appellant. By consent, both applications for review (DR 396 of 2006 and DR 397 of 2006) were allowed. Subdivision approvals were granted to the respective plans subject to the conditions set out in...
Key principles
Where comprehensive planning in the form of an endorsed structure plan and a local planning strategy has been prepared and approved after an initial refusal, a tribunal may grant...
Section 138(2) of the Planning and Development Act 2005 requires the Commission to have due regard to a local planning scheme and not to give approval that conflicts with it, but...
A local planning scheme's requirement for a structure plan (here cl 3.16.2 and cl 3.16.5 of TPS 1) can be satisfied by a subsequently approved structure plan and supporting...
Community opposition and submissions are relevant matters in planning assessment but do not override zoning and properly adopted strategic planning instruments that contemplate...
Issues before the court
Should the Tribunal grant subdivision approval for the two proposed subdivisions despite an earlier refusal by the Commission based on lack of...
Plain English Summary
The Tribunal granted consent subdivision approvals for two proposed developments totalling 375 lots near Toodyay after the Shire and Commission approved a Local Planning Strategy and a site Structure Plan during review proceedings. The Tribunal found the new strategic documents satisfied the scheme's structure plan requirement, the proposed subdivisions did not conflict with the local planning schemes or state planning policy, third party objections did not justify refusal, and agreed conditions appropriately addressed infrastructure and environmental matters. The approvals were ordered by consent with each party to bear its own costs.
AI-generated legal information, not legal advice. Zoe can make mistakes. Check the cited source, and for advice about your situation consult a qualified Australian lawyer.
Deep Dive
1,795 words · generated 21/07/2026
What happened
Ironbridge Holdings Pty Ltd lodged two subdivision applications for land north and east of the Toodyay townsite (Lot 3 and Lot 6), together proposing 375 residential lots (paras 3-5). The Western Australian Planning Commission refused the applications because the land was subject to scheme provisions that required a structure plan and comprehensive planning prior to subdivision (para 6; see TPS 1 cl 3.16.2 and cl 3.16.5 quoted at para 18). Ironbridge sought review in the State Administrative Tribunal under s 251(1) of the Planning and Development Act 2005 (PD Act) (para 3).
Do the proposed subdivisions conflict with the provisions of TPS 1 or the newly gazetted LPS 4 such that approval would be prohibited under s 138(2)...
Do submissions from third parties (Toodyay Ratepayers' and Residents' Association and Mr Graham) provide grounds to refuse the subdivision...
Are the conditions agreed between the parties appropriate to enable approval?
Cited legislation
3 cited instruments linked from this judgment.
During the tribunal proceedings the Shire and the Commission approved two key strategic documents: the Foggarthorpe Residential Structure Plan (SP) and the Shire of Toodyay Local Planning Strategy (LPS) (para 7). After these approvals the applicant and the Commission sought consent orders for subdivision approvals subject to agreed conditions (para 8). The Tribunal granted leave to the Toodyay Ratepayers' and Residents' Association and to Mr Larry Graham to make written submissions (para 10), received the submissions and submissions from the parties (para 11), and determined the matter on the papers (para 10). Ultimately the Tribunal allowed the review by consent and granted subdivision approval subject to the conditions in Attachments A and B, with each party to bear its own costs (paras 48-49).
Why the court decided this way
The Tribunal’s decision turns on statutory and scheme consistency, and whether the original ground for refusal had been addressed.
Statutory framework. Section 135 PD Act requires Commission approval for subdivision; s 138(2) PD Act requires the Commission to have due regard to any applicable local planning scheme and not grant approval that conflicts with it (para 14). That statutory constraint framed the Tribunal’s task: could the Commission now lawfully approve the subdivisions consistent with the schemes?
Scheme requirements. TPS 1 contained a zone designated 'Urban 6 - Future Urban' with an express requirement that a Structure Plan approved by the Commission and Council be prepared prior to subdivision of the land (TPS 1 cl 3.16.2 and cl 3.16.5 quoted at para 18). The Commission’s original refusal was essentially grounded in the absence of such a structure plan (para 6).
Subsequent strategic approvals cured the deficiency. The Tribunal found that the Foggarthorpe Structure Plan and the Shire’s Local Planning Strategy satisfied the scheme’s structure plan requirement and provided the comprehensive planning that had been missing (paras 7, 33). The Tribunal expressly held that the original reason for refusal had been satisfactorily addressed (para 43).
Consistency with the strategic framework and SPP 3. The LPS identified the site and adjacent area as one of only two large-scale residential subdivision sites in the Shire and anticipated 650-700 lots from those areas; it identified a need for at least 500 new dwelling units within the Toodyay townsite by 2021 (paras 22-24). The Tribunal found the proposed 375 lots formed part of the strategy to meet anticipated population growth and were consistent with State Planning Policy No 3’s aim of managing growth by directing it to appropriate locations adjacent to existing towns (paras 22-30).
Third-party submissions and amenity concerns. The Tribunal assessed objections from the Association and Mr Graham concerning population, services, amenity and the town’s character. It rejected the Association’s calculations on growth (applying a Shire-wide basis gave a 3% rate rather than the Association’s 5.35%), and concluded that infrastructure arrangements would be met by conditions and that the planning instruments contemplated the development (paras 21-26, 30-31). Mr Graham’s expectations about rural outlook were acknowledged but held insufficient because Future Urban zoning and the later LPS/SP reasonably contemplated urban development (paras 44-46).
Conditions. The agreed conditions required the subdivider to deliver infrastructure, environmental management and design measures including engineering plans, roads, drainage, water and sewer arrangements, design guidelines, notification of noise and geotechnical constraints, foreshore and nutrient management, and other works (Attachments A & B). The Tribunal considered these conditions appropriate and reasonable (paras 12, 48).
Collectively, because the new strategic documents satisfied the scheme’s pre-conditions, the proposed subdivisions did not conflict with TPS 1 or LPS 4, and the conditions addressed infrastructure and amenity issues, the Tribunal allowed the review and granted approval by consent (paras 16, 33, 42-43, 48-49).
Before and after state of the law
Before this decision in practical terms the Commission had refused the applications on principle: the planning scheme required a structure plan before subdivision could occur. The refusal reflected a common local-government approach to prevent premature subdivision before comprehensive planning is in place (paras 6, 18).
After the Tribunal’s decision, the legal effect is application-specific rather than a sweeping precedent. The Tribunal emphasised that where a scheme conditions subdivision on the preparation and approval of a structure plan, that pre-condition can be satisfied during the course of review proceedings. If, as here, the structure plan and related local planning strategy are adopted and the proposed subdivision is consistent with those instruments and the scheme, the original ground for refusal is removed and approval may properly be granted by consent, subject to appropriate conditions (paras 7, 33, 42-43). The Tribunal also clarifies that community opposition does not trump adopted strategic planning that contemplates the development (paras 30-31).
Note: the Tribunal expressly avoided deciding whether an old scheme (TPS 1) continued to bind the Commission by way of accrued rights after revocation and replacement by LPS 4, because no conflict arose in any event (para 16). Thus the decision does not settle legal questions about accrued rights and transitional application of schemes; it proceeds on the basis that approving the subdivisions did not conflict with either scheme.
Key passages with plain-English translation
Statutory constraint (para 14): "Subject to subsection (3), in giving its approval under section 135 or 136 the Commission is to have due regard to the provisions of any local planning scheme that applies to the land under consideration and is not to give an approval that conflicts with the provisions of a local planning scheme."
Plain-English: The Commission must respect the local planning rules; it cannot approve a subdivision that goes against the scheme's rules.
Scheme rule requiring a structure plan (para 18): TPS 1 required preparation and approval of a Structure Plan by the Commission and Council before subdivision of the Urban 6 land.
Plain-English: The local rules said "you cannot subdivide this land for urban purposes until you have an approved plan showing how it will be developed."
Tribunal’s core finding (para 43): "The Commission's original reason for refusal of the subdivisions ... has been satisfactorily addressed since the refusals and during the course of the proceedings by the LPS and the SP."
Plain-English: The key reason the Commission refused was fixed: the Council and Commission approved the necessary planning documents, so that refusal-ground no longer applies.
Planning strategy contemplates development (paras 22-24): LPS identifies site as one of only two large-scale residential areas, estimating 650-700 lots likely.
Plain-English: The local planning strategy specifically earmarked this area for a big residential development; the proposed subdivision fits the plan.
Community views do not determine legal compliance (para 31): The Tribunal noted community wishes for "no further residential development" conflicted with the zoning and the strategic planning that actually permits the subdivision.
Plain-English: Local opposition is a factor the Tribunal considers, but it cannot defeat proper zoning and adopted strategic plans.
What fact patterns trigger this precedent
This decision is informative when the following fact pattern occurs:
A proposal for a large-scale subdivision is refused because the local planning scheme requires a structure plan or comprehensive planning before subdivision, and;
During review proceedings (or after the refusal), the local government and/or the Commission approve a structure plan and/or a local planning strategy that address the scheme’s pre-conditions, and;
The approved strategic instruments contemplate the development and there is no direct conflict between the proposed subdivision and the operative planning scheme provisions, and;
The applicant and the decision-maker can agree appropriate conditions to secure infrastructure and environmental outcomes.
In that situation, this case demonstrates the Tribunal will allow a consent approval where the structure plan requirement is now met, consistent with s 138(2), and third-party objections do not otherwise establish a legal basis for refusal (paras 7, 12, 16, 33, 42-43).
How later courts have treated it
The judgment itself does not record subsequent appellate consideration or later authorities treating this decision. The Tribunal cited earlier WASAT decisions about accrued rights (Western Australian Planning Commission and CPP Pty Ltd [2006] WASAT 379 and Miller and City of Stirling [2007] WASAT 247) when noting it was unnecessary to resolve whether an earlier scheme continued to apply (para 16). The text does not provide material on how later courts or tribunals treated this 2008 decision. Practitioners should therefore treat this decision as a persuasive administrative tribunal decision on facts where post-refusal strategic approvals cure the original ground for refusal; for authoritative precedent or appellate development further legal research external to this judgment is required.
Still-open questions
The Tribunal explicitly left certain legal questions open:
Accrued application of a revoked scheme: The Tribunal said it was unnecessary to decide whether TPS 1 continued to apply for s 138(2) purposes by way of an accrued right after LPS 4 was gazetted because no conflict arose; it therefore did not resolve the legal test or circumstances under which an earlier scheme survives for s 138(2) purposes (para 16). That question remains open in this decision.
Weight to be given to community opposition: While the Tribunal rejected the Association’s submissions on the facts here, it did not lay down a rule about the quantitative weight required for community opposition to defeat a planning instrument. How strong community opposition must be to influence a tribunal's discretion in different factual matrices remains a practical question.
Interaction with SPP 3 in marginal cases: The Tribunal accepted that SPP 3 was consistent with directing growth to existing towns and that the subdivisions were consistent with the LPS (paras 28-30). However, where a proposed subdivision's strategic fit with state policy is less clear, the balance between regional/sustainability considerations and local strategy could require further judicial consideration.
Scope of Tribunal's consent approvals post-structure plan adoption: This decision approves subdivisions by consent subject to conditions. The limits of consent approvals where other parties object, or where approvals post-refusal are more contested procedurally, are not exhaustively tested here.
For practitioners, those open questions highlight the need to examine transitional scheme provisions and accrued rights doctrine in detail in other authorities when advising clients in similar circumstances, and to ensure that any post-refusal approvals (structure plans, strategies) are properly adopted and documented prior to seeking Tribunal consent orders.
Catchwords
_
Judgment (10 paragraphs)
[1]
The application for review is allowed.
Subdivision approval is granted to the subdivision plan drawn by Koltasz Smith Town Planning plan no 3091-3-002A, dated 31 July 2006, subject to the conditions in Attachment A.
Each party is to pay its own costs of the proceedings.
[2]
The application for review is allowed.
Subdivision approval is granted to the subdivision plan drawn by Koltasz Smith Town Planning plan no 3091-3-002f, dated 11 October 2007, subject to the conditions in Attachment B.
Each party is to pay its own costs of the proceedings.
[3]
I certify that this and the preceding [49] paragraphs comprise the reasons for decision of the State Administrative Tribunal.
[4]
___________________________________
[5]
No earthworks shall commence until the Local Government has approved detailed engineering plans and specifications of the works required to complete the subdivision. (Local Government)
Those lots not fronting an existing road are to be provided with frontage to a constructed road(s) connected by a constructed road(s) to the local road system and such road(s) being constructed and drained at the applicant's/owner's cost. (Local Government)
The access street is to be widened to 16 metres in accordance with the Foggarthorpe Residential Structure Plan endorsed by the Western Australian Planning Commission on 26 October 2007. (Local Government)
Arrangements are to be made with the Local Government for the upgrading and/or construction of Drummond Street from the western boundary of proposed Lot 1 up to and including the intersection with Telegraph Road. (Local Government)
Suitable arrangements are to be made with the Local Government for the provision of vehicular crossover(s) to service the proposed lots shown on the approved plan of subdivision. (Local Government)
The land is to be graded and stabilised. (Local Government)
The land is to be filled and/or drained at the subdivider's cost, and any easements and /or reserves necessary for the implementation thereof are to be granted free of cost. (Local Government)
Footpaths and dual use paths/cycleways are to be constructed in accordance with the Foggarthorpe Residential Structure Plan endorsed by the Western Australian Planning Commission on 26 October 2007, and more specifically, as depicted in Figure 13 of the Revised Traffic Assessment report which is an addendum to that Structure Plan. (Local Government)
Street corners within the subdivision are to be truncated to the standard truncation of 8.5 metres. (Local Government)
A Foreshore Management Plan is to be prepared and implemented to the satisfaction of the Local Government with advice from the Department of Water. (Local Government)
A drainage and nutrient management plan is to be prepared and implemented to the satisfaction of the Local Government with advice from the Department of Water. (Local Government)
A construction management plan detailing how the risk of erosion will be minimised during site-works is to be prepared and approved prior to the commencement of subdivisional works to the satisfaction of the Local Government with advice from the Department of Water. (Local Government)
[6]
No earthworks shall commence until the Local Government has approved detailed engineering plans and specifications of the works required to complete the subdivision. (Local Government)
Those lots not fronting an existing road are to be provided with frontage to a constructed road(s) connected by a constructed road(s) to the local road system, and such road(s) are to be constructed and drained at the applicant's/owner's cost. (Local Government)
Arrangements are to be made with the Local Government for the upgrading and/or construction of Drummond Street where it directly fronts the proposed subdivision up to the Goomalling-Toodyay Road as a result of the proposed subdivision. (Local Government)
Suitable arrangements are to be made with the Local Government for the provision of vehicular crossover(s) to service the proposed lots shown on the approved plan of subdivision. (Local Government)
Construction of the crossing of Boyagerring Brook is to be completed as part of the initial subdivision works, prior to the first diagram or plan of survey being lodged for approval and approved by the Western Australian Planning Commission. (Local Government)
The proposed reserve(s) shown on the approved plan of subdivision being shown on the Deposited Plan as a "Reserve for Recreation" and vested in the Crown under section 152 of the Planning and Development Act 2005, such land to be ceded free of cost and without any payment of compensation by the Crown. (Local Government)
A Notification pursuant to Section 165 of the Planning and Development Act 2005 is to be placed on the Certificates of Title for the proposed Lots 246-262, 284, 285, 290, 291, 299-371, 498-518 and 531-541 advising of the existence of a hazard or other factor. Notice of this notification is to be included on the Deposited Plan. The notification to state as follows:
[7]
"This lot is situated in the vicinity of the proposed Toodyay Bypass, may in future be affected by noise from this road and is subject to Quiet House Design guidelines as per the Foggarthorpe Residential Structure Plan endorsed by the Western Australian Planning Commission on 26 October 2007." (Local Government)
[8]
Notification pursuant to section 70A of the Transfer of Land Act 1893 (as amended) is to be placed on the Certificates of Title for the proposed lots 204, 205, 208-221, 223-234, 297, 303-305, 377, 378, 434-439, 442-446, 459, and 484-486 advising of the following:
[9]
"Granite outcrops are identified on this lot and may impact on the development of the site."
[10]
The land is to be graded and stabilised. (Local Government)
The land is to be filled and/or drained at the subdivider's cost, and any easements and/or reserves necessary for the implementation thereof are to be granted free of cost. (Local Government)
Footpaths and dual use paths/cycleways are to be constructed in accordance with the Foggarthorpe Residential Structure Plan endorsed by the Western Australian Planning Commission on 26 October 2007, and more specifically, as depicted in Figure 13 of the Revised Traffic Assessment report which is an addendum to that Structure Plan. (Local Government)
Street corners within the subdivision are to be truncated to the standard truncation of 8.5 metres. (Local Government)
A Foreshore Management Plan is to be prepared and implemented to the satisfaction of the Local Government with advice from the Department of Water. (Local Government)
A landscaping plan relating to the planting of street trees and treatment of 10m landscape strip along the proposed bypass and Goomalling-Toodyay Road, and the drainage sites in conjunction with the Foreshore Management Plan, are to be prepared and implemented. (Local Government)
A drainage and nutrient management plan is to be prepared and implemented to the satisfaction of the Local Government with advice from the Department of Water. (Local Government)
A construction management plan detailing how the risk of erosion will be minimised during site-works is to be prepared and approved prior to the commencement of subdivisional works to the satisfaction of the Local Government with advice from the Department of Water. (Local Government)
The construction management plan required by condition 16 is to be implemented to the satisfaction of the Local Government. (Local Government)
The preparation and submission of design guidelines to the Local Government for the area of subdivision in accordance with the Foggarthorpe Residential Structure Plan endorsed by the Western Australian Planning Commission on 26 October 2007. (Local Government)
The applicant is to make arrangements to the satisfaction of the Local Government to ensure that all prospective purchasers of lots within the area are made aware in writing of the need to comply with the design guidelines referred to in Condition 18. (Local Government)
Legislation Cited (3)
Development Act 2005
Administrative Tribunal Act 2004
Land Act 1893
Cases Cited (3)
IRONBRIDGE HOLDINGS PTY LTD and WESTERN AUSTRALIAN PLANNING COMMISSION [2008] WASAT 38 (20 February 2008)
10 On 30 November 2007, I granted leave to the Association to make a written submission in relation to whether the subdivisions should be approved, having regard to cl 3.16.1 of the Shire of Toodyay Town Planning Scheme No 1 (TPS 1), and to Mr Graham to make a written submission in relation to whether the subdivisions should be approved, having regard to the impact on his property - see Ironbridge Holdings Pty Ltd and Western Australian Planning Commission[2007] WASAT 325. I dismissed the applications by the other two residents to make submissions. I required the parties to file and exchange any evidence and submissions in relation to whether the proposed consent orders should be made, and ordered that, subject to any further order, the proceedings shall be determined entirely on the documents in accordance with s 60(2) of the State Administrative Tribunal Act 2004 (WA). At the Commission's suggestion, I subsequently granted leave to the Association to make a further written submission in relation to the then draft Shire of Toodyay Local Planning Scheme No 4 (LPS 4).
16 It is unnecessary in this case to determine whether, notwithstanding its revocation, TPS 1 continues to apply to the site for the purposes of s 138(2) of the PD Act because of an accrued right (cf Western Australian Planning Commission and CPP Pty Ltd[2006] WASAT 379 and Miller and City of Stirling[2007] WASAT 247 at [27] - [47]), as approval of the proposed subdivisions does not conflict with the provisions of either TPS 1 or LPS 4.
AI Analysis
Outcomeappellant
Disposition:
By consent, both applications for review (DR 396 of 2006 and DR 397 of 2006) were allowed. Subdivision approvals were granted to the respective plans subject to the conditions set out in Attachments A and B. Each party to pay its own costs (paras 48-49).
The construction management plan required by condition 12 is to be implemented to the satisfaction of the Local Government. (Local Government)
Design guidelines are to be prepared and submitted to the Local Government for the area of subdivision in accordance with the Foggarthorpe Residential Structure Plan endorsed by the Western Australian Planning Commission on 26 October 2007. (Local Government)
The applicant is to make satisfactory arrangements to the specification of the Local Government to ensure that all prospective purchasers of lots within the area are made aware in writing of the need to comply with the design guidelines referred to in Condition 14. (Local Government)
Street lighting is to be installed on all new subdivisional roads at the subdividers cost. (Local Government)
Suitable arrangements are to be made with Western Power for the provision of underground electricity supply service to the lots shown on the approved plan of subdivision. (Western Power)
The transfer of land as a Crown Reserve, free of cost, to the Western Power Corporation for the provision of electricity supply infrastructure. (Western Power)
Certification from the Water Corporation that arrangements have been made with that body so that connection to a water supply service will be available to the lots proposed by this application. The service is to be consistent with the Water Corporation's policy and planning for the locality and may involve the resolution of land matters and the payment of financial contributions to the satisfaction of the Water Corporation. (Water Corporation)
Certification from the Water Corporation that arrangements have been made with that body so that connection to a sewerage service will be available to the lots proposed by this application, and the service is to be consistent with the Water Corporation's policy and planning for the locality, and may involve the resolution of land matters and the payment of financial contributions to the satisfaction of the Water Corporation. (Water Corporation)
Such easements as may be required by the Water Corporation are to be granted free of cost. (Water Corporation)
Street lighting is to be installed on all new subdivisional roads at the subdividers cost. (Local Government)
Arrangements are to be made to the satisfaction of the Local Government for a contribution towards the upgrading of the pedestrian bridge as a result of the proposed subdivision. (Local Government)
The mitigation measures in the Noise Impact Assessment which is an addendum to the Foggarthorpe Residential Structure Plan endorsed by the Western Australian Planning Commission on 26 October 2007 is to be implemented to the satisfaction of the Local Government with advice from Main Roads WA, and measures to be implemented shall not include noise walls. (Local Government)
The subdivider is to provide a suitably designed student drop off and pick up point adjacent to the south-east boundary of the school site within the existing road reserve to the satisfaction of the Local Government and Department of Education and Training. (Local Government)
Suitable arrangements are to be made with Western Power for the provision of underground electricity supply service to the lots shown on the approved plan of subdivision. (Western Power)
The transfer of land as a Crown Reserve, free of cost to the Western Power Corporation for the provision of electricity supply infrastructure. (Western Power)
26. Certification from the Water Corporation that arrangements have been made with that body so that connection to a water supply service will be available to the lots proposed by this application. The service is to be consistent with the Water Corporation's policy and planning for the locality, and may involve the resolution of land matters and the payment of financial contributions to the satisfaction of the Water Corporation. (Water Corporation)
Certification from the Water Corporation that arrangements have been made with that body so that connection to a sewerage service will be available to the lots proposed by this application, and the service is to be consistent with the Water Corporation's policy and planning for the locality, and may involve the resolution of land matters and the payment of financial contributions to the satisfaction of the Water Corporation. (Water Corporation)
Such easements as may be required by the Water Corporation are to be granted free of cost. (Water Corporation)
The intersection of Goomalling-Toodyay Road and Drummond Street East is to be designed and reconstructed by the applicant to the satisfaction of the Local Government and Main Roads WA. (Main Roads WA) (Local Government)
Arrangements are to be made for a contribution by the applicant to the construction of the upgrading of the Goomalling-Toodyay Road and Stirling Terrace intersection to the satisfaction of the Local Government and Main Roads WA. (Main Roads WA) (Local Government)
The Goomalling-Toodyay Road is to be widened by 10 metres along the full frontage of the land the subject of this application by the applicant/owner ceding the land required to the Crown free of cost for the purpose of widening Goomalling-Toodyay Road reserve. (Main Roads WA)
No direct access is to be permitted from the proposed lots onto the Goomalling-Toodyay Road or the future Toodyay Bypass and all access must be via Drummond Street. (Main Roads WA)