[2024] HCA 1
High Court of Australia
2023-09-05
Gageler CJ, Gleeson JJ
Original judgment source is linked above.
(b) declare that the grant of ML 29881 under s 40(1)(b)(ii) of the Mineral Titles Act 2010 (NT) is a future act that is the creation of a right to mine for the sole purpose of the construction of an infrastructure facility associated with mining within s 24MD(6B)(b) of the Native Title Act 1993 (Cth); and
(c) order that the first respondent be restrained from deciding the application for ML 29881 until completion of the procedures in s 24MD(6B) of the Native Title Act 1993 (Cth).
S A Glacken KC with R W Kruse for the appellants (instructed by Northern Land Council)
S B Lloyd SC with L S Peattie for the first and second respondents (instructed by Solicitor for the Northern Territory)
R N Traves KC with M A Eade for the third respondent (instructed by Ward Keller)
Notice: This copy of the Court's Reasons for Judgment is subject to formal revision prior to publication in the Commonwealth Law Reports.
Harvey v Minister for Primary Industry and Resources
Native title - Native title rights - Mining - Mineral leases - Where s 24MD(6B) of Native Title Act 1993 (Cth) entitles native title holders to certain procedural rights in relation to future acts that, relevantly, involve "the creation or variation of a right to mine for the sole purpose of the construction of an infrastructure facility ... associated with mining" - Where Mount Isa Mines Limited carries on mining enterprise in Northern Territory - Where Mount Isa Mines Limited applied for mineral lease ("ML 29881") under Mineral Titles Act 2010 (NT) to construct Dredge Spoil Emplacement Area ("DSEA") on pastoral lease - Where first and second appellants native title holders in respect of land comprising pastoral lease - Where third appellant relevant prescribed body corporate for the purposes of Native Title Act - Whether appellants entitled to procedural rights in s 24MD(6B) of Native Title Act - Whether proposed grant of ML 29881 constitutes creation of right to mine for sole purpose of construction of infrastructure facility associated with mining pursuant to s 24MD(6B)(b) of Native Title Act - Whether definition of "infrastructure facility" in s 253 of Native Title Act exhaustive - Whether DSEA infrastructure facility.
Words and phrases - "associated with mining", "definition", "dredging", "exhaustive", "explanatory memorandum", "extrinsic materials", "future act", "includes any of the following", "infrastructure facility", "mine", "mineral lease", "mining", "mining lease", "mining operations", "mining tenement", "native title holders", "ordinary meaning", "right to mine", "right to negotiate", "sole purpose", "statutory interpretation".
Mineral Resources (Sustainable Development) Act 1990 (Vic), ss 4(1), 14(1).
Mineral Resources Act 1989 (Qld), ss 234(1)(b), 316(2).
Mineral Resources Development Act 1995 (Tas), ss 3, 84(1)(a), 106(1).
Mineral Titles Act 2010 (NT), ss 11(1), 12(1), 40, 44, 74(2), 86, 148.
Native Title Act 1993 (Cth), ss 24MD(6A), 24MD(6B), 26(1)(c)(i), 26(2), 226, 253.
(a) pursuant to s 24MD(6A) of the Native Title Act, the appellants have the same procedural rights as if they held ordinary title to the land concerned ("freeholder rights"), but nothing more; or
(b) pursuant to s 24MD(6B) of the Native Title Act, in addition to the freeholder rights, the appellants have the statutory rights of notification, objection and consultation set out in that sub‑section, because the grant will constitute "the creation ... of a right to mine for the sole purpose of the construction of an infrastructure facility ... associated with mining"; or
(c) pursuant to s 26(1)(c)(i) of the Native Title Act, the appellants have a statutory "right to negotiate" with Mt Isa Mines in accordance with Subdiv P of Div 3 of Pt 2, because the grant will constitute "the creation of a right to mine ... except one created for the sole purpose of the construction of an infrastructure facility ... associated with mining".
"McArthur River Project means the project to be developed by the Company in the Northern Territory of Australia relating to the mining of zinc-lead-silver from the mineral deposit known as the HYC deposit and the subsequent treatment, storage and transport of Ore and Concentrate within and between the Mineral Leases within the external boundaries of the northern portion of RO581 as at the date of this Agreement and any adjoining areas and the area of one Mineral Lease on the Bing Bong Pastoral Lease No 686 and adjacent Territory waters. The project is for the purposes of:
(b) processing, treatment and concentration of Ore;
(d) transporting Concentrate for sale, export or further processing;
(f) for such other purposes in connection with the McArthur River Project as are necessarily incidental to paragraphs (a), (b), (c), (d) and (e)."
"The Company may use or permit to be used the Lease Area for the purposes of:
(a) Mining, processing, treatment and concentration of the Ore including the treatment of tailings or other mining material and removal of Ore, Concentrate, tailings or other mining material from the Lease Area;
(b) the erection of machinery, conveyor apparatus, plant, buildings or other structures, or use thereof;
(c) impounding and retaining of waste resulting from the Mining, treatment or processing operations;
(d) the erection and use of residential premises or recreational facilities for persons engaged in or connected with the McArthur River Project;
(e) the cutting and construction of water races, drains, dams and roads for use in connection with the McArthur River Project;
(f) the boring or sinking for, pumping or raising of, water for the use of that water for or in connection with the McArthur River Project;
(h) the Mining and use of extractive minerals for or in connection with all or any of the purposes specified in paragraphs (a), (b), (c), (d), (e) and (f) of this clause; and
(i) such other purposes necessarily incidental to or in connection with paragraphs (a), (b), (c), (d), (e), (f), (g) and (h) of this clause, including the management, protection and rehabilitation of the Environment."
"The Company may use or permit to be used the Lease Area for the purposes of:
(a) receiving, handling, storage and removal of Concentrate and other material and such other purposes in connection with and necessarily incidental to the Mining and the development, construction and operation of the McArthur River Project;
(b) the dredging of a channel and swing basin for a barge loading facility;
(c) the erection of machinery, conveyor apparatus, plant, buildings or other structures, or use thereof;
(d) the use of trucks, barges and other means of transport for deliveries to and from the Lease Area;
(e) the erection and use of residential premises or recreational facilities for persons engaged in or connected with the McArthur River Project;
(f) the cutting and construction of water races, drains, dams and roads for use in connection with the McArthur River Project;
(g) the boring or sinking for, pumping or raising of, water for the use of that water for or in connection with the McArthur River Project;
(i) the Mining and use of extractive minerals for or in connection with all or any of the purposes specified in paragraphs (a), (b), (c), (d), (e), (f) and (g) of this clause; and
(j) such other purposes necessarily incidental to or in connection with paragraphs (a), (b), (c), (d), (e), (f), (g), (h) and (i) of this clause, including the management, protection and rehabilitation of the Environment.
Provided that pursuant to the Agreement the Company is entitled to permit the use of the facilities on the Lease Area by third parties for purposes other than the McArthur River Project."
"McArthur River Mining (MRM) operates the Bing Bong Loading Facility through which concentrates produced at the Mine are loaded onto a self propelled barge and then transhipped onto Ocean Going Vessels for export throughout the world.
The loading Facility is predominately located on Mineral lease MLN 1126 and consists of a concentrate storage shed and barge loading conveyor system, a swing basin and navigation channel.
At the time of construction in 1994/95 an area on the southern boundary of the Mineral Lease was developed into a dredge spoil deposition area. The swing basin and navigation channel require regular dredging to remove silts and muds from the channel to ensure that sufficient under keel clearance is maintained to enable safe operations for the barge.
Dredged material has been deposited in the spoil area during the course of several dredging campaigns spanning 15 years, however the capacity of the spoil area has now been reached and as such an additional dredge spoil area needs to be constructed.
Works proposed will include the construction of a new dredge spoil area similar in size and design to the existing spoil area and will include engineered internal and external walls and internal and external drains to carry sea water to the existing drainage channel and back out to sea.
The new dredge spoil area will have sufficient capacity to cover anticipated dredging requirements out to the end of mine life."
"As we follow the matter, without a port at Milner Bay and an approach to this port through the shallows of the Gulf of Carpentaria the taxpayer's mining operations, which had begun upon its mining property, could not have been effectively developed. We consider that to make an approach to a port which is found to have been part of a mining property is also to develop the mining property itself. It is like the provision of an access road to enable the potentialities of the mining property to be developed."
"A 'mining lease' is a lease (other than an agricultural lease, a pastoral lease or a residential lease) that permits the lessee to use the land or waters covered by the lease solely or primarily for mining."
"In the case only of references to a mining lease, the expression 'lease' also includes a licence issued, or an authority given, by or under a law of the Commonwealth, a State or a Territory."
(a) explore or prospect for things that may be mined (including things covered by that expression because of paragraphs (b) and (c)); or
(b) extract petroleum or gas from land or from the bed or subsoil under waters; or
"An example of a future act covered by this subsection is the grant of a mining lease over land in relation to which there is native title when a mining lease would also be able to be granted over the land if the native title holders instead held ordinary title to it."
"The native title holders, and any registered native title claimants in relation to the land or waters concerned, have the same procedural rights as they would have in relation to the act on the assumption that they instead held ordinary title to any land concerned and to the land adjoining, or surrounding, any waters concerned."
(a) explore or prospect for things that may be mined (including things covered by that expression because of paragraphs (b) and (c)); or
(b) extract petroleum or gas from land or from the bed or subsoil under waters; or
but does not include extract, obtain or remove sand, gravel, rocks or soil from the natural surface of land, or of the bed beneath waters, for a purpose other than:
(d) extracting, producing or refining minerals from the sand, gravel, rocks or soil; or
(e) processing the sand, gravel, rocks or soil by non-mechanical means."
"infrastructure facility includes any of the following:
(a) a road, railway, bridge or other transport facility;
(d) an electricity generation, transmission or distribution facility;
(e) a storage, distribution or gathering or other transmission facility for:
(f) a storage or transportation facility for coal, any other mineral or any mineral concentrate;
(g) a dam, pipeline, channel or other water management, distribution or reticulation facility;
(h) a cable, antenna, tower or other communication facility;
(i) any other thing that is similar to any or all of the things mentioned in paragraphs (a) to (h) and that the Commonwealth Minister determines, by legislative instrument, to be an infrastructure facility for the purposes of this paragraph."
"Within its ordinary meaning, an infrastructure facility is a facility (generally a fixture) necessary for the provision of services or to support the development and operation of major developments. The infrastructure can be provided either by a government or the private sector."
"The Government believes that it is not appropriate to subject future acts of this kind to the right to negotiate. ... Such infrastructure is increasingly being provided by non-Government entities, especially in remote and regional Australia. It is appropriate however that in relation to acts of this kind, which may have the result of extinguishing native title altogether, native title holders be given procedural rights essentially the same as others but which ensure that the special nature of their rights can be taken into account."
"New subsection 24MD(6B) will also apply to the grant of a mining lease for the sole purpose of the construction of an infrastructure facility associated with mining (paragraph 24MD(6B)(b)). The grant of a mining lease of this kind is exempt from the right to negotiate (see subparagraph 26(1)(c)(i) ...) but the consequences set out in new subsection 24MD(6B) will apply to grants of this kind in addition to the procedural rights provided in subsection 24MD(6A)."
"The words 'sole purpose' have been used to make it clear that the creation of the right to mine with which the infrastructure facility is associated is not removed from the right to negotiate by this amendment. The fact that an infrastructure facility may, when constructed, also provide services to the local community, will not prevent the relevant grant being for the sole purpose of constructing the infrastructure."
"A mineral lease is a mineral title that gives the title holder:
(ii) conduct activities in the title area that are ancillary to mining conducted under another ML granted to the title holder (for example, operating a treatment plant); ..."
"If the Minister is satisfied the grant of a mineral title will be a future act in relation to any of the proposed title area of the application for the grant, the Minister may grant the mineral title only if satisfied all procedures under the [Native Title Act] relevant to the future act have been followed."
"Without attempting an exhaustive definition, the statutory text, context and purpose indicates that the expression 'right to mine' in the [Native Title Act] refers to a future act that confers a right to engage in mining activities, which typically involve the exploration for and extraction of a mineral (or petroleum or gas) from the ground, and encompasses rights necessary for its meaningful exercise. The rights necessary for its meaningful exercise will depend upon the nature of the mining activity being undertaken, but will typically include activities of the kind referred to in s 44(1) of the Mineral Titles Act such as: the evaluation, processing or refining of minerals in the title area; the treatment of tailings and other material in the title area; the storage of waste and other material in the title area; and the removal of minerals from the title area. Rights to undertake those activities are ordinarily necessary for the meaningful exercise of a right to mine. Typically, each of those categories of activities will be directly associated with and form part of the mining activity on a given parcel of land. Rights permitting such activities can be appropriately described as a right to mine. However, the application of the statutory phrase 'right to mine' will always be fact specific."
"[S]tatements that appeared in an early version of an explanatory memorandum expressing a conclusion as to the legal effect of a statutory definition, where the substantive provisions that deploy the definition are subsequently amended in a material way, cannot be given significant weight in ascertaining the meaning and effect of the resulting enactment."
"(1) The point where a mining operation starts and finishes will be a question of fact to be decided in each case. However, the Court should not adopt a narrow view of the extent of 'mining operations' so as to frustrate the legislative intent of providing a concession to the mining industry.
(2) Relevant to this factual conclusion will be the ascertainment of the object of the particular taxpayer's operations.
(3) Generally the mining operation will continue until there has been produced that which is the object of the particular taxpayer's operation of mining.
(4) The mining operation will not necessarily be complete when a mineral has been extracted from ore, or where salt is produced, immediately there has been a recognisable salt product, be that brine or crystallised salt. It will be necessary that the mineral (salt) produced be saleable.
(5) The mere fact that a mineral is saleable will not necessarily be determinative, if the production of that mineral at that place by that taxpayer would be uneconomic. Perhaps everything can be said to be saleable for a price, but what is necessary is that the mineral in question be economically saleable at least by a person in the position of the particular taxpayer.
(6) Activities directed to improving that which is extracted, for example pelletising, may fall outside the ambit of the 'mining operation'. However, they may form part of the mining operation where the activity is closely associated with the actual extraction of the mineral. Normally this close association may be indicated by physical proximity, but lack of physical proximity will not necessitate the conclusion that the mining operation has concluded: Northwest Iron [(1986) 9 FCR 463]. The degree of integration of the activity with the actual mining process will, obviously, thus be relevant."
(a) an authority, licence, permit or right under an Australian law to mine, quarry or prospect for minerals, petroleum or quarry materials".
"The Taxpayer contends that the word 'right', as contemplated by the term 'mining, quarrying or prospecting right', is not restricted or limited to the instrument or title under or pursuant to which the right was conferred, such as, in this case, production licence WA-28-L. Rather, it says, mining, quarrying or prospecting rights are to be identified by reference to the substantive statutory rights conferred on the holder of such a production licence. ... To conclude otherwise, it contends, would fail to recognise that the production licence itself conferred no rights. Rather, it says, the Petroleum Act confers various rights upon the holder of a production licence, once particulars of the holder, or the holder of an interest, are entered in the Register. The relevant rights in this case are the right to recover petroleum and the right to explore for petroleum. The Taxpayer says that each of those rights is a right under an Australian law, one being a right to mine for petroleum, and another being a right to explore for petroleum."
"Thus, the words 'authority', 'licence', 'permit', 'right' and 'lease' are descriptive of the various types of mining titles that might arise under various Australian laws. The fact that a particular Australian law dealing with a mining title might use a different term to convey the concept of authority, permission or licence to mine, quarry or prospect, such as the term 'retention lease' in the Petroleum Act, does not mean that that mining title cannot fall within the definition. It will do so if it can fairly be characterised as an authority, licence, permit or right to mine, quarry or prospect for minerals or petroleum."
A "right to mine" for the "sole purpose": s 24MD(6B)
(2) Set aside order 1 of the orders made by the Full Court on 29 April 2022 and in its place:
(b) declare that the grant of ML 29881 under s 40(1)(b)(ii) of the Mineral Titles Act is a future act that is the creation of a right to mine for the sole purpose of the construction of an infrastructure facility associated with mining within s 24MD(6B)(b) of the Native Title Act; and
(c) order that the first respondent be restrained from deciding the application for ML 29881 until completion of the procedures in s 24MD(6B) of the Native Title Act.
(3) Each party is to bear its own costs of the appeal.
An appeal about two concepts: "right to mine" and "infrastructure facility"
The purpose of diminishing the rights of native title holders from the right to negotiate
"The Government believes that it is not appropriate to subject future acts of this kind to the right to negotiate. They include the provision of infrastructure, such as roads, gas pipelines and the like. Such infrastructure is increasingly being provided by non-Government entities, especially in remote and regional Australia. It is appropriate however that in relation to acts of this kind, which may have the result of extinguishing native title altogether, native title holders be given procedural rights essentially the same as others but which ensure that the special nature of their rights can be taken into account."
The text of s 253 and its context in the Native Title Act
"infrastructure facility includes any of the following:
(a) a road, railway, bridge or other transport facility;
(d) an electricity generation, transmission or distribution facility;
(e) a storage, distribution or gathering or other transmission facility for:
(f) a storage or transportation facility for coal, any other mineral or any mineral concentrate;
(g) a dam, pipeline, channel or other water management, distribution or reticulation facility;
(h) a cable, antenna, tower or other communication facility;
(i) any other thing that is similar to any or all of the things mentioned in paragraphs (a) to (h) and that the Commonwealth Minister determines, by legislative instrument, to be an infrastructure facility for the purposes of this paragraph."
The role of extrinsic materials in statutory interpretation
"But this of itself, while deserving serious consideration, cannot be determinative ... The words of a Minister must not be substituted for the text of the law ... It is always possible that through oversight or inadvertence the clear intention of the Parliament fails to be translated into the text of the law. However unfortunate it may be when that happens, the task of the Court remains clear. The function of the Court is to give effect to the will of Parliament as expressed in the law."
Applying the extrinsic statutory context in this appeal
Australia, House of Representatives, Native Title Amendment Bill 1997, Explanatory Memorandum at 184. ↑
Australia, House of Representatives, Native Title Amendment Bill 1997, Explanatory Memorandum at 184. ↑
Australia, House of Representatives, Native Title Amendment Bill 1997 (No 2), Supplementary Explanatory Memorandum at 19. ↑
Australia, House of Representatives, Native Title Amendment Bill 1997 (No 2), Supplementary Explanatory Memorandum at 19-20. ↑
Australia, House of Representatives, Native Title Amendment Bill 1997 (No 2), Supplementary Explanatory Memorandum at 23 (emphasis in original). ↑
Australia, House of Representatives, Native Title Amendment Bill 1997 (No 2), Supplementary Explanatory Memorandum at 20. ↑
Friday v Minister for Primary Industry and Resources [2021] FCA 794 at [136] per Reeves J. ↑
Friday v Minister for Primary Industry and Resources [2021] FCA 794 at [140]-[141] per Reeves J. ↑
Friday v Minister for Primary Industry and Resources [2021] FCA 794 at [177] per Reeves J. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 297 [117] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 297 [117]-[119] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 297 [120] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 298 [122] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 298 [122] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 300 [127] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 300 [128] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 300 [128] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 301 [131] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 301 [132] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 301 [130] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 309-310 [162] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 306 [149] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 306 [150] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 306-307 [152] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 307-308 [155] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 308-309 [159] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 308-309 [159] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 309 [160] per Jagot, Charlesworth and O'Bryan JJ. ↑
At the time of the amendments made to the Native Title Act, ss 85(1)(d) and 87(1) of the Mining Act 1978 (WA) were in materially the same terms. ↑
At the time of the amendments made to the Native Title Act, s 73(1)(c) of the Mining Act 1992 (NSW) did not refer to the carrying out of an "ancillary mining activity" but rather to "any mining purpose". However, the term "mining purpose" was at that time defined in cl 6 of the Mining (General) Regulation 1997 (NSW) in materially the same way as the definition now appearing of the term "ancillary mining activity". ↑
Section 14(1) of the Mineral Resources (Sustainable Development) Act 1990 (Vic), then titled the Mineral Resources Development Act 1990, was in existence at the time of the amendments made to the Native Title Act. However, at that time there was no provision for the issue of an "infrastructure mining licence". ↑
Sections 234(1)(b) and 316(2) of the Mineral Resources Act 1989 (Qld) were materially the same at the time of the amendments made to the Native Title Act, save that the Governor in Council (not the Minister) then had power to grant a mining lease for the purposes of those provisions. ↑
At the time of the amendments made to the Native Title Act, the Mining Act 1971 (SA) contained a more detailed list of purposes which a miscellaneous purposes licence could be granted for: s 52(3). They were: for the carrying on of any business that may conduce to the effective conduct of mining operations or provide amenities for persons engaged in the conduct of mining operations; for establishing and operating plant for the treatment of ore recovered in the course of mining operations; for drainage from a mine; or for the disposal of overburden or any waste produced by mining operations. But, much like the present Act, it also included "any other purpose ancillary to the conduct of mining operations". The phrase "ancillary operations" was not defined. ↑
Both ss 84(1)(a) and 106(1) of the Mineral Resources Development Act 1995 (Tas) were in existence at the time of the amendments made to the Native Title Act, although s 106(1) was confined only to a lease in respect of a former lessee in relation to land to store any building, machinery, mining product or other property on the land. ↑
Commissioner of Taxation v Reynolds Australia Alumina Ltd (1987) 18 FCR 29 at 35 per Beaumont J, 45 per Burchett J. ↑
Robe River Mining Co Pty Ltd v Federal Commissioner of Taxation (1990) 21 ATR 1068 at 1077-1079 per Lee J. ↑
(1996) 67 FCR 108 at 120 per Einfeld, Hill and Carr JJ; cf Federal Commissioner of Taxation v Resource Capital Fund IV LP (2019) 266 FCR 1 at 45-50 [145]-[161] per Besanko, Middleton, Steward and Thawley JJ. ↑
cf Mount Isa Mines Ltd v Federal Commissioner of Taxation (1954) 92 CLR 483; Federal Commissioner of Taxation v Broken Hill Pty Co Ltd (1969) 120 CLR 240; Wyong Shire Council v Associated Minerals Consolidated Ltd [1972] 1 NSWLR 114; Re BHP Petroleum Pty Ltd and Collector of Customs (1987) 11 ALD 413; Re ZZGN and Federal Commissioner of Taxation (2013) 95 ATR 831. ↑
(2012) 205 FCR 523 at 532 [39] per Emmett, Bennett and Gilmour JJ. ↑
(2012) 205 FCR 523 at 534 [47] per Emmett, Bennett and Gilmour JJ. ↑
(2012) 205 FCR 523 at 534-535 [50] per Emmett, Bennett and Gilmour JJ. ↑
Australia, House of Representatives, Native Title Amendment Bill 1997 (No 2), Supplementary Explanatory Memorandum at 19-20. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 300 [127] per Jagot, Charlesworth and O'Bryan JJ. ↑
(2004) 136 FCR 259 at 276-278 [77]-[85] per Branson J (with whom Finn J and Finkelstein J agreed on this issue). ↑
Australia, House of Representatives, Native Title Amendment Bill 1997, Explanatory Memorandum at 185 (emphasis added). ↑
On one separate occasion the words "means" and "includes" are used: see the definition of "claimant application". ↑
(1985) 157 CLR 201 at 206-207 per Mason A-CJ, Wilson, Deane and Dawson JJ. ↑
Australia, House of Representatives, Native Title Amendment Bill 1997, Explanatory Memorandum at 184. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 306 [149] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 306 [150] per Jagot, Charlesworth and O'Bryan JJ. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 306-307 [152] per Jagot, Charlesworth and O'Bryan JJ. ↑
Native Title Act 1993 (Cth), s 24MD(6A), described as "the same procedural rights as [the native title holders] would have in relation to the act on the assumption that they instead held ordinary title to any land concerned". ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 301 [130]. ↑
Native Title Act 1993 (Cth), s 24MD(6B)(b) read with the remainder of s 24MD(6B). ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 309-310 [162]. ↑
No submissions appear to have been made on this point in South Australia v Slipper (2004) 136 FCR 259. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 308 [157]. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 308 [157]. ↑
See Australia, House of Representatives, Native Title Amendment Bill 1997, Explanatory Memorandum. ↑
Australia, House of Representatives, Native Title Amendment Bill 1997 (No 2), Supplementary Explanatory Memorandum at 19. ↑
See Macquarie Dictionary, 7th ed (2017), vol 1 at 779, "infrastructure", sense 2. ↑
See The Oxford English Dictionary, 2nd ed (1989), vol 7 at 950, "infrastructure". ↑
Native Title Act 1993 (Cth), s 253 (definition of "infrastructure facility"). See YZ Finance Company Pty Ltd v Cummings (1964) 109 CLR 395 at 398-399, 403. ↑
Native Title Amendment (Technical Amendments) Act 2007 (Cth), Sch 4 item 33, amending Native Title Act 1993 (Cth), s 253 (para (i) of the definition of "infrastructure facility"). ↑
Native Title Act 1993 (Cth), s 214, repealed by Native Title Amendment (Technical Amendments) Act 2007 (Cth), Sch 4 item 29. ↑
Australia, House of Representatives, Native Title Amendment Bill 1997, Explanatory Memorandum at 184 (emphasis added). ↑
Native Title Act 1993 (Cth), s 26(1)(c)(iii)(B). ↑
Campbell and Campbell, "Why Statutory Interpretation Is Done as It Is Done" (2014) 39 Australian Bar Review 1 at 42. ↑
Corporate Affairs Commission (NSW) v Yuill (1991) 172 CLR 319 at 340. ↑
See, eg, Reniger v Fogossa (1551) 1 Plow 1 at 8 [75 ER 1 at 13]; Stradling v Morgan (1560) 1 Plow 199 at 204-205 [75 ER 305 at 312-315]; Williams v Pritchard (1790) 4 T R 2 at 3 [100 ER 862 at 862]; R v Brady (1797) 2 Leach 803 at 807 [168 ER 501 at 503]; Sussex Peerage Case (1844) 11 Cl & Fin 85 at 143 [8 ER 1034 at 1057]; Hawkins v Gathercole (1855) 6 De G M & G 1 at 22 [43 ER 1129 at 1136]. ↑
See Tasmania v The Commonwealth and Victoria (1904) 1 CLR 329 at 339; The President of the Shire of Arapiles v The Board of Land and Works (1904) 1 CLR 679 at 686; Local Board of Health of Perth v Maley (1904) 1 CLR 702 at 710; The Master Retailers' Association of NSW v The Shop Assistants Union of NSW (1904) 2 CLR 94 at 107; Higgins v Berry (1908) 6 CLR 618 at 625. ↑
Dixon v Todd (1904) 1 CLR 320 at 326-327, quoting Sussex Peerage Case (1844) 11 Cl & Fin 85 at 143 [8 ER 1034 at 1057]. ↑
Project Blue Sky Inc v Australian Broadcasting Authority (1998) 194 CLR 355 at 384 [78] (emphasis added). ↑
See, eg, Commissioner for Prices and Consumer Affairs (SA) v Charles Moore (Aust) Ltd (1977) 139 CLR 449 at 457, 461-462, 470, 476-478. cf at 479-481. ↑
(1987) 162 CLR 514 at 518. See also Catlow v Accident Compensation Commission (1989) 167 CLR 543 at 550; Nominal Defendant v GLG Australia Pty Ltd (2006) 228 CLR 529 at 538 [22]; Saeed v Minister for Immigration and Citizenship (2010) 241 CLR 252 at 264-265 [31]-[32]. ↑
Gold, "Absurd Results, Scrivener's Errors, and Statutory Interpretation" (2006) 75 University of Cincinnati Law Review 25 at 56-57, discussing Scurto v Le Blanc (1938) 184 So 567. ↑
CIC Insurance Ltd v Bankstown Football Club Ltd (1997) 187 CLR 384 at 408. ↑
See Attorney-General (Cth) v Oates (1999) 198 CLR 162 at 175 [28]; R v Hughes (2000) 202 CLR 535 at 544 [1]; Network Ten Pty Ltd v TCN Channel Nine Pty Ltd (2004) 218 CLR 273 at 280-281 [11]; Stevens v Kabushiki Kaisha Sony Computer Entertainment (2005) 224 CLR 193 at 230-231 [124]-[125]; K-Generation Pty Ltd v Liquor Licensing Court (2009) 237 CLR 501 at 521-522 [52]; SZTAL v Minister for Immigration and Border Protection (2017) 262 CLR 362 at 368 [14]; R v A2 (2019) 269 CLR 507 at 521 [32]. ↑
CIC Insurance Ltd v Bankstown Football Club Ltd (1997) 187 CLR 384 at 408. ↑
Acts Interpretation Act 1901 (Cth), s 15AB(1)(a). ↑
Acts Interpretation Act 1901 (Cth), s 15AB(1)(b)(i). ↑
Acts Interpretation Act 1901 (Cth), s 15AB(1)(b)(ii). ↑
Stubbs, "From Foreign Circumstances to First Instance Considerations: Extrinsic Material and the Law of Statutory Interpretation" (2006) 34 Federal Law Review 103 at 123. ↑
Dharmananda, "Using Parliamentary Materials in Interpretation: Insights from Parliamentary Process" (2018) 41 University of New South Wales Law Journal 4 at 34. See also at 12. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 305-307 [147]-[152]. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 307 [153]. ↑
Harvey v Minister for Primary Industry and Resources (2022) 291 FCR 263 at 307 [155]. ↑
Harvey
Minister for Primary Industry and Resources
(1986) 9 FCR 463
(1969) 121 CLR 177
(2022) 291 FCR 263
(1969) 120 CLR 240
(1996) 185 CLR 595
(2002) 213 CLR 1
(2010) 241 CLR 576
(1996) 66 FCR 1
(2013) 305 ALR 1
(2004) 136 FCR 259
(1987) 18 FCR 29
(1996) 67 FCR 108
(2019) 266 FCR 1
(1954) 92 CLR 483
(2012) 205 FCR 523
(1985) 157 CLR 201
(1964) 109 CLR 395
(1991) 172 CLR 319
(1904) 1 CLR 329
(1904) 1 CLR 679
(1904) 1 CLR 702
(1904) 2 CLR 94
(1908) 6 CLR 618
(1904) 1 CLR 320
(1998) 194 CLR 355
(1977) 139 CLR 449
(1987) 162 CLR 514
(1989) 167 CLR 543
(2006) 228 CLR 529
(2010) 241 CLR 252
(1997) 187 CLR 384
(1999) 198 CLR 162
(2000) 202 CLR 535
(2004) 218 CLR 273
(2005) 224 CLR 193
(2009) 237 CLR 501
(2017) 262 CLR 362
(2019) 269 CLR 507