[2009] VCAT 2534
Victorian Civil and Administrative Tribunal
2009-11-27
Mr J
Original judgment source is linked above.
Application under section 77 of the Planning and Environment Act 1987; Melbourne Planning Scheme; Mixed Use Zone; Heritage Overlay HO770; Design and Development Overlay DDO33; Proposal to Demolish Part of Existing Building and Construct a 14 Storey Addition Containing Residential Apartments, a Licensed Café and Reduced Car Parking; Impact on Heritage Significance of Place and Building; Development Potential of Adjoining Sites; Amenity of Nearby Residents; Car Parking Provision and Traffic; Appropriateness of a Licensed Café.
Jopsal Pty Ltd v Melbourne CC [2009] VCAT 2534
Mr J Gobbo QC instructed by Best Hooper solicitors.
Mr H Jackson, barrister instructed by Ms B Ryan of Melbourne City Council
The site is on the south side of Batman Street, between King and Spencer Streets in West Melbourne.
It has a frontage of 30.35m, a depth of about 50m and a total area of approximately 1,520sqm.
It is currently occupied by a circa 1940s single storey engineering factory building of moderne style. Vehicle access into the building is provided through a central, single width access from Batman Street.
The surrounding area contains a mix of land uses, building heights and styles.
TP-2005-1236 was issued on 4 December 2006 and has been extended so it will expire on 4 December 2010. This Permit allows partial demolition and alterations to the existing building and use as 22 offices with a partial waiver of the standard car parking requirement.
Section 77 Planning and Environment Act 1987
Cl 32.04-1 & 32.04-7 To use land as a food and drink premises (café) and undertake associated buildings and works in MUZ
Cl 32.04-5 To construct two or more dwellings on a lot in MUZ
Cl 43.01-1 To demolish a building, construct a building and construct or carry out works in HO770
Cl 43.02-2 Buildings and works not in accordance with the 6 metre podium setback requirements set out in the Table in DDO33
It is proposed to demolish all but the front 8.5 metres of the existing building, the eastern side wall and part of the sawtooth roof. A new 14 storey building will be built in place of the demolished section.
The new building will be 40 metres high. Overall, the development contains:
The front façade and front section of the existing building is retained and a new tower featuring predominantly glass on three sides with a rear sculptured concrete façade is to be constructed. Mr Fraser described the design of the new building as a simple form with the lowest tower level setback about 10 metres from the front façade. The upper levels of the tower overhang this level (with an approximate 8 metre front setback) to create a deliberately dark element to separate the old and new elements of this development.
The Effect on the Heritage Significance of this Site and Precinct
The objectives and outcomes within the revised Design and Development Overlay 33 have been drawn from the Council's built form vision for this part of West Melbourne, and also, where relevant, draw on the land use strategies. The proposed introduction of discretionary height controls seek to give direction about the scale of development that is considered appropriate to achieve the transition in scale between the Central City and the lower areas of West Melbourne.
Partial demolition of existing building and construction of a 14 level building, use of part of land as a licensed café, reduction of standard car parking requirements and waiver of loading bay requirement in accordance with the endorsed plans.
The permit must contain the following conditions:
Prior to the commencement of buildings/works other than demolition works, the applicant must provide an environmental site assessement report by a suitably qualified expert. The report must include recommendations as to whether the history of the site and the proposed use of the site requires that an environmental audit ought to be undertaken pursuant to the Environment Protection Act. If no environmental audit is required, the report must provide recommendations about the management of any potentially contaminated land during and after construction. The report will form part of this permit and the applicant must comply with the recommendations to the satisfaction of the Responsible Authority.
Any extension of these hours will require separate planning approval.
The Responsible Authority may extend the dates upon which this permit expires only if it receives a request in writing before the permit expires, or within three months afterwards.
[1] Clearly there remain other reasons why a permit is required including constructing two or more dwellings on the site and to demolish and build in a Heritage Overlay.
[2] Which means no planning permission would be required under DDO33
[3] Specifically his observations at paragraphs 29 and 31 to 32
[5] Mr Walsh stated there may be a conflict in 1 in 100 vehicle movements
Jopsal Pty Ltd
Melbourne CC [2009] VCAT 2534