121-123 Commercial Road and airspace over railway, South Yarra.
All to the satisfaction of the Responsible Authority.
When approved, the plan will be endorsed and will then form part of the permit. Waste collection from the development must be in accordance with the Plan, to the satisfaction of the Responsible Authority.
All works must be undertaken in accordance with the endorsed Sustainability Management Plan to the satisfaction of the Responsible Authority. No alterations to the Sustainable Management Plan may occur without written consent of the Responsible Authority.
Once endorsed, the provisions, recommendations and requirements of the Acoustic Report must be implemented and complied with to the satisfaction of the Responsible Authority.
The agreement must be registered with the Registrar of Titles in accordance with section 181 of the Planning and Environment Act 1987 and will run with the land, including any common property that may be created as part of the subdivision of the land.
All costs (including legal costs) associated with the preparation and review of the agreement and the registration of the agreement on the Certificate of Title for the land must be paid by the owner.
In accordance with Section 69 of the Planning and Environment Act 1987, a request may be submitted to the Responsible Authority within the prescribed timeframes for an extension of the periods referred to in this condition.
Conditions of the Department of Health and Human Services
The cross section of the proposed deck structure (including vertical and horizontal clearances) as shown on the plans must meet the requirements of PTV, VicTrack and the Accredited Rail Operator (ARO).
Such plans must be prepared to the satisfaction of PTV and VicTrack, in consultation with the ARO.
All demolition and construction works must be implemented in accordance with the approved Demolition and Construction Management Plan. The Demolition and Construction Management Plan must be implemented at no cost to VicTrack, PTV and/or the ARO.
Permanent or temporary soil anchors must not be installed in rail land and/or easements without the prior permission of VicTrack and PTV.
No drainage, effluent, waste, oil or other materials must enter or be directed from the site to rail land/easement or stored or deposited on rail land/easements.
No lighting is to spill light onto railway tracks or interfere with the visibility of signals and the rail lines by train drivers to the satisfaction of the ARO.
Prior to the commencement of works in public transport areas, the public transport operator (tram and train) must be contacted to obtain the ARO's conditions and safety requirements for works on, over, under or adjacent to public transport land and/or easements and electrical infrastructure. Access to the public transport areas during construction must conform to all of the necessary public transport operators' guidelines and instructions.
All Australian Standards must be complied with, from commencement to completion of the development.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing, and the statements of grounds filed; have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Benson Property Group Pty Ltd v Stonnington CC [2017] VCAT 2155
[7] We have applied the Levels as shown on the plans, which are Ground Floor then Levels 1 to 7. This means that Level 7 is the building's eighth storey.
[8] Excluding the lift overrun, stair core and plant screen.
[9] Letter from VicTrack to the Planning Registrar VCAT dated 23 June 2017.
[10] Letter from VicTrack to the Planning Registrar VCAT dated 18 October 2017.
[13] As described, the purpose of clause 37.08 includes 'to facilitate use and development of land in accordance with the Development Framework for the activity centre', and clause 37.08-1 titled_: 'Operation'_ states that 'A schedule to this Zone comprises the Development Framework for the activity centre'.
[14] At clause 4.4 Centre-wide provisions for Design and Development in combination with clause 5.3-3 Prahran Built Form Requirements.
[15] At clause 4.4 Centre-wide provisions for Design and Development.
[16] The 'island' character being its abuttals to local streets rather than adjoining properties.
[17] The Prahran Market is subject to an Individual Heritage Overlay, and is excluded from the ACZ1 in the same manner as the air space above the railway corridor.