austlii:vic/VBAB/2025/55
General information, not legal advice.
VBAB
2025-04-15
Members J, Member J
Original judgment source is linked above.
Determination in Respect of Building Design - An application made under s 160A of the Building Act 1993 for a determination that the design of the roof drainage system for the Unit -1 (Class 1a), wherein, the sump overflow from the box gutter system discharging into a 'faux' rainhead and the spreaders discharging storm water from upper roof on to the lower tiled roof that has not been provided with a sarking medium underneath the roof tiles complies with the Performance Requirements P2.2.1 and P2.2.2 of the ().
Determination in Respect of Building Design - An application made under s 160A of the Building Act 1993 for a determination that the design of the roof drainage system for the Unit - 2 (Class 1a), wherein, the sump overflow from the box gutter system discharging into a 'faux' rainhead and the spreaders discharging storm water from upper roof on to the lower tiled roof that has not been provided with a sarking medium underneath the roof tiles, and also the rainhead installed at the front and rear of the garage including the downpipes complies with the Performance Requirements P2.2.1 and P2.2.2 of the BCA.
APPLICANTS Jefta Ongkodiputra and Kumala Sumarni (Subject Land owners)
INTERESTED PARTY Castle Kane Group Building Surveyors Pty Ltd (ACN 634 101 063) (relevant building surveyor)
BEFORE Members J Shaw (panel chair) and L Varveris, B Williams
CITATION In the matter of 15 Jessup Close, Mulgrave [2025] VBAB 55
Having considered all the submissions and information placed before it, and having regard to the Performance Requirements P2.2.1 and P2.2.2 of the Building Code of Australia 2019 - Volume Two (BCA), pursuant to s 161 of the Building Act 1993, the Building Appeals Board determines that:
_______________________ ________________________
APPEARANCES AT THE E-HEARING DATED 8 NOVEMBER 2024
For the Interested Party Mr S Maloney, representative
APPEARANCES AT THE E-HEARING DATED 4 MARCH 2025
For the Interested Party Mr S Maloney, representative
a) Proceeding 455800, which is an appeal made under s 138(1)(a) of the Building Act 1993 (Act) against the refusal or deemed refusal of the RBS to issue an occupancy permit in respect of the Building Work; > > b) Proceeding 455998, which concerns two applications, one for each unit, made under s 160A of the Act for a determination that a plumbing performance solution in respect of the roof drainage systems for each Unit complies with the Performance Requirements P2.2.1 and P2.2.2 of the BCA; and > > c) Proceeding 456378, which concern two applications, one for each Unit, made under s 160(2)(b) of the Act to modify Performance Requirements P2.2.1 and P2.2.2 of the BCA to allow the as-constructed roof drainage systems to remain instead of requiring the construction of the roof drainage systems indicated on the drawings forming part of the building permit for the Building Work.
a) the spreader behind the entrance roof should not be installed to discharge above the vertical overflow, and in addition access should be provided for maintenance; > > b) the other end of the gutter should discharge adjacent to the tiles, and the current tiles need to be removed and replaced with a suitable small gutter more than 100mm wide and 40mm deep that discharges to the eaves gutter; > > c) the flexible flashing material installed and placed over the base of the gutter needs to be removed; and > > d) liquid rubber, or a suitable alternative, needs to be applied to the bottom of the tile ride capping in order to waterproof the connection of the roofing and gutter components.