The application before me seeks to amend the planning permit to allow subdivision from four lots into three lots. The proposed three lots would range from 40.02 - 40.29 hectares and would all be larger than the 40 hectare minimum allowed in the planning scheme.
Figure 1 shows the four lots making up the subject land. Figure 2 shows the approved two lot subdivision, and figure 3, the proposed three lot subdivision.
Application under section 77 of the Planning and Environment Act 1987 (Vic) - to review the refusal to amend a planning permit under
Clause 52.17-2 (Native vegetation) - to remove, destroy or lop native vegetation, including dead native vegetation
Clause 52.02 (Easements, Restrictions and Reserves) - to create an easement
The subject land is about 5 kilometres northeast of Romsey. As shown in figure 1 within the blue dotted line it comprises four lots totalling 121.4 hectares.
Most of the subject land is heavily wooded with native vegetation with some cleared areas used for grazing on the western edge. The subject land is hilly and contains relatively steep slopes in some areas and stands in stark contrast to the relatively flatter area between Romsey and Lancefield. Figure 4 shows a perspective of the site from Mr Glossop's evidence.
A single dwelling of 1970's-1980's vintage exists on the subject land as marked on figure 1 along with some shedding and dams. The dwelling would be contained within the new Lot 1.
Figure 3 Proposed three lot subdivision and easement
IS THE AMENDED SUBDIVISION AN ACCEPTABLE PLANNING OUTCOME WHEN CONSIDERING RELEVANT PLANNING CONTROLS AND POLICY?
The FZ also includes extensive decision guidelines for use and development. Many of these require the decision maker to consider issues around loss of agricultural land or curtailment of agriculture on adjacent agricultural land from offsite amenity impacts on accommodation and dwellings. The decision guidelines also require consideration of the specific agricultural qualities of the land including 'soil quality, access to water and access to rural infrastructure'. The potential for a proposal to lead to a 'concentration or proliferation of dwellings in the area' and how this might affect surrounding agriculture also needs to be considered.[4]
The property has considerable slope with moderately steep terrain, and from the information provided, doesn't appear to be generating any significant level of agricultural output. Uses for the site in its current form are limited to low levels of grazing, being sheep or beef cattle. The site does not appear to be suited to any form of agricultural production other than low intensity grazing.
The site, when reviewed from satellite mapping or viewing technology, contains significant areas of vegetation, gullies, steep gradients and fragile waterways and waterholes/soaks/springs. This limits the productivity possible on the site without causing a degree of environmental damage or impact. In my opinion, this should be a consideration for how this property is viewed from a local land-use and agricultural significance perspective.[5]

IS THE NATIVE VEGETATION REMOVAL PROPOSED ACCEPTABLE?
Figure 6 Southern native vegetation impact area[9]
The Applicant is willing to define the boundary between lots 2 and 3 in a manner that ensures that the 10 trees assumed to be lost will be retained. This would mean that the extent of vegetation loss associated with boundary fencing is known and accounted for and there will not be consequential tree loss associated with fencing.
A permit is required to remove, destroy or lop native vegetation, including dead native vegetation.
Clause 52.02 (Easements, Restrictions and Reserves)
(a) A plan showing the building envelopes for Lot 1, Lot 2 and Lot 3 generally in accordance with the 'Domestic Zones' shown on Map 2, Map 3 and Map 4 in the Bushfire Hazard Site Assessment Plan (pages 23, 24 and 25) prepared by Nexus Planning dated 11 March 2024 modified to show dimensions and setbacks for each building envelope from at least two lot boundaries.
(a) Stipulate that no buildings and works (except driveways, fencing and effluent areas) may be erected outside the approved building envelopes unless with the further written consent of the Responsible Authority.
(b) Provide for all dwellings on the subdivided lots to be fitted with a wastewater treatment and disposal system to a design approved by Council's Environmental Health Officer and such that all effluent is disposed of within the boundaries of the allotment. A separate permit must be obtained from Council's Environmental Health Department prior to its installation.
(c) Provide for the Land Management Plan prepared by Ranges Environmental dated December 2023 to be approved and endorsed by the Responsible Authority and implemented to the satisfaction of the Responsible Authority.
(d) State that it has been prepared for the purpose of an exemption from a planning permit under Clause 44.06-2 of the Macedon Ranges Planning Scheme.
(e) Incorporate the plan prepared in accordance with Clause 53.02-4.4 of this planning scheme and approved under this permit.
(f) State that if a dwelling is constructed on the land without a planning permit that the bushfire protection measures set out in the plan incorporated into the agreement must be implemented and maintained to the satisfaction of the responsible authority on a continuing basis.
The landowner must pay the Responsible Authority's reasonable costs of the preparation, execution and registration of the Section 173 Agreement.
(a) A general offset of 0.396 general habitat units and eight large trees;
(b) Located within the North Central Catchment Management Authority (CMA) or Macedon Ranges Shire Council municipal district; and
(c) With a minimum Strategic Biodiversity Value score of at least 0.4329.
(a) Credit extract(s) allocated to the permit from the Native Vegetation Credit Register, and/or
(b) An established first party offset site including a security agreement to the required standard, signed by both parties, and a 10-year offset management plan to the satisfaction of the Department of Energy, Environment and Climate Action and approved by the Responsible Authority. The offset management plan must detail the 10-year management actions and ongoing management of the site. Every year, for 10 years, after the responsible authority has approved the offset management plan, the applicant must provide notification of the management actions undertaken towards implementing the offset management plan to the responsible authority. An offset site condition statement, including photographs must be included in this notification.
Note: Where electrical works are required to achieve VSIR compliance, a registered electrical contractor must be engaged to undertake such works.
Existing easements may need to be amended to meet the Distributor's requirements.
Easements required by the Distributor shall be specified on the subdivision and show the Purpose, Origin and the In Favour of party as follows:

(a) The plan of subdivision is not certified within two years of the date of this permit.
(b) The plan of subdivision is not registered at Land Registry within five years of the certification of the subdivision.
(c) The removal, destruction or lopping of native vegetation does not start within two years of the date of this permit
(d) The removal, destruction or lopping of native vegetation is not completed within ten years of the date of this permit.
In accordance with Section 69 of the Planning and Environment Act 1987 an application may be submitted to the Responsible authority for an extension of the period referred to in (a) of this Planning Permit condition.
[1] A memorandum on the agricultural quality of the land was provided from Matt Harms of Onfarm Consulting but Mr Harms was not called to give evidence.
[2] The Tribunal's decision considers submissions, evidence, supporting hearing exhibits and the statements of grounds. Not all of this material will be referred to in these reasons.
[3] I note and accept the position in the Estate of JE Walker v Wangaratta RCC [2021] VCAT 1257 that this is a 'condition precedent' rather than a reason itself to approve the subdivision.
[5] In the delegate report for the two-lot subdivision council acknowledged that the 'site is somewhat limited in terms of agricultural activity due to the presence of extensive native vegetation; the presence of numerous waterways and the steep, undulating terrain.'
[6] For example, in cl 02.03-2, cl 12.01 and cl 12.05.
[7] Phillips v Wodonga CC [2023] VCAT 1014.
[8] And subject to other considerations such as bushfire and onsite wastewater disposal.
[9] Black crosses showing large trees potentially impacted.
[10] I note the letter dated 12 April 2024 refers to a Mount Alexander Shire. I assume this is a simple clerical error as the property address in the correspondence is correct.
Inca Farms Pty Ltd