[2004] VSCA 99
Court of Appeal (Vic)
2004-06-03
BUCHANAN, J.A. and COLDREY and MORRIS, A.JJ.A.
Original judgment source is linked above.
[ 2004] VSCA 99
Telecommunications facility - Clause 52.19-2 of the Port Phillip Planning Scheme - Characterisation of antennas, poles, cabling and equipment under the scheme - Telecommunications (Low-impact Facilities) Determination 1997 - Characterisation of antennas, poles, cabling and equipment under the determination.
(a) six panel antennas on the roof of the building (with each antenna being mounted on a supporting pole);
(b) one parabolic antenna on the roof of the building (with this antenna also being mounted on a supporting pole);
(c) supporting equipment for the appellant's network, and a separating wall, within the existing plant room on the roof of the building; and
(d) cables connecting the supporting equipment and the seven antennas (the cables being covered by cable trays that are fixed to the parapet on the roof of the building).
(a) that the equipment did constitute "low impact facilities";
(b) that some of the equipment was ancillary to low impact facilities;
(c) that some of the equipment constituted buildings and works associated with low impact facilities (for the purposes of cl. 52.19-2 of the scheme); and
(d) that some of the equipment was described in "A Code of Practice for Telecommunications Facilities in Victoria" and complied with that code.
"A The proposal by Hutchison 3G Australia Pty Ltd for a telecommunications facility which includes various ancillary components [at the subject building] is a low impact facility as described in the Telecommunications (Low-Impact Facilities) Determination 1997. B The proposal by Hutchison 3G Australia Pty Ltd for a telecommunications facility which includes various ancillary components [at the subject building] does not require a planning permit under the Port Phillip Planning Scheme."
"Land used to accommodate any part of the infrastructure of a Telecommunications network. It includes any telecommunications line, equipment, apparatus, telecommunications tower, mast, antenna, tunnel, duct, hole, pit, pole, or other structure or thing used, or for use in or in connection with a Telecommunications network."
It was common ground that all of the equipment installed by the appellant was a telecommunications facility within the meaning of this land use term.
"A permit is required to construct a building or construct or carry out works for a Telecommunications facility.
* A low-impact facility as described in the Telecommunications (Low-impact) Facilities Determination 1997.
* The inspection and maintenance of a Telecommunications facility as defined in the Telecommunications Act 1997 (Cwth).
* A facility authorised by a Facilities Installation Permit issued under the Telecommunications Act 1997 (Cwth).
* The connection of a building, structure, caravan or mobile home to a Telecommunications line forming part of a Telecommunications network.
* Any Telecommunications facility described in A Code of Practice for Telecommunications Facilities in Victoria which complies with the requirements of the code.
* Buildings and works associated with activities which are:
* Authorised under Clause 6(2) of Division 3 of Schedule 3 of the Telecommunications Act 1997 (Cwth).
* Carried out by bodies listed in Sections 46 to 51 (inclusive) of the Telecommunications Act 1997 (Cwth) pursuant to legislation applying to those bodies."
"If subclause (1) authorises a carrier to carry out a particular activity, the carrier may, for purposes in connection with the carrying out of that activity:
(a) enter on, and occupy any land; and
(b) on, over or under the land, do anything necessary or desirable for those purposes, including, for example:
(i) constructing, erecting and placing any plant, machinery, equipment and goods;"
"(1) A facility described in column 2 of an item in the Schedule is a low-impact facility only if it is installed, or to be installed, in an area mentioned in column 3 of the item. (2) However, the facility is not a low-impact facility if the area is also an area of environmental significance. (3) For subsection (1), trivial variations for a facility mentioned in column 2 are to be disregarded. (4) A facility that is ancillary to a facility covered by subsection (1) is also a low-impact facility only if it is installed, or to be installed, solely to ensure the protection or safety of: (a) the low-impact facility; or (b) persons or property in close proximity to the low-impact facility."
Part 1 - Radio Facilities
(b) if the antenna is attached to a structure - protruding from the structure by not more than 3 metres; and
(ii) in a colour agreed in writing between the carrier and the relevant local authority
An omnidirectional antenna or an array of omnidirectional antennas:
(c) if the array is attached to a structure - protruding from the structure by not more than 2 metres
(ii) in a colour agreed in writing between the carrier and the relevant local government authority; and
(c) if attached to a supporting structure, the total protrusion from the structure is not more than 2 metres
Part 3 - Above Ground Housing
(a) used solely to house equipment used to assist in providing a service by means of a facility mentioned in Part 1; and
(c) with a base area of not more than 7.5 square metres; and
(ii) in a colour agreed in writing between the carrier and the relevant local authority
Part 7 - Co-Located Facilities
(b) item 3 of Part 4;
(b) item 3 of Part 4;
(e) the total volume of the co-located facilities is no more than 25 per cent greater than the volume of the original facility or the original infrastructure; and
(f) the levels of noise that are likely to result from the operation of the co-located facilities are less than or equal to the levels of noise that resulted from the operation of the original facility or the public utility structure
"Co-located facilities means one or more facilities installed on or within:
"In-building subscriber connection equipment means a facility installed within a building with the aim of managing and maintaining the supply of carriage services to a customer of the carrier;" "Subscriber connection means an installation for the sole purpose of connecting premises to a telecommunications network;" "Tower means a tower, pole or mast;"
"Facility means: (a) any part of the infrastructure of a telecommunications network; or (b) any line, equipment, apparatus, tower, mast, antenna, tunnel, duct, hole, pit, pole or other structure or thing used, or for use, in or in connection with a telecommunications network."
The telecommunications facility code of practice
"5.9 A telecommunications facility located inside a building, structure or tunnel
A telecommunications facility located inside a building, structure or tunnel is a facility located so that it is not visible from outside the building, structure or tunnel or which is included in or integrated with the building, structure or tunnel in such a way as to have the appearance of being part of the building, structure or tunnel.
1. The design, location, installation and operation must be in accordance with the principles set out in section 4 of this Code.
2. The facility must be located wholly within the building, structure or tunnel or must be integrated with the building, structure or tunnel in such a way as to have the appearance of being part of the structure."
* the conclusion to be drawn from the evidence before the tribunal was that what had been installed at the building was one facility - namely a base station with antennas; and
* that one facility did not fall within any of the relevant items of "low impact facility" in the schedule to the determination; and
* accordingly, what had been installed was not a "low impact facility" under the determination.
"Paragraph (b) of the definition of `facility' in the Act specifies a number of individual objects, any of which, standing separately, may need to be regarded as a separate `facility' for the purposes of any one of the various provisions of the Act in which that word appears. However, where, as here, the evidence is that a group of such objects are installed together, in one place, physically connected to each other as described by Mr Bell, in order to carry out one single purpose, it does not appear to me that the legislation is intended to have the effect that each of those objects is to be considered separately, in order to ascertain whether it is a `low-impact facility'. It is not necessary to strain the meaning of the definition to find that together the group of objects constitutes a `part of the infrastructure of a telecommunications network' in terms of paragraph (a) of the definition of `facility'; or `any equipment' in terms of paragraph (b) of that definition."
The level of abstraction in assessing whether a facility is a low impact facility
"It is now common ground that the three panel antennae, the radiocommunications dish, the equipment shelter, underground cabling, conduits and draw pits that were proposed for the installation ... were of a type, size and location that complied with the determination. Accordingly, their installation standing alone would have complied with cl. 6(1). The exemption from state planning and other laws conferred by Div, 7 cl. 37 was broad enough to authorise the respondents to act in the teeth of the council's opposition as regards those components."[7]
"Statutory authority to engage in what otherwise would be tortious conduct must be clearly expressed in unmistakeable and unambiguous language."
But cl. 6(2) of Schedule 3 of the Act does express, in unmistakeable and unambiguous language, the intent that a carrier may enter on and occupy land for purposes in connection with installing a low impact facility.[9] Sub-clauses 6(4), (5) and (7) of Schedule 3 of the Act specify that certain types of facilities must not be specified in a determination as a low impact facility: examples are free standing towers higher than 5 metres and overhead lines where the maximum external cross-section of the line exceeds 13 millimetres. It is also to be noted that if a telecommunications carrier does enter on and occupy any land, this not only carries with it obligations to do as little damage as practicable, to restore the land and to responsibly manage the land, but also to pay compensation.[10]
"Speaking generally, a much surer guide to the legislative intention in areas of legislation dealing with ordinary rights or the general system of law is to construe the language of the enactment in its natural and ordinary meaning, having regard to its context - which will include other provisions of the enactment, its history and the state of the law - as well as the purpose which the enactment seeks to achieve."
But, for the reasons given above, applying this approach to the determination, and in particular to cl. 3.1(1) and the schedule of the determination, offers greater support to the approach advocated by the appellant than to the principal approach adopted by the trial judge.
[1] See s. 3(1) of the Planning and Environment Act 1987. This definition applies to the scheme by reason of cl. 71 of the scheme and s. 23 of the Interpretation of Legislation Act 1984.
[2] See, for example, cl. 62.02 of the scheme.
[3] Section 484 of the Telecommunications Act 1997 (Cth) provides that Schedule 3 of the Act has effect. This provision was described by the High Court of Australia in Bayside City Council v Telstra Corporation Ltd [2004] HCA 19, at [12], as "a single, proleptic, provision" of Pt. 24 of the Act.
[4] The explanatory statement to the determination, issued by the Minister for Communications and the Arts, states that the schedule "contains a list of facilities and the circumstances under which they are to be regarded as being "low-impact." This reinforces the reasoning used in this paragraph.
[5] The first respondent argued that cl. 6(2) of Schedule 3 is not designed to authorise the permanent placement of components, but, rather, the activity of installing the components. But, in this respect, it is little different than cl. 6(1), which authorises the installation of a facility (in the circumstances set out in that provision). In my opinion, if a carrier is authorised to install a facility, or erect equipment or goods, on particular land, it may continue to occupy the land, after the installation or erection, and maintain the facility, equipment or goods in place. This approach not only makes sense of cl. 6(1) and (2), but also is consistent with cl. 7 of Schedule 3.
[7] [2003] NSWCA 179, (2003) 200 ALR 308, at [36].
[8] [1994] HCA 15; (1994) 179 CLR 427, 435-436.
[9] Clause 7 of schedule 3 of the Telecommunications Act, concerning the maintenance of a facility, is of a different character because it can potentially operate in respect of both an original facility and a structure that will only become a "facility" when it is repaired: see Hurstville City Council v Hutchison 3G Australia Pty Ltd [2003] NSWCA 179, (2003) 200 ALR 308, at [59].
[10] See cll. 8, 9, 10 and 42 of schedule 3 of the Telecommunications Act. The requirement that compensation be paid means that the principle in Coco v R must operate with less force than would be the case if no compensation was payable.
[14] This interpretation is consistent with, and supported by, the regulation impact statement to the Telecommunications (Low-impact Facilities) Determination 1997 (Amendment No. 1 of 1999), where it discusses in-building subscriber equipment and internal equipment shelters (at p. 4).
[15] The expression "associated with" involves some connection between the building being considered and the permitted facility or facilities. The degree of connection which is adopted should be that which best carries out the objects of the scheme: see Kia Australia Pty Ltd v Chief Executive Officer of Customs {1998) 86 FCR 473, at 480.
Hutchison 3G Australia Pty Ltd
Director of Housing & Anor [2004] VSCA 99
(2003) 200 ALR 308
(1994) 179 CLR 427
(1998) 194 CLR 355
(2001) 204 CLR 290