[2018] VCAT 1462
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2018-09-20
Original judgment source is linked above.
A Traffic & Parking Impact Report prepared by a qualified traffic engineer should be submitted as part of any planning permit application that provides parking at a rate less than stated above. This report should provide evidence based on investigation of similar facilities with similar locational characteristics to justify any reduction in on-site parking rates.
Car spaces should be undercover, well lit and not located in the front setback area or visually dominate the front façade of the building.
The plans must be generally in accordance with the plans submitted with the application, but modified to show:
(a) The location and design of any proposed electricity supply meter boxes. The electricity supply meter boxes must be located at a distance from the street which is at or behind the setback alignment of buildings on site or in compliance with Council's 'Guide to Electricity Supply Meter Boxes in Monash'.
(b) Provide a corner splay or area at least 50% clear of visual obstructions (or with a height of less than 1.2 metres), which may include adjacent landscaping areas with a height of less than 0.9 metres, extending at least 2.0 metres long x 2.5 metres deep (within the property) both sides of each vehicle crossing to provide a clear view of pedestrians on the footpath of the frontage road.
(c) The central footpath removed and pedestrian access provided directly off the driveway.
(d) The marking of two additional car parking spaces, side-by-side, in tandem in front of the double garage on the site.
A memorandum of the Agreement is to be entered into on title and the cost of the preparation, checking and execution of the Agreement and entry of the memorandum on title is to be paid by the owner.
The Site Management Plan is to be prepared to the satisfaction of the Responsible Authority and shall only be amended with the written consent of the Responsible Authority.
unless otherwise approved in writing by the Responsible Authority.
When approved the plan will be endorsed and will then form part of the permit.
In accordance with section 69 of the Planning and Environment Act 1987, an application may be submitted to the responsible authority for an extension of the period referred to in this condition.
In accordance with section 69 of the Planning and Environment Act 1987, an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
Kong
Monash CC