[2016] VCAT 1919
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2016-11-16
Original judgment source is linked above.
Construction of six x two-storey dwellings and removal of vegetation.
(i) The use of an On-site Stormwater Detention (OSD) system;
(ii) The outfall drainage works necessary to connect the subject site to the Council nominated Legal Point of Discharge;
Please note the Engineering plans must show all protected and/or retained trees on the development site, on adjoining properties where tree canopies encroach the development site and along proposed outfall drainage and roadway alignments (where applicable) and every effort must be made to locate services away from the canopy drip line of trees and where unavoidable, details of hand work or trenchless installation must be provided.
(k) The Tree Preservation Fencing in accordance with Condition 10 of this permit;
(l) Landscape and tree zones to be clearly marked with hatching, colour coding or similar and distinguished from useable open space areas;
(m) A schedule of external building materials and colours, including details of cladding and roofing materials; the schedule should be presented on a separate sheet and must include colour samples.
(n) The provision of a rainwater storage tank for each of the dwellings including its location, sizing and a notation of the connections and end use.
(o) The location of external clothes lines and letter boxes.
(p) All sustainable design features indicated in the submitted Sustainable Design Assessment (SDA)/Sustainable Management Plan (SMP). Where sustainable design features outlined in the SDA/SMP cannot be visually shown, include a notes table providing details of the requirements (i.e. energy and water efficiency ratings for heating/cooling systems and plumbing fittings and fixtures, etc)
Tree Preservation Zones are to be provided to the extent of the calculated Tree Protection Zone (TPZ) where it occurs within the subject property. The fencing can be realigned and suitable ground protection provided to allow the approved construction therein only to the satisfaction of the project arborist and only when approved by the responsible authority.
(b) Management of works
(i) A suitably qualified arborist must supervise or undertake all approved activity within the calculated TPZ of a retained tree. Any root severance within the TPZ must be undertaken to their satisfaction using a clean sharp and sterilised pruning saw. There must be no root pruning within the SRZ unless consent is received in writing by the responsible authority, and there must be no root pruning within the TPZ for works other than those endorsed by the responsible authority.
(ii) All and any excavations within the TPZ of retained trees must be undertaken by hand or by approved non-destructive techniques suitable in the vicinity of trees, and must only be undertaken by, or directed and supervised by, a suitably qualified arborist for endorsed works or for works subsequently approved by the responsible authority.
(c) Weed control
Any weeds located within the Tree Preservation Zone are to be removed and the area mulched with 100mm of composted coarse grade woodchips
(d) Fencing
(i) Protective fencing must consist of chain wire mesh panels held in place with concrete feet. Fencing must comply with Australian Standard AS 4687-2007 Temporary fencing and hoardings.
(ii) The fences must not be removed or relocated without the prior consent of the responsible authority.
(e) Signage
Fixed signs are to be provided on all visible sides of the Tree Preservation Fencing, stating "Tree Preservation Zone - No entry without permission from the City of Banyule".
The area must be irrigated during the summer months with 10 litres of clean water for every 1 cm of trunk girth measured at the soil / trunk interface on a monthly basis during summer (or a percentage thereof equivalent to the percentage of TPZ area occurring within the subject site).
(g) Access to Tree Preservation Zone
(i) No persons, vehicles or machinery are to enter the Vegetation Protection Zone except with the consent of the responsible authority;
(ii) No fuel, oil dumps or chemicals are allowed to be used or stored within the Vegetation Preservation Zone and the servicing and re-fuelling of equipment and vehicles must be carried out away from the root zones;
(iii) No storage of material, equipment or temporary building is to take place within the Vegetation Preservation Zone;
(iv) Nothing whatsoever, including temporary services wires, nails, screws or any other fixing device, is to be attached to any tree.
(h) Underground Services
Any underground service installations transecting a Tree Protection Zone of any retained tree must be bored beneath the entire TPZ to a depth of at least 600mm. Any excavation within the calculated TPZ of a retained tree required for the connection of services must be:
(i) Undertaken after written approval is received from the responsible authority; and,
(ii) Undertaken by hand or by approved non-destructive techniques suitable in the vicinity of trees under the supervision of the project arborist.
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing, and the statements of grounds filed; have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
Hristov
Banuyule CC [2016] VCAT 1919