Construction of a residential aged care facility and creation of an access on to a Road Zone Category 1 subject to the following conditions.
Prior to the commencement of the development, three (3) copies of plans drawn to scale and fully dimensioned, must be submitted to and approved by the Responsible Authority. The plans must be generally in accordance with the following plans prepared for Knowles Group, Drawing No's: TP01, TP02B, TP03B, TP04, TP05, TP06, TP07, TP08, TP09, TP10 dated October 2010 but modified to show:
(a) The landscape plan modified as required by Condition 8.
(b) Provision of two showers and one change room to the satisfaction of the responsible authority.
(c) The loading bay dimensioned.
(d) Dimensions of the 'at grade' car spaces within the front setback.
(e) Any changes as required by Condition 3.
(f) A reduction in the height of the northern wall of the central wing and an increase in the setback of bedrooms 77 & 90 generally in accordance with Drawing No TP11 RevA. All elevations must be updated to include this information.
(g) Modifications to the application plans, generally in accordance with TP03 RevC, TP04 RevB and TP05 RevB.
(h) Provision of an acoustic fence, of a minimum weight of 12kg/sqm and of a height of 1.8 metres, between the courtyards to units 1-6 inclusive and the adjacent loading area.
(i) Details of the treatment of balustrades (or other suitable alternative) to provide acoustic protection to units 31-39 and 70-82 provided in accordance with the recommendations of a qualified acoustic engineer, to the satisfaction of the responsible authority. The treatment can be in the form of a suitable acoustic barrier at the normal height of a balustrade (e.g. 1 metre).
(j) Notation that the acoustic fence provided along the boundary between the subject site and the property at 1995 Malvern Road is to be of a minimum weight of 12kg/sqm and of a height of 1.8 metres, and extend at that height from the rear boundary of 1995 Malvern Road to a point 4 metres in front of (that is closer to Malvern Road than) the front wall of the dwelling at 1995 Malvern Road. Thereafter the acoustic fence can step down in height to the street frontage.
(b) Condition 3 is amended to read:
Prior to the commencement of the development hereby approved, a stormwater detention system (or suitable alternative) to restrict the post development runoff to no greater than pre-development runoff, must be designed, submitted and approved to the satisfaction of the Responsible Authority. That stormwater detention system (or suitable alternative) must be constructed and operational prior to the occupation of the development hereby approved, to the satisfaction of the responsible authority.
The food and drink premises (café) must only be made available to the staff members, residents and visitors to the aged care facility at all times to the satisfaction of the responsible authority.
(i) confirmation that the hours of delivery of waste is between 7.00am and 5.00pm Monday to Friday and between 7.00am and 1.00pm Saturday.
A landscape plan must be submitted to the Responsible Authority that is generally in accordance with the landscape plan prepared by Carol Frank-Mas & Associates on 5 July 2011 and marked 'Dwg. No. 2595/1A', but amended to show:
(a) The inclusion of at least two 3.75m x 2.5m planters in the north-facing courtyard and any consequential landscaping changes.
(b) A planting schedule of all proposed tree, shrubs, climbers, tussock grasses and ground covers, including botanical names, common names, pot sizes, sizes at maturity, quantities of each plant.
(c) Buildings and trees (including botanical names) on neighbouring properties within three metres of the boundary.
(d) Details of surface finishes of pathways and driveways.
(e) Details of proposed watering system for landscaping from water tanks on site.
(f) The extent of any cut, fill, embankments or retaining walls associated with the landscape treatment of the site.
(g) The acoustic barrier that separates the courtyard in front of units 1-6 from the loading bay area.
(h) The sight triangles (with a length of 2.5 metres and a width of 2 metres) at the property boundary to be kept clear of obstructions to visibility.
(i) Any changes required to give effect to Condition 3, to the satisfaction of the responsible authority.
When endorsed, this landscape plan will form part of the permit.
A legal point of stormwater discharge must be obtained from Council and a drainage design for the development must be prepared by a suitably qualified engineer in compliance with Council's report prior to a Building permit being issued and to the satisfaction of the responsible authority. The drainage must be constructed in accordance with the Engineer's design.
Unless with the prior written consent of the responsible authority, waste collection must be restricted to the hours between 7.00am and 5.00pm Monday to Friday and 7.00am to 1.00pm on Saturdays, to the satisfaction of the responsible authority.
Unless with the prior written consent of the responsible authority, the loading and unloading of goods from vehicles must only be carried out on the subject land within the designated loading bay, during the hours of 7.00am to 5.00pm Monday to Friday and 7.00am to 1.00pm on Saturdays, and must be conducted in a manner which does not cause any interference with the circulation and parking of vehicles on the land.
Once all plant equipment is installed and commissioned, an independent acoustic assessment of plant equipment must be undertaken to the satisfaction of the responsible authority in order to ensure that noise emissions from that plant complies with the State Environmental Protection Policy (Control of Noise from Commerce, Industry and Trade) No N-1 (SEPP N-1). A report on the findings of the assessment must be submitted to the responsible authority. Any works recommended to be undertaken in that report, must then be installed to the satisfaction of the responsible authority.
(j) Conditions 19 onwards are renumbered to commence from Condition No 22.
Mr Philip Bisset, Solicitor of Minter Ellison Lawyers. He called written and oral evidence from Mr Marco Negri of Contour Consultants (town planner), Ms Elizabeth Hui of Marshall Day Acoustics (acoustic engineer) and Mr Tim McKinley of Cardno (traffic engineer). A witness statement was also lodged from Ms Carol Frank-Mas of Carol Frank-Mas Landscape Architects (Landscape Architect), however the parties and the Tribunal advised that they did not wish to cross examine that expert.
Mr Gareth Gale, Planning Appeals Co-ordinator of Stonnington City Council
Mr Oliver Blumberg appeared representing himself and Mrs Victoria Black, Ms Jane Tierney and Ms Esther Blumberg.
Mr Sarkis Tepeli appeared representing himself and Ms Sarah Alvares.
Development of the land with an aged care facility in a three storey building with a basement car park
s87A to amend a permit issued at the direction of the Tribunal
Construction of a residential building in accordance with Clause 32.01-4 (R1Z).
Creation of an access to a Road Zone Category 1 under Clause 52.27.
The site is bounded on three sides by roads - to the west[1] by Malvern Road and to the south and east by Cairnes Crescent. To the north it shares a boundary for most of its length with a SCOPE assisted living facility facing Cairnes Crescent and for a shorter distance with a double storey dwelling facing Malvern Road. The review site has an area of 4943m2, has a considerable downward slope from the south western to the north eastern corner of 4.95 metres and is now cleared of institutional buildings that were previously owned and occupied by SCOPE. Some mature vegetation and low fencing remains along the street frontages. Vehicle access to the previous institutional use was via a crossover to Malvern Road. The area around the review site is residential. A dwelling located opposite the review site on the south-east corner of Cairnes Crescent and Malvern Road includes a paved backyard with three line marked car spaces[2].
Crowncross Pty Ltd v Stonnington CC [2009] VCAT 2128
Recognise that residential aged care facilities contribute to housing diversity and choice, and are an appropriate use in a residential area.
Recognise that residential aged care facilities are different to dwellings in their purpose and function, and will have a different built form (including height, scale and mass).
The planning system needs to be able to cope efficiently with such changes or other subsequent changes to the use or development of a site for whatever reason. It is important that changes are handled in a way that addresses their substantive merits; ensures that when eligible third persons may be genuinely affected, they are notified and given an opportunity to be heard; and that applications are processed and decisions are made about changes efficiently and in a timely way. The reforms to the Planning and Environment Act 1987 by the introduction of Division 1A and section 87A enables these objectives to be achieved by focussing on the proposed changes, rather than re-opening debate about the whole proposal. Importantly, what happens on a site, can be managed through a single permit document, which is a more transparent process and less likely to result in inconsistencies than having multiple permits for the same site accumulate over time.
[1] Malvern Road does not run in a north south direction and the boundaries do not align with the four main compass points. However, for convenience we have adopted the north, south, east and west descriptions used by Council and residents.
[2] This is the land description provided in the decision of Crowncross Pty Ltd v Stonnington CC [2009] VCAT 2128.
[3] Crowncross Pty Ltd v Stonnington CC [2009] VCAT 2128
[4] A number of these decisions are summarised in Graphos (Aust) Pty Ltd v Nillumbik SC [2008] VCAT 2321
[5] Previous decisions include Crown Cross Pty Ltd v Stonnington CC [2004] VCAT 2516, Crown Cross Pty Ltd v Stonnington CC [2005] VCAT 787, Blumberg v Stonnington CC [2006] VCAT 1113, Crowncross Pty Ltd v Stonnington CC [2008] VCAT 2275, Crowncross Pty Ltd v Stonnington CC [2009] VCAT 2128.
J & G Knowles & Associates Pty Ltd
Stonnington CC [2012] VCAT 22