austlii:vic/VBAB/2025/119
General information, not legal advice.
VBAB
2025-10-03
Members P, Chairperson P
Original judgment source is linked above.
DISPUTE - Dispute referred pursuant to s 158 of the Building Act 1993 between owners of buildings with a party wall about the construction of the wall or how much of the cost of construction is to be met by each of the owners.
APPLICANTS James Holman and Raelene Sambrook (Subject Land owners)
RESPONDENTS Ross Calia, Vincenzo Calia and Carmel Calia (Adjoining Property owners)
SUBJECT LAND 623 Brunswick Street, Fitzroy North
ADJOINING PROPERTY 621 Brunswick Street, Fitzroy North
BEFORE Members P Chau (Chairperson), M Otteren and P Irwin
CITATION Holman & Anor v Calia & Anor [2025] VBAB 119
Having considered all the submissions and information placed before it, the Building Appeals Board (the BAB) determines that:
(a) Have a licensed plumber replace the existing in ground earthenware stormwater line at the south east corner of the Subject Land with a new PVC service.
(b) Have a licensed plumber check and ensure the integrity and water tightness of the stormwater plumbing at the east end of the Subject Land. This is to include, roof gutters, downpipes, air conditioning condensate and in ground stormwater plumbing to the legal point of discharge.
(c) A report by the plumber to be provided to the Applicant and the Respondent confirming that the services have been leak tested and founded to be substantially leak free.
(a) Request the City of Yarra check that the footpath pavement is suitably conducting the water from the downpipe in question away from the Subject Land and Adjoining Property and provide the City of Yarra's response to the Applicants.
_______________________ ________________________
(1) If a dispute arises between the owners of buildings with a party wall about the construction of the wall or how much of the cost of construction is to be met by each of the owners, any of the owners may refer the matter to the Building Appeals Board.
(2) Subsection (1) is in addition to and does not take away from the Subdivision Act 1988.
(a) the Act and the Building Regulations 2018 (Regulations); and
(b) a site inspection of the Subject Land and Adjoining Property conducted by us on 28 July 2025.
(a) an 8.15 metre section of double brick wall that bounds the front, internal rooms of both properties (Internal Party Wall); and
(b) a separate, 2.44 metre section of double brick wall that bounds the front verandah, balcony and garden of the Subject Land and a front room of the Adjoining Property (External Party Wall).
(a) a section that bounds the front, paved verandah and balcony of the Subject Land and which shows the most cracking and structural distress (Verandah Wall); and
(b) a section that bounds the front, permeable garden of the Subject Land (Garden Wall).
THE BAB's JURISDICTION UNDER SECTION 158
(a) the construction of the party wall; or
(b) cost of the construction,
(a) "a wall of which the two adjoining owners are tenants in common; or
(b) a wall divided vertically into two portions, one belonging to each of the adjoining owners; or
(c) a wall which belongs entirely to one adjoining owner subject to an easement in the other to have it maintained as a dividing wall; or
(d) a wall divided vertically into two portions, each owned by one, but being subject to a cross-easement in favour of the other portion."[3]
(a) Lot Plan 40748 (LP40748), which is a lot plan referred to in the easement register attached to PS445111J; and
(b) Instrument AP121385Y, which is missing from Land Victoria's database.
(a) is divided vertically into two portions, each owned by the Applicants and Respondents, as shown in LP40748; and
(b) is subject to cross-easements in favour of both the Applicants and the Respondents as indicated by:
(i) easement E-1 in PS445111J; and
(ii) easements E-2 and E-3 on LP40748.
(a) the External Party Wall is 'not a parti [sic] wall' and 'maintenance of this Boundary Wall is the responsibility of the Property owners of Lot 621'; but
(b) despite being a boundary wall which is 'not shared across the boundary of the properties, functions in a manner indistinguishable from a traditional party wall;' and
(c) the definition of party wall for the purposes of s 158 ought to be determined broadly to include the External Party Wall.
(a) although:
(i) neither PS445111J nor LP4078 shows the External Party Wall as an easement; and
(ii) the External Party Wall physically sits entirely within the title boundary of the Adjoining Property;
(b) the External Party Wall is used:
(i) by the Parties as a dividing wall that separates the Adjoining Property from the Subject Land's garden, verandah and balcony; and
(ii) by the Applicant as support for the Subject Land's verandah, balcony and associated roof and storm water drainage structures.
(a) the External Party Wall is used by the Applicant as support for the Subject Land's verandah, balcony and associated roof and storm water drainage structures; and
(b) access to the north face of the External Party Wall:
(i) can only be gained through the Subject Land; and
(ii) is restricted by fencing and gates on the Subject Land controlled by the Applicant.
(a) the Applicant primarily responsible for maintenance of the north face and brick leaf of the External Party Wall; and
(b) the Respondent primarily responsible for maintenance of the south face and brick leaf of the External Party Wall.
(a) build, re-build, erect or re-erect the building; and
(a) are necessary and reasonable to ensure the repair and maintenance of the External Party Wall; and/or
(b) substantially affect the External Party Wall, even if such works are not directly made to the External Party Wall.
(a) The External Party Wall has suffered distress in recent years from foundation movement.
(b) The dominant pattern of this foundation movement is settlement of the south east corner of the house and, in particular, the east-most extremity of the External Party Wall which protrudes beyond the house and verandah.
(c) The foundation movement has been caused by a lack of bearing capacity of the foundation, softening in common parlance.
(d) The foundation softening has been caused by water ingress.
(e) The water ingress has emanated entirely or substantially from the downpipe (DPA) at the north east corner of the Subject Land that services the first floor verandah and ground floor canopy of the Adjoining Property.
(f) The External Party Wall is unstable and potentially dangerous.
(g) Differential movements of up to 70mm have occurred.
(h) Remedial works are required that reverse a substantial part of the movement, ensure future stability and repair the structure.
(a) The building movement and distress is broadly as asserted by the Applicant, although there is some difference in the figures.
(b) The movement and distress has not been caused dominantly, or at all by DPA but by a number of influences within the Subject Land over many years, including defective plumbing, poor site drainage and vegetation causing drying of the soil.
THE APPLICANTS' EXPERT EVIDENCE OF MR JAMES SPRAGUE
(a) Mr Sprague contended that water was emanating from the DPA and running back towards the building. We are not convinced that this has been established to be the dominant or material flow of water but neither are we excluding the possibility that some water could flow towards the building as contended.
(b) Mr Sprague contended, without supporting evidence, that this water was reaching the foundation of the eastern end of the External Party Wall. We are not satisfied that this is occurring.
(c) Mr Sprague further contended that the foundation of the eastern end of the External Party Wall was saturated to the point of not being able to carry the weight of the footing without settlement as a result of this water inundation. There is no evidence for this and it is contrary to the geotechnical evidence.
(d) Mr Sprague offered further opinions regarding appropriate structural remedial works which we do not accept as this is outside his expertise.
THE APPLICANTS' EXPERT REPORT OF STRENGTH ENGINEERING
(a) A range of possible influences contributing to foundation and building movement were identified.
(b) An accompanying report by Oz Geos Geotechnical and Structural dated 25/07/2024, was cited. This report described an investigation that only reached the foundation with penetration testing rods so provided only very limited information which suggested a sound bearing capacity.
(c) Resin injection to the foundation was recommended without any explanation explaining its strengths and limitations and comparing and contrasting it to other solutions.
THE RESPONDENTS' EXPERT EVIDENCE OF MS SARA KHANI
(a) the Applicants are to carry out the following works at their own costs:
(i) Have a licensed plumber replace the existing in ground earthenware stormwater line at the south east corner of the Subject Land with a new PVC service.
(ii) Have a licensed plumber check and ensure the integrity and water tightness of the stormwater plumbing at the east end of the Subject Land. This is to include, roof gutters, downpipes, air conditioning condensate and in ground stormwater plumbing to the legal point of discharge.
(iii) A report by the plumber to be provided to the Applicant and the Respondent and confirming that the services have been leak tested and founded to be substantially leak free.
(b) the Respondents are to carry out the following works at their own costs:
(i) Request the City of Yarra check and ensure that the footpath pavement is suitably conducting the water from the downpipe in question away from the Subject Land and Adjoining Property and provide to the Applicant written confirmation of the City of Yarra's response.
[1] Clause 17 of Schedule 3 to the Building Act 1993 provides: 'Unless the Building Appeals Board otherwise determines, a party to a proceeding before the Board must bear his, her or its own costs'.
[2] Walsh v Elson [1955] VicLawRp 2; (1955) VLR 276.
[4] Corrected by determination made on 15 October 2025 under cl 18(1)(a) of Sch 3 to the Building Act 1993, Orders 1 and 2, deleting 'The Applicant's' and substituting 'The Respondent's', and deleting 'constructions' in para 43 of the Reasons dated 3 October 2025.
[5] Corrected by determination made on 15 October 2025 under cl 18(1)(a) of Sch 3 to the Building Act 1993, Order 3, deleting 'deflective' and substituting 'defective' in para 70 of the Reasons dated 3 October 2025.
�Holman & Anor
Calia & Anor [2025] VBAB 119;