b) turned up adequately above the level of the skirting tile; and
(c) at the junction between the blueboard and the concrete floor below the mansard roofs.
My experience has shown that you get a pattern of a series of cracking in Ultrafloor all the time....... So I think that ... it's a poor choice of trying to waterproof an Ultrafloor slab.[13]
East face, under Unit 26, water penetration through ceiling
Rectify Balcony off bed 2 Unit 26. Repair internal damage
South East corner under Unit 26, water penetration through kitchen, living room ceiling
Rectify E & S Balconies Unit 26. Repair internal damage
West face, under Unit 28, water penetration bedroom ceiling
Rectify Balconies off Unit 28. Repair internal damage
West face under Unit 28, water penetration through living room ceiling and wall
South West corner, water penetration through bedroom 1 wall
Rectify Balconies off Unit 29. Repair internal damage
North West Corner, water penetration through bedroom 2 wardrobe
Rectify Balconies off Unit 30. Repair internal damage
West face, water penetration through living room ceiling
Rectify Balconies off Unit 30. Repair internal damage
North East corner, water penetration at floor level in bedroom, kitchen, Mansard roof space
Rectify Balconies. Repair damage interior unit and mansard roof structure
South East corner, water penetration damage into Mansard roof
South West corner, water penetration damage in Bedroom 1, Bedroom 2 & living room
South West corner, water penetration in Bedroom 1, Bedroom 2, Hall
North West Corner, tiling on balcony, water penetration in living room, kitchen. Damage to structures in Mansard roof
Balcony, support steelwork, cracked render. Note, under Unit 27 with rectified balconies
Miscellaneous tiling and cracking problems on balcony (also water penetration see above)
Miscellaneous cracking etc on balcony, shower screen leak (also above).
Wall cap flashing, masonry wall cracking, partition wall cladding crack, shower screen
Shower screen, poorly detailed service penetration NL, cracked masonry NL, poor detailing ceramic tiling (will be rectified with rectification of balcony), door reveal separation NL, masonry cracking
Shower screen, separation of elements NL, steel corrosion etc on #5 steel, masonry crack NL, poor detail services entry NL
Corroded steelwork on #5, penetration of services NL, shower screen, crack bathroom ceiling NL, steel balustrade, ensuite ceiling water penetration NL
5) Corrosion in the steel framework of the balconies
The corrosion of the steel framework of the balconies is in breach of the following BCA requirement:
BCA - Part F1: Performance Requirements FP1.3
A drainage system for the disposal of surface water must:
(a) Convey surface water to an appropriate outfall; and
(b) Avoid the entry of water into a building; and
(c) Avoid water damaging the building.
Corroded balcony support steelwork. Inadequate protective coating
Remove rust. Fully coat with Jotaprime before two finishing coats
Corroded balcony support steelwork. Inadequate protective coating system.
Remove rust. Fully coat with Jotaprime before two finishing coats
Corroded lintel beam, balcony. Inadequate protective coating system.
Remove rust. Fully coat with Jotaprime before two finishing coats
Corroded lintel beam. Inadequate protective coating system
Remove rust. Fully coat with Jotaprime before two finishing coats
Corroded lintel beam. Inadequate protective coating system
Remove rust. Fully coat with Jotaprime before two finishing coats
Corroded lintel beam. Inadequate protective coating system
Remove rust. Fully coat with Jotaprime before two finishing coats
Corroded lintel beam. Inadequate protective coating system
Remove rust. Fully coat with Jotaprime before two finishing coats
Not in RO, in Rpt Jeffry. Corroded balcony support steelwork and balustrade. Inadequate protective coating.
Remove rust. Fully coat with Jotaprime before two finishing coats Repair cracked tiling.
Not in RO, in Rpt Jeffry. Corroded balcony post. Inadequate protective coating system.
Remove rust. Fully coat with Jotaprime before two finishing coats
Corroded support steelwork in Mansard roof space on balcony due to water entry
Remove rust. Fully coat with Jotaprime before two finishing coats
Not in RO. Corroded balustrade, balcony post. Inadequate protective coating.
Remove rust. Fully coat with Jotaprime before two finishing coats
Corroded support steelwork in Mansard roof space on balcony due to water entry.
Remove rust. Fully coat with Jotaprime before two finishing coats
6) Failure of waterproofing in the bathroom areas
The defective capping of the parapet is a breach of the following BCA requirement.
A roof and external wall (including openings around windows and doors) must prevent the penetration of water that would cause:
(a) Unhealthy or dangerous conditions, or loss of amenity for occupants; and
(b) Undue dampness or deterioration of building elements.
The gaps and defects in the roof are a breach of the following BCA requirement:
Mr W.G Stefaniak AM - Appeal President, Mr G. Lunney SC - Senior Member, Mr G. Trickett - Senior Member
8-11 December 2014, 16-17 December 2014, 3-6 February 2015, 10-12 March 2015, 5-8 May 2015, 28-30 July 2015
Building work shall not be carried out otherwise than in accordance with the following requirements:
(a) the materials used in the building work shall conform to the standards for those materials set out in the building code;
(b) the methods of use of those materials in the building work shall conform to the acceptable methods of use set out in the building code;
(c) the building work shall be carried out in a proper and skilful way;
(d) the building work shall be carried out in accordance with the approved plans;
(e) if an owner-builder's licence has not been granted in relation to the building work - the building work shall be carried out by a person who is the holder of a builder's licence of a class that authorises the carrying out of the building work;
(f) if an owner-builder's licence has been granted in relation to the building work - the building work will be carried out by the person to whom the licence has been granted;
(g) the licensee in charge of the building work shall take -
(i) all the safety precautions specified in or with the application for the building approval; and
(ii) any other safety precautions that a certifier or a building inspector may from time to time specify.
A person shall not, without reasonable excuse, carry out building work except in accordance with the building code.
(1) This section applies if the registrar believes on reasonable grounds that -
(a) a licensee or former licensee (the entity) has provided a construction service otherwise than in accordance with this Act or an operational Act; and
(b) it may be appropriate to make a rectification order.
Note 1 If deciding under this section whether it may be appropriate to make a rectification order, the registrar must consider the considerations mentioned in s 36.
Note 2 An example is part of the Act, is not exhaustive and may extend, but does not limit, the meaning of the provision in which it appears (see Legislation Act, s 126 and s 132).
(2) The registrar may give the entity, and the land owner in relation to whose land the construction service was provided, a written notice that -
(a) gives details of the rectification order that may be made; and
(b) explains why the registrar intends to make the order; and
(c) invites submissions about the making of the order within the time stated in the notice that is not less than 5 working days after the day the entity or land owner receives the notice; and
(i) the registrar will not make a rectification order if the registrar is not satisfied that it is appropriate to make a rectification order in relation to the entity; and
(ii) if the registrar does not make a rectification order the Territory may authorise someone else to do the things stated in this notice, and the entity will have to pay for the things to be done.
(a) the registrar has given an entity notice under section 34; and
(b) the entity provided the construction service, or part of the construction service, to which the notice relates; and
(c) after considering any submissions made within the time mentioned in the notice, the registrar is satisfied -
(i) the entity is contravening, or has contravened, this Act or an operational Act; and
(ii) it is appropriate to make a rectification order in relation to the entity.
Note 1 If deciding under this section whether it is appropriate to make a rectification order, the registrar must consider the considerations mentioned in s 36.
Note 2 A reference to an Act includes a reference to the statutory instruments made or in force under the Act, including any regulation (see Legislation Act, s 104).
(2) The registrar may make an order under section 38 (Rectification orders) in relation to the entity.
(3) However, the registrar may not make an order under section 38 in relation to the entity if a submission is made that satisfies the registrar that the act that caused the contravention happened, or ended, more than 10 years before the day the registrar proposes to make the order.
A builder built a house without a building approval. The registrar is satisfied that the building of the house started 12 years ago and finished 9 years ago. The registrar may make a rectification order in relation to the construction service of building the house.
Note An example is part of the Act, is not exhaustive and may extend, but does not limit, the meaning of the provision in which it appears (see Legislation Act, s 126 and s 132).
(1) In deciding whether it is, or may be, appropriate to make a rectification order in relation to an entity that is contravening, or has or may have contravened, this Act, the registrar must consider the following:
(a) any injury, loss or damage caused, or that could have been caused, by the contravention;
(b) if a rectification order is proposed - how the proposed order may affect people affected by the contravention.
Examples of effect of contravention, including injury, loss and damage
Note An example is part of the Act, is not exhaustive and may extend, but does not limit, the meaning of the provision in which it appears (see Legislation Act, s 126 and s 132).
(2) The registrar may consider anything else that is relevant.
(3) However, the registrar need not consider whether the registrar, planning and land authority, a certifier or other entity has -
(i) this Act or an operational Act in relation to the construction service; or
(ii) the Planning and Development Act 2007 in relation to the place where, or the territory lease under which, the construction service was provided; or
(b) otherwise endorsed the construction service under this Act or an operational Act.
FP1.3 A drainage system for the disposal of surface water must- (a) convey surface water to an appropriate outfall; and (b) avoid the entry of water into a building; and (c) avoid water damaging the building.
FP1.4 A roof and external wall (including openings around windows and doors) must prevent the penetration of water that could cause- (a) unhealthy or dangerous conditions, or loss of amenity for occupants; and (b) undue dampness or deterioration of building elements. Limitation: (a) (b) , or (c) an or . FP1.4 does not apply toa Class 7 or 8 building where in the particular case there is no necessity for compliance; or a garage, tool shed, sanitary compartment the like, forming part of a building used for other purposes; or open spectator stand open-deck carpark
[2] Transcript of Proceedings 14 December 2014 page 585 and T-Documents page 762
[3] Transcript of Proceedings 6 May 2015 page 2119
[4] Transcript of Proceedings 14 December 2014 page 585
[5] Transcript of Proceedings 14 December 2014 page 587
[6] Respondent's submissions at [21.1]
[7] Transcript of Proceedings 5 May 2015 page 1999
[8] Transcript of Proceedings 11 March 2015 page 1749
[9] Transcript of Proceedings 11 March 2015 page 1748
[10] Transcript of Proceedings 11 March 2015 page 1749
[11] Transcript of Proceedings 6 May 2015 page 2127
[12] Transcript of Proceedings 5 May 2015 page 2007
[13] Transcript of Proceedings 11 March 2015 page 1749
KOUNDOURIS
CONSTRUCTION OCCUPATIONS REGISTRAR & ORS