[2025] VCAT 578
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-07-04
Original judgment source is linked above.
DOES THE PROPOSAL LEAD TO UNACCEPTABLE LANDSCAPE IMPACTS?
DOES THE ADDITIONAL CABIN LEAD TO ANY OTHER UNREASOANBLE AMENITY IMPACTS?
Aerial imagery suggests that the originally proposed buffer planting has not yet been completed.
(a) Updated site plan on Sheet A2 to accurately show the current development of the site including an amended driveway layout and any changes to land use and development as approved under Planning Permit 200110.
(b) The location of any existing or proposed septic systems/effluent fields onsite with dimensions.
(c) An amended landscape plan in accordance with Condition 4 of this planning permit.
All to the satisfaction of the responsible authority. When approved, the plans will be endorsed and will then form part of this Permit.
(a) Amendments to the landscape plan and driveway layout to ensure it is consistent with the development plans required under Condition 1 of this permit.
(b) The accurate and extended location of all garden beds and planting around existing cabins as established onsite and to be retained.
(c) Any proposed changes to the landscape buffer planting running between the accessway and fence line along the southeast site boundary. The buffer must include upper-storey (trees) and under-storey (shrubs) to screen the group accommodation from the surrounding landscape to the satisfaction of the responsible authority.
(d) Additional planting including native canopy trees of advanced stock with a minimum 35-centimetre pot size, and a height of 2 metres at time of planting along the accessway to Cabin 4.
(e) An updated landscape legend/planting schedule to clearly show any amendments to planting and additionally proposed planting including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant.
(a) The hole for any new tree must be 2 - 3 times wider than the pot the tree was grown in and approximately the same depth as the pot. The tree must not be planted any deeper than the soil level in the pot.
(b) The soil from the hole to be replaced around the tree root ball, firmed in and watered in well.
(c) The area, a minimum of 1 metre radius from the trunk of the tree, should be mulched with composted mulch at a minimum depth of 50 - 75 millimetres and watered well during dry periods for a minimum of 12 months to ensure the new tree establishes in its new position.
(a) The Group Accommodation must not be occupied by the same person/s for more than 42 consecutive days/nights and no more than 150 cumulative days/nights per calendar year, unless with the written consent of the Responsible Authority;
(b) The Group Accommodation must not be used as a permanent residence (dwelling);
(c) The operator/owner is to keep a log of all visitations/patrons and produce it to the responsible authority upon request; and
(d) If the use of the land for Group Accommodation ceases for a period of more than two years, the building(s) must be removed from the land within three months unless the written consent of the responsible authority is provided.
The Agreement must be registered on title pursuant to Section 181 of the Planning and Environment Act 1987 and confirmation of the Dealing number provided to Council before the issue of an Occupancy Permit or commencement of use of the building(s). All costs relating to the preparation and registration of the Agreement must be borne by the applicant.
(a) transport of materials, goods, or commodities to or from the land;
(b) appearance of any building, works or materials;
(c) emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, litter, dust, wastewater, waste products, grit, or oil; and
(d) presence of vermin or animals.
(a) The development is not started within two years of the date of this permit;
(b) The use has not started within two years of completion of the development;
(c) The development is not completed within four years of the date of this permit;
(d) The use is discontinued for a period of more than two years.
Where the development or stage started lawfully before the permit expired, the responsible authority may extend the period in which the development or stage must be completed if a request is made in writing before the permit expires or within twelve months afterwards.
[1] The submissions of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Permit, 200110 issued on 21 October 2020.
[6] Noting this road is also identified in Map 3 of the SPP as a road corridor view. This has a notation to 'manage development of infrastructure to maintain views to hills, rural hinterland and/or coast'.
[7] This is regardless of whether the existing traffic is from four temporary accommodation units or three, with one or two permanent dwellings respectively.
Hazelden