[2022] QCAT 103
General information, not legal advice.
Queensland Civil and Administrative Tribunal
2022-02-09
Original judgment source is linked above.
PROFESSIONS AND TRADES - BUILDERS - STATUTORY POWER TO REQUIRE RECTIFICATION OF DEFECTIVE OR INCOMPLETE BUILDING WORK - QBCC policy on rectification referencing Australian Standards - whether decision to not require rectification unfair or unreasonable
Queensland Building and Construction Commission Standards & Tolerance Guide parts 11.3, 11.7
Australian Standard 3958.1-2007; Ceramic Tiles - Guide to installation of Ceramic Tiles Appendix D, sections D1 and D3
(a) Calacatta Natural Gloss Porcelain Tiles 300mm x 600mm
(b) Matang Charcoal Gloss Tiles 400mm x 400mm
(c) Wall White Tiles 300mm x 600mm
However, the Callacatta Natural Gloss Tiles were in fact 297mm x 600mm.
(a) Feature tile wall does not line up with other walls in the grout line;
(b) Slope of shower floor - water pools towards the glass screen after shower and water goes over the strip in-front of shower when showering;
Floor and wall tiling where the owner supplies the tiles for laying by contractor
Within 12 months from completion faulty installation of tiles is defective if caused by the contractor's workmanship. Any fault in the tiles is the responsibility of the owner - except where faults in the tiles should have been apparent to the contractor at the time of laying
I find that the fault in the tiles being misaligned and the size variance can be attributed as the responsibility of the applicant on the basis that they purchased the tiles... are not defective building works.
Falls in floor finishes shall allow all surface water to drain without ponding except for residual water remaining due to surface tension. For general bathroom floor area the minimum fall to the waste shall be 1:100
The applicant has not provided any information or evidence to suggest that the water that remains on the finished floor is of a manner that adversely affects the health or amenity of the occupants or deteriorates building elements
11.7 Uneven Tiling
Within 12 months of completion of the works except where tiles have distortions inherent in the manufacture, tiling is defective if it has joints that are not uniform, of even width aligned or in the same plane
Where required falls in floor finishes shall allow all surface water to drain without ponding except for residual water remaining due to surface tension. For general bathroom floor area the minimum fall to the waste shall be 1:100.
Falls in shower floors shall be sufficient to prevent
(a) surface water from being retained on the shower floor (except for residual water remaining due to surface tension); and
(b) water from discharging outside the shower area
The primary consideration for falls in floor finishes is to ensure water does not remain on the finished floor in a manner that can adversely affect the health or amenity of the occupants or deteriorate building elements. Falls in floor finishes should ensure water exits the area at the floor waste and ... water should not pond on the floor, with the exception of residual water remaining due to surface tension.
Where falls flatter than 1:100 are proposed, the effectiveness of the floor drainage should be confirmed to ensure the primary consideration given in B1 has been met
Where falls steeper than 1:100 are not achieved the effectiveness of the floor drainage should be confirmed to ensure it meets the primary consideration set down in paragraph D1, which in turn states:
Water should not pond on the floor with the exception of residual water remaining due to surface tension
Found 3 mm of fall from the right side shower wall to the shower screen near the strip drain indicating a cross fall of 1:300 from right to left.
Its typical when you get to your waste point that waste point only has to be half a millimetre higher than the tile and you get really good surface tension there.
(a) Confirm or amend the Commissions decision;
(b) Set aside the Commissions decision and substitute its own decision;
(c) Set aside the Commissions decision and return the matter for reconsideration.
Hicks
Queensland Building and Construction Commission & M & R Hudson Plumbing Pty Ltd [2022] QCAT 103