The proposed building work that gives rise to the need for protection work is construction of a retaining wall and fence on boundary. Reconstruction to shed. Reconstruction to shed.[2]
...however if there is any distrubtion (sic) the adjoining property owner will be notified.
(a) permanent or temporary work of -
(i) underpinning, including the provision of vertical support, lateral support, protection against variation in earth pressures, provision of ground anchors and other support for adjoining property; or
(ii) shoring up of adjoining property; or
(iii) overhead protection for adjoining property; or
(iv) other work designed to maintain the stability of adjoining property or to protect adjoining property from damage from building work; or
(b) any work or use of equipment necessary for the provision, maintenance and removal of work referred to in paragraph (a) -whether or not the work or equipment is carried out or used on, over, under or in the air space above the land on which the building work is or is to be carried out or the adjoining property.
An owner must compensate any adjoining owner or adjoining occupier for inconvenience, loss or damage suffered by the adjoining owner or adjoining occupier in connection with the carrying out of protection work under this Part.
Other disputes between owners and adjoining owners
If an owner and adjoining owner cannot agree in relation to a matter arising under Part 7, and the Building Appeals Board does not have jurisdiction to deal with that matter under any other provision of this Part, either of them may refer the matter to the Building Appeals Board.
An adjoining owner who suffers inconvenience, loss or damage during the carrying out of protection work under Part 7 may apply to the Building Appeals Board for an order determining the amount (if any) of compensation for that inconvenience, loss or damage.
THE SUBMISSIONS OF THE APPLICANT (in summary form)
(a) The Adjoining Property has been damaged as a result of inadequate protection work during the construction of the new garage on the Building Site.
(b) The excavation and removal of a quantity of soil prior to pouring the garage's concrete floor created subsidence that loosened the pavers on the Adjoining Property and the issues to the boundary fence.
(c) The fence was newly constructed in or around March/April 2022. The Applicant disagrees it was in poor condition prior to the building work. It was designed to have removable panels to assist in the construction. However, the panels were not removed.
(d) The Interested Party agreed to fix pavers but not the fence. However, additional works are required to fix the paving and the parties have not agreed to the works or compensation.
(a) existing timber fence $5,605.00
(b) newly constructed pavers $1,590.00
(c) Markup 32% (inc supervision $2,302.40
(a) Filing fees $1,315.87
(b) Title Searches $ 59.95
(c) Quest Report fee $3,600.00
(d) Legal Fees $7,712.48
(a) The new garden shed is 5,000mm wide x 9,500mm long with a maximum wall height of 3,600mm with a 10 degree roof pitch. It was built within 200mm of the share boundary between both properties and includes an internal mezzanine floor level.
(b) The new garden shed was built with a surrounding retaining wall which runs along the entire perimeter of the shared eastern boundary of the new garden shed including the front concrete landing which is built over the top of a 100mm thick concrete reinforced slab and associated footing along the same shared boundary.
(c) As part of the works, the timber boundary fence has clearly shifted. The plinth has shifted from the timber palings. The expert opines this is due to lack of adequate support during construction.
(d) The 'as installed' pavers at the property were affected as a result of construction activity. There is evidence of lippage and settlement of the external pavers as a result of construction of the new garden shed immediately adjacent. The change in levels recorded was 17mm. A gap between the paver and the timber fencing has occurred. The widest gap is 55mm.
THE SUBMISSIONS OF THE RESPONDENTS (in summary form)
(a) The Respondents do not accept the fence has shifted as a result of works to any significant degree. Further they do not accept the Applicant's paving or any other property has been damaged or moved as a result of the works.
(b) The Respondents say the proceedings are motivated by discontent at seeing the garage wall.
(c) The fence was replaced due to its failure in a storm. Further, the remaining section of fence is old and weathered. The Respondents wrote to the Applicant's solicitors on 3 April 2023 to seek independent cost for the fence work. The Respondents did not receive a response. The Respondents further rely on the Fences Act 1968 noting the failure to provide opportunity to obtain a quotation means that they cannot give her notice.
(d) The Respondents were not in attendance during any discussions between the Applicant and Interested Party and cannot assist in relation to what offers may have been made.
(e) The Respondents deny that the fence was not propped or supported as the photographs were taken prior to works commencing. They further alleged the altered photographs depicting horizontal lines in the Quest Report are misleading. The Respondents enclose photographs from site inspections demonstrating propping did occur.
(f) The scope of works for rectification is excessive. They do not accept it would take 4 hours to move outdoor furniture back in place.
(g) The Applicant's referral of a matter pursuant to s 155 of the Act relates not to protection work but an allegation that a breach of an agreement under the protection notice caused damage to the Adjoining Property.
(h) The Applicant has not provided evidence of the costs claimed in relation to filing fees, certificate of title, Quest Report fee or legal fees. Further, the Applicant has acknowledged drafting up the points of claim herself. The legal fees incurred, have occurred prior to the proceedings being commenced.
(i) The Respondents seek their costs for arranging the Interested Party to deal with this matter in the sum of $3,150 and the Engineering Report fee of $1,980.
(j) The Respondents have attempted to resolve this matter with the Applicant.
(a) The height of the timber fence is not vastly different to the pre-work height. There are no measurements provided to support the measurements as being different.
(b) Photographs of the fence during construction demonstrating propping to the timber fence occurred. There is no evidence the timber fence has dropped.
(c) The Adam's Report reviewed photographs of the pavers. There are no pre-construction photographs for comparison. The pavers are believed to be on natural ground rather than supported on concrete paving slab. Depending on the level of compaction and material under the pavers, it is common to expect ground movement to loosely installed pavers over time. Stormwater will enter the gaps between the pavers and cause subsidence or movement over time. The Adams Report concluded that it was not the works at the Building Site which caused movement.
THE SUBMISSIONS OF THE INTERESTED PARTY (in summary form)
(a) There is an unsubstantiated claim for damage to the Applicant's pavers.
(b) There is a claim for replacement of the boundary fence which does not form part of the contract with the Respondents. There is no movement in the fence and independent engineering inspection confirm there is no subsidence, the Interested Party has made an offer to replace this section of the fence.
(c) The Interested Party has offered to complete the minor works to the fence and pavers or settle the amount of $4,000 to undertake the works independently.
(d) The Quest Report's costing is inflated. The Interested Party states the current costs for timber paling fencing is around $165 per linear metre which would allow for replacement of approximately 33 lineal metres of fence and not the 4-5 metres in question.
(e) The Interested Party considers the claim vexatious and will seek its own costs of being a party to the proceedings.
(a) If the builder has carried out the required protection work, removal and replacement of the fence, then the damage to the pavers would have been noted and measures to prevent it could have occurred. This may have included building a retaining wall of sufficient height along the entire length and more of the shared boundary where the garage was to be sited.
(b) During the construction she noted movement in the backyard pavers and paling fence. It is her assertion that both of these conditions have arisen as a direct consequence of the builder failing to prevent backyard soil and underpinnings from slipping into the Building Site.
(c) The Interested Party admitted liability for some of the damage.
(d) The Respondents admit at some point before or during the construction of their garage commencing, there was a time when the common boundary fence was not adequately propped up. The Respondents have not provided dates or evidence that the props were applied to the fence. The Applicant does agree that the props were installed at some stage to the fence.
(e) The pavers are laid on a bed of sand which provide a permeable surface to allow water to drain through the pavers and into the ground. The pavers were laid in March 2017 and go for a distance of 24 metres. The last 6 metres have become dislodged due to the construction of the garage.
(f) The Adams Report author did not inspect her property.
(g) The fence is serviceable. The current condition of the old section of paling fence is a direct consequence of the builder choosing not to install the necessary protection work.
(h) The Interested Party admitted partial liability for the damages. The Applicant rejected both the offer to fix damage and the cash offer.
(a) Compensation claims under s 155 of the and 159 of the Act;
(b) The protection work relevant to a compensation claim;
(c) Weather the Applicant has established the claim for damage to fencing; and
(d) Weather the Applicant established the claim for damage to the paving?
Compensation claims made under ss 155 and 159 of the Act
An owner must compensate any adjoining owner or adjoining occupier for inconvenience, loss or damage suffered by the adjoining owner or adjoining occupier in connection with the carrying out of protection work under this Part [7].
If an owner and adjoining owner cannot agree in relation to a matter arising under Part 7, and the Building Appeals Board does not have jurisdiction to deal with that matter under any other provision of this Part, either of them may refer the matter to the Building Appeals Board.
An adjoining owner who suffers inconvenience, loss or damage during the carrying out of protection work under Part 7 may apply to the Building Appeals Board for an order determining the amount (if any) of compensation for that inconvenience, loss or damage.
59. In my view, the words in connection with do no more than broaden the circumstances where compensation can be claimed to include situations where the carrying out of protection work has not been executed properly, wholly, or where there has been a complete failure to carry out protection work when it should have been carried out. This is consistent with the observations of the Board in Wilkins & Anor v Malsons International Pty Ltd [2021] 60 where Member McFadzean observed:
VI. The expression 'in connection with' in 98 of the Act is a broad term, that should be interpreted in a practical manner, that reflects (amongst other matters, that protection work is meant to protect an adjoining owner from risks of significant damage, which may arise as a result of building work on the subject property.
VII. The concept of 'carrying out' of protection work should be interpreted in a holistic manner, which has regard to the work that is undertaken, and the work that is not undertaken. It is analogous to assessing whether a person carried out their work in a professional manner - such an assessment would address what the person did, as well as what actions they failed to do.
[M]oney paid or liabilities incurred for professional legal services and out-of-pocket disbursements or expenses, such as filing fees, expert witness fees, et cetera, where directly related to the proceeding before the Board.
(a) Filing fees $1,315.87
(b) Title Searches $ 59.95
The protection work relevant to a compensation claim
The boundary fence to the east side of 14 Vonadawn Avenue, Ringwood East will need to be removed and replaced to complete the work.....The only access in which we will need to gain access to the adjoining property is when the boundary fence is removed and replaced.
....is the construction of a retaining wall and fence on boundary. Reconstruction to shed. Reconstruction to shed [sic]
(a) The fenceposts appeared plumb to vertical
(b) The fence rails and posts were in excellent condition
(c) The fence rails and posts were well supported and connected
(d) The fence appeared stable and withstood the application of cautious lateral force by hand.
(e) The fence was adjacent to the building works and appeared to have been installed on the subject matter property below the plinth rather than on the plinth of the fence. The original fence outline was clear due to the unpainted areas of the plinth. There was a 60mm gap between the original plinth of the fence and the fence next to the building work.
(a) Pavers were visibly uneven varying between -14.5mm and more than +23.5mm
(b) Paver alignment to the fence was varied
(c) There was evidence that the base under the pavers had deteriorated and there were gaps evident underneath.
[1] Clause 17 of Schedule 3 to the Building Act 1993 provides: 'Unless the Building Appeals Board otherwise determines, a party to a proceeding before the Board must bear his, her or its own costs'.
[3] See page 231 of the e-brief material
[5] See Leahy & Anor v Railway Ave Pty Ltd [2021] VBAB 86 [56].
[6] See e-hearing recording at time 38:04
[7] See e-hearing recording time stamp 39:30