Review of a decision to grant a planning permit. Section 77 of the Planning & Environment Act 1987. Horsham Planning Scheme. Farming Zone. Waste disposal. By-products from processing of heavy mineral sands concentrate. Naturally occurring radioactive material (NORM). Burial of NORM in former mine pit. Burial of chemically inert waste contaminated with NORM in pit. Risks of contamination, pollution and environmental hazard considered. Future use of land considered. Impact to future impacts on agriculture on surrounding land. Groundwater impacts. Groundwater dependant waterways and ecosystems impacts considered. Dust impacts. Radon gas impacts. Human health impacts from NORM considered.
Keith Fischer, Southern Grampians Shire Council, Kangagulk Landcare Group Inc, Albert & Barbara Miller
Secretary to the Department of Economic Development, Jobs, Transport and Resources, Environment Protection Authority,
Secretary to the Department of Health and Human Services
CA 91(Vol:10234, Fol: 134) Jaspers Lane; CA 94(Vol:10325, Fol:229); CA 95 (Vol:10325, Fol:230); CA 96 (Vol:10325 Fol:231) Elliotts Road
7, 8, 9, 14, 15, 16, 17, 18, 23, 24 and 25 November 2016
Iluka Resources Limited v Horsham Rural CC (Amended) [2017] VCAT 107
Mr Henry Jackson of counsel, instructed by Herbert Smith Freehills
For Secretary to the Department of Economic Development, Jobs, Transport and Resources
Mr Peter Willis SC, instructed by Victorian Government Solicitors Office.
For Secretary to the Department of Health and Human Services
Mr Michael McCarthy, Director Shire Futures, Southern Grampians Shire Council and Keven Johnson of Geographia
Statutory declarations were also submitted on behalf of:
The disposal of waste by-products associated with or sourced through mineral sands processing undertaken by at the Hamilton Mineral Separation Plant (MSP), including waste by-products and contaminated materials resulting from processing and transport operations, including:
Application under section 77 of the Planning and Environment Act 1987 - to review the refusal to grant a permit.
Clause 35.07-4 - construct or carry out works for a section 2 use
Clauses 10, 12, 13, 14, 19, 21, 22.01 and 22.02 of the State and Local Planning Policy Frameworks and Clause 65.
The subject land comprises four crown allotments, which are part of the Douglas Mine site located approximately 58 kilometres south west of Horsham with access off Elliots Road. The land includes Pit 23, which currently exists as a mining void that is proposed to be filled by this proposal; access and haul roads; a truck wash facility; and existing offices, ablution facilities and car parks. Mining has now ceased at the Douglas Mine site, which is in the process of being rehabilitated. Where previously mined land has been rehabilitated, it is being used for agricultural purposes.
Agriculture is the predominant land use within the locality, generally dry land agriculture comprising sheep grazing on large rural holdings. Immediately north of the site across Elliots Road is a nature reserve.
The site is relatively flat (except for the mining pits) with some low hills forming minor variations in topography. Generally, the surface level of the site slopes gently to the north and east. The Douglas Depression (a landform sunken or depressed below the surrounding area) runs north to south to the northwest of the site and contains a series of brackish to hyper-saline lakes at relatively low elevations. An additional saline lake is located on the north-eastern boundary of the site, approximately 1400 metres from Pit 23. The Lake Kanagulk Nature Reserve is approximately 4.5 km to the northeast of the site and the Glenelg River runs east-west 5 km south of the site.
The Douglas Mine is located on the West Wimmera Plain on the southern edge of the Murray Basin, which contains a succession of freshwater, marine, coastal and continental sediments deposited from the southwest. Groundwater at and around the site forms the southern extent of the Murray groundwater basin. Rainfall predominately infiltrates directly into the closed aquifer of the Murray Basin with surface drainage entering a number of topographically defined dams on the site and the large saline lake at the site boundary. Regional surface drainage has rainfall discharging into the lakes of the Douglas Depression and the Glenelg River.
The review site is generally devoid of remnant native vegetation apart from some scattered trees across the site and adjacent to Elliots Back Lane and Elliots Road to the west of Pit 23. The land immediately north of Pit 23, beyond the application site boundary, is native vegetation broadly classified as grassy eucalypt woodland, which is contained within the Public Conservation and Resource Zone (PCRZ). Since closure of the Douglas Mine in 2012, natural grasses are returning across the areas of the adjacent pits which have undergone revegetation.
The Tribunal undertook an accompanied site inspection of the Douglas Mine site and other surrounding areas, and the Hamilton Mineral Separation Plant in Hamilton on 10 November 2016.
Australian Radiation Protection and Nuclear Safety Agency
Near Surface Disposal of Radioactive Waste as in ARPANSA technical report 141 'Scientific Basis for the Near Surface Disposal of Bulk Radioactive Wastes' (2005)
An alteration to the environment that can be harmful, beneficial or neutral. Contamination does not always mean 'pollution' has occurred.
Department of Economic Development, Jobs, Transport and Resources
A state of danger to human beings or the environment, whether imminent or otherwise resulting from the location, storage or handling of any substance having toxic, corrosive, flammable, explosive, infectious or otherwise dangerous characteristics.
Earth Resources Regulation, part of the Department of Economic Development, Transport, Jobs and the Resources
Note: NORM is common in rocks and soils, in water and oceans, and found in building materials. Radiation is also present within the human body as humans ingest and inhale radio-nuclides in food, water and air.
An alteration of chemical state of the environment, which is detrimental to the beneficial uses of that environment.
Radiation can be described as energy or particles that travel through space or other mediums. Light, heat, microwaves and wireless communications are all forms of radiation.
Figure1: Site Layout in relation to the subject land (extracted from Figure 6 Site Plan of the Planning Assessment Report Appendix 5,1A)
(1) The proposal should continue to be regulated pursuant to mining licence under the Mineral Resources (Sustainable Development) Act 1990 (MRSDA). Council does not support the excision of Pit 23 from the mining licence if the permit is granted. Disposal of Heavy Mineral Concentrate should continue to be regulated under the rehabilitation arrangements in force under the MRSDA.
(2) The proposal gives rise to a major question of policy concerning the location of regional disposal sites for radioactive wastes generated by mineral sand mining that should be determined by the Governor in Council.
Society has various needs and expectations such as land for settlement, protection of the environment, economic well-being, various social needs, proper management of resources and infrastructure. Planning aims to meet these by addressing aspects of economic, environmental and social well-being affected by land use and development.
Planning authorities and responsible authorities should endeavour to integrate the range of policies relevant to the issues to be determined and balance conflicting objectives in favour of net community benefit and sustainable development for the benefit of present and future generations.
Consistent with the objectives of local government under the Local Government Act 1989, municipal planning authorities are required to identify the potential for regional impacts in their decision-making and co-ordinate strategic planning with their neighbours and other public bodies to achieve sustainable development and effective and efficient use of resources.
Permissions required for mining and waste disposal at Douglas Mine
Table 1 - Permissions required where land used for mining and waste disposal
Table 2 - Permissions required where land used for waste disposal after mining has ceased
(1) The holder of a mining licence is, subject to section 42(1), entitled to carry out mining on the land covered by the licence and -
(b) to construct any facilities specified in the licence, including drives, roads, water races, tailing dumps, tailing dams, drains, dams, reservoirs and pipe-lines; and
(c) to do anything else that is incidental to that mining.
(1) The authority holder must rehabilitate land in the course of doing work under the authority and must, as far as practicable, complete the rehabilitation of the land before the authority or any renewed authority ceases to apply to that land.
(2) If the rehabilitation has not been completed before the authority or renewed authority ceases to apply to the land the former authority holder must complete it as expeditiously as possible.
Land used for the exploration, removal or processing of natural earth or energy resources. It includes any activity incidental to this purpose including the construction and use of temporary accommodation.
Land used for extraction of minerals in accordance with the Mineral Resources (Sustainable Development) Act 1990.
Mining means extracting minerals from land for the purpose of producing them commercially, and includes processing and treating ore;
(a) The permit should be expressed not to enter into force until completion of various consequential steps, including the steps next set out.
(b) Iluka would apply to the Department Head to vary the Work Plan with respect to Pit 23. The variation would be to identify a new end utilisation for Pit 23 and to vary the rehabilitation plan with respect to Pit 23 accordingly.
(c) Iluka would apply to the Minister to surrender part of mining licence 5367 (Pit 23), to take effect immediately following registration of the work plan variation.
(d) The Department and Minister would consult other agencies and departments as necessary. (As no new 'work' is proposed under the Work Plan Variation, section 42A of the MRSDA is not engaged - see further below).
(e) Upon the Department Head being satisfied that Iluka had obtained a planning permit approving the use of Pit 23 for the disposal of waste by-products as specified in the permit and otherwise on terms and conditions to the satisfaction of the Department Head (i.e. as approved by the Tribunal), a Work Plan Variation would be approved under which the mining licence rehabilitation plan would be amended to state that rehabilitation of Pit 23 is taken to be completed for the purposes of the MRSDA immediately before, or concurrently with, the planning permit coming into force.
(f) The Minister would consent to the partial surrender of mining licence 5367.
(g) On the same day (or successive days), (i) the Work Plan Variation is approved (MRSDA section 41AAB(3)) and the partial surrender of mining licence 5367 is registered (MRSDA section 37(3)); and (ii) the planning permit becomes operational (assuming any other conditions precedent have been satisfied).
EPA has investigated whether the current and proposed radioactive material disposals into Pit 23 has or is causing or is likely to cause pollution or environmental hazard. If there is no pollution or hazard, the EP Act does not apply.
EPA has considered all possible pathways that pollution or hazards could arise from Pit 23, and also commissioned an independent desktop reviewer to conduct a technical review of potential groundwater and surface water impacts. To assess the potential human health and environmental impacts of radioactive materials, EPA consulted with the Department of Health and Human Services (DHHS), which is responsible for regulating radioactive materials and associated risks to human health and the environment.
EPA has not found any evidence to show that a condition of pollution or environmental hazard has arisen or is likely to arise from Iluka's proposal. Accordingly, the EP Act does not apply to the proposed disposal activities and Iluka does not require a works approval or a licence from EPA for it to continue its disposal activities into Pit 23.
(1) Notwithstanding anything to the contrary in this Act, where -
(d) any industrial waste or potentially hazardous substance appears to have been abandoned or dumped; or
(e) any industrial waste or potentially hazardous substance is being handled in a manner which is likely to cause an environmental hazard -
the Authority may conduct a clean up or cause a clean up to be conducted as the Authority considers necessary.
To implement the State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement and local planning policies.
To provide for the use of land for agriculture and to encourage the retention of productive agricultural land.
To ensure that non-agricultural uses, including dwellings, do not adversely affect the use of land for agriculture.
To encourage the retention of employment and population to support rural communities.
To encourage use and development of land based on comprehensive and sustainable land management practices and infrastructure provision.
Agricultural issues and the impacts from non-agricultural uses
Is the use contrary to waste management policy?
The issues raised by Kanagulk Landcare Group and other landholders
Overview of our considerations of these issues
The chemical and toxicological nature of the by-products
Groundwater conditions and the risks to beneficial uses
Changes to groundwater flow and discharges to surface water systems
Further considerations about future groundwater levels and surface water interactions
The potential for migration of contaminants to the northern drainage line
The DHHS and Southern Radiation Services risk assessments
The properties and behaviour of radon gas and other radioactive elements
ESTIMATION OF THE DOSE FROM RADIONUCLIDES IN WATER
To estimate the equivalent dose to members of the public from the ingestion of radionuclides in drinking water, the parameters required are the concentration of the radionuclides in water (measured in Bq/L), the daily consumption rate of water (L/day), and the dose conversion factor for the particular radionuclide.
The World Health Organization (WHO) has estimated that adults consume an average of 2 L of water per day, and this figure is believed to be an appropriate average figure for Australia, giving an annual consumption of 730 L for each adult Australian. Therefore, the amount of each radionuclide ingested per year from the water supply is the concentration of that radionuclide in the water (Bq/L) multiplied by 730.
The annual dose from an individual radionuclide consumed in water is calculated using the following equation:
Annual dose (mSv/year) = dose per unit intake (mSv/Bq) x annual water consumption (litre/year) x radionuclide concentration (Bq/L)
Usually, a water supply contains more than one radionuclide; therefore, the doses arising from each individual radionuclide must be summed to give the total dose.
Radiation risks to land, vegetation and agriculture
The application of ARPANSA and other guidelines
This Code [i.e. Code of practice for the near-surface disposal of radioactive waste in Australia (1992)] has been withdrawn as the material is covered by the relevant Trusted International Standard: IAEA Safety Standards Series No. SSR-5: Disposal of Radioactive Waste.
Is agricultural land use of Pit 23 precluded?
Environmental hazard means a state of danger to human beings or the environment whether imminent or otherwise resulting from the location, storage or handling of any substance having toxic, corrosive, flammable, explosive, infectious or otherwise dangerous characteristics;
CA 91(Vol:10234, Fol: 134); CA 94(Vol:10325, Fol:229); CA 95 (Vol:10325, Fol:230); CA 96 (Vol:10325 Fol:231) Elliots Road, Kanagulk
The permit comes into operation on the same day the Work Plan Variation is approved, and the partial surrender of MIN 5367 is registered.
Use must comply with Environment Management Plan
[2] See also section 14 MRSDA
Land used to dispose of refuse, by landfill, incineration, or other means.
[4] The Tribunal's order dated 25 August 2016 amended the permit application to include all additional documents forming part of the works approval application to the EPA with one exception (order 27).
[5] Ileowl Pty Ltd v Wodonga CC (Amended) [2016] VCAT 945
[6]7 The IAE requires the signatories that include the State of Victoria to amongst other matters implement and apply principles of environmental policy that include the pre-cautionary principle and intergenerational equity and conservation of biological diversity and ecological integrity. These are principles that are embodied in various means in the EP Act, MRSDA, Radiation Act and PE Act and subordinate regulations and policies such as the SEPPs.
[9] The matters in italics are most relevant to the current matter.
[11] P7 Commitment 8 i): Douglas Heavy Minerals Project: Stage 1. West Wimmera, Victoria. EES. Basin Mineral Holdings NL
[12] Waste Management Policy (Siting, Design and Management of Landfills), December 2004.
[13] Identified and referred to at paragraph 155 of the council's submissions, ExhibitRA-5
[14] EPA Publication 788.3, August 2015.
[15] The mineral sands from the Jacinth-Ambrosia mine are contained in coastal and alluvial deposits formed in the Tertiary period within the Eucla Basin. The Victorian deposits are coastal and alluvial deposits formed in the same geological epoch within the Murray Basin.
[16] EPA Publication 448 Classification of Wastes (Publication 448.3, May 2007) (Exhibit KLG 66) and Industrial Waste Resource Guidelines (IWRG), Publication IWRG621, June 2009.
[17] Publication 448.3, May 2007 and Publication IWRG621, June 2009, Figure 1: Decision flow chart for waste soil.
[18] DHHS at [16]: The mineral separation process produces by-products of sand, clay and gypsum, and it is these by-products that contain chemically inert material including naturally occurring radioactive material (NORMs) that are disposed of at Pit 23.
[19] Our focus here is on the mineral sand by products. We recognise that the filter bags and possible inclusion of waste steel and concrete constitute materials, which if not for these being contaminated with NORMs would otherwise be solid inert wastes that pose little risk to the environment. We understand that the focus of issues about pollution and environmental hazard by the council is not in relation to these materials.
[20] Tabs 8 through to 36 of further information provided to council - By-product characterisation analysis. Contained in Attachment C of the permit application materials.
[21] Movement by hydraulically driven (mass) water flow as opposed to physical or chemical dispersion.
[22] These reports are contained in the Response to Supply Further Information - Hydrogeological and Groundwater Related Matters in support of the Iluka Works Approval Application: Supplied to the council on 25 February 2016, Volume C, Tab 62.
[23] The Jacobs Groundwater Impact Assessment, 2014.
[24] Rocklands-Toolondo Channel Seepage in the Telangatuk East Area, Sinclair Knight Merz Pty Ltd, September 1995
[25] Set out in section 8 of the report 'Douglas Mine Site Hydrogeological Modelling', 6 November 2014, CDM Smith Australia Pty Ltd, contained in the Experts Report Volume 2 that accompanied the works approval and planning permit applications.
[26] Groundwater Chemistry Baseline Review, Jacobs 2016, section 5.
[29] Appendix D of the Jacobs 2014 assessment.
[30] Sulphate as selected as it is a primary constituent of gypsum.
[31] Paragraphs 26 to 28 of the DHHS submissions; DHHS-21.
[32] Radiation Protection Series No 9: ARPANSA August 2005.
[33] Technical report 141: ARPANSA Victoria; August 2005
[34] International Atomic Energy Agency, IAEA Safety Standards Series, Specific Safety Requirements No 5, Vienna, 2011
[35] Dose limits are prescribed in Schedule 2 of the Radiation Regulations, 2007.
[36] Thirteenth Beach Coast Watch Inc v The Environment Protection Authority & Anor [2009] VSC 53, [13].
[37] Thoron has an emanation co-efficient that is an order of magnitude less than the Ra222 radon from monazite and is not emitted from zircon: See Appendix 13 of DHHS Assessment.
[38] Appendix B of the Jacobs 2014 assessment and laboratory reports included in the application material.
[39] Appendix B, Table B.1 of the 2014 Jacobs report.
[40] Secular equilibrium is achieved when sufficient time has elapsed in stable deposits such that the activity levels of daughter products has built up to match the activity of the parent isotope. Such is the case with the ore bodies which Iluka sources its ores from.
[41] See Appendices 3, 4, 5 and 13 of the DHHS Assessment report.
[42] the major mineral sources of radon in the ore bodies
[43] The non-conductor magnetic by-product stream.
[44] Attachment 9 of Mr Wain's evidence statement DHHS 22.
[45] Attachment 11 of Mr Wain's evidence statement DHHS 22.
[46] This being the residence of Chadwick.
[47] Result 2, page 65 of attachment 7 to Mr Wain's evidence statement, DHHS 22.
[48] Page 14 of attachment C to Mr Johnson's evidence statement, A-31.
[49] Table 5 at page 14 of attachment C to Mr Robertson's evidence statement, A-31.
[50] Attachment 9 to Mr Wain's evidence statement, DHHS 22.
[51] The assessments each assume that the adopted dust load is of a respirable size, i.e. a size of 1 micron or less Activity Median Aerodynamic Diameter (AMAD).
[52] NHMRC, NRMMC (2011) Australian Drinking Water Guidelines Paper 6 National Water Quality Management Strategy. National Health and Medical Research Council, National Resource Management Ministerial Council, Commonwealth of Australia, Canberra, section 7.6.2, page 97
[56] J Shtangeeva Uptake of uranium and thorium by native and cultivated plants Journal of Environmental Radioactivity 101 (2010) 458-463.
[57] Page 15 of Mr Wain's statement of evidence: DHHS-22.