© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
[2011] VCAT 1602
Victorian Civil and Administrative Tribunal
2011-09-28
Original judgment source is linked above.
These plans must be accompanied by a report from an industry accepted performance measurement tool, which details the treatment performance achieved and demonstrates the level of compliance with the Urban Stormwater Best Practice Environmental Management Guidelines, CSIRO 1999.
The water sensitive urban design stormwater treatment system as shown on the endorsed plan must be retained and maintained at all times in accordance with the Urban Stormwater - Best Practice Environmental Management Guidelines, CSIRO 1999, to the satisfaction of the Responsible Authority.
The responsible authority may extend the periods referred to if a request is made in writing before the permit expires, or within three months afterwards.
[1] I have considered all submissions presented by the parties although I do not recite all of the contents in these reasons.
Innovation One Design Group
Bayside CC