(a) A large Italianate mansion of heritage significance divided into four dwellings across two levels; and
(b) An apartment building to the front and side of the mansion constructed in the 1960's comprising eight dwellings undergoing internal renovation.
(a) Naming the Fire Resue Commissioner as an Interested Party to the Proceeding;
(b) Requiring the Applicant to file with the BAB and serve on the Interested Party his Statement of Contentions by 11 July 2025;
(c) Requiring the Interested Party to file and serve his Statement of Contentions (if any) in support of or in opposition to the Applicant's application by 25 July 2025; and
(d) Listing the proceeding for hearing on 12 August 2025.
(a) Consultant's Advice Notice dated 15 April 2025;
(b) Gincat Fire Engineering Report dated 15 April 2025 (FER 1.2);
(c) Email from the Applicant to the BAB dated 5 June 2025 stating that -
I am seeking a Determination that under the Building Act Section 160A(1) Part (1) that -
(1) does not fall within the defined usage as residential care; and
(2) Does not fall within the defined usage as shared accommodation; and
(d) GinCat Fire Engineering Report dated 27 June 2025 (FER 1.3);
(e) Email from Applicant to the BAB dated 18 July 2025 listing Matters Seeking a Determination from the Building Appeals Board.
Building Code of Australia 2019, Volume One (BCA)




THE APPLICANT'S STATEMENT OF CONTENTIONS (IN SUMMARY)
(a) each Performance Requirement with respect to the relevant DtS Provision, Variations from DtS Provisions, the BCA A2.2 Assessment Method and his Comments;
(b) the design measures required by FER 1.3;
(c) the Type of Protection Prescribed for Openings in External Walls
(d) Definition of Type of Protection Method; and(e) Description of the building(s) per BCA 2019 Volume 1 Amendment 1.
THE INTERESTED PARTY'S STATEMENT OF CONTENTIONS (IN SUMMARY)
(a) The design group should consider if sprinkler protection is an appropriate response to the occupants of a Class 3 building;
(b) Whether the proposed controls of placarding and management of the site to limit the number of unrelated persons in the building are appropriate, or if further controls are required, should be considered;
(c) Hydrant coverage drawn directly from three external hydrants located around the ground floor of the building may be non-compliant;
(d) No booster assembly is shown on the drawings provided;
(e) With no booster assembly installed, the hydrants are classified as feed hydrants and coverage can only be drawn from an appliance within 20 metres, which may not provide sufficient coverage to the rear building;
(f) The hydrant in front of the rear building is a ground ball hydrant and is only appropriate as a feed hydrant within 20 metres of a hardstand; not an attack hydrant;
(g) The change of use requires the building to be assessed against the appropriate standard referenced by NCC 2019 Amendment 1, AS2419.1:2005, and any non-compliance identified made known to the Commissioner; and
(h) Given how recent the architectural drawings and PBDB/FER were produced, it may be more appropriate to assess the change of use against NCC2022 and the hydrant system against AS2419.1:2021.
THE APPLICANT'S REPLY TO THE INTERESTED PARTY'S STATEMENT OF CONTENTIONS (IN SUMMARY)
(a) There are no more external hydrants as part of the new internal hydrant design system;
(b) Hydrant coverage assessment based on the new system design is shown in RC Fire Consulting Fire Hydrant System Design Drenchers and Booster Details Drawing No. LH02(2);
(c) New booster assembly is added to the new design as shown in Drawing No. LH01(4);
(d) All original hydrant system equipment and pipework will not be part of the new system to NCC2019 Amendment 1 and AS2419.1-2005 and;