[2025] VCAT 392
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-05-13
Original judgment source is linked above.
Overshadowing of the private open space of 28 Simpson Street
Overlooking into windows and the rear yards of 28 and 32 Simpson Street
(a) allow adequate daylight into existing habitable room windows of the houses at 28 and 32 Simpson Street;
(b) allow adequate solar access to existing north-facing habitable room windows of the house at 28 Simpson Street;
(c) not unreasonably overshadow the existing SPOS of the house at 28 Simpson Street;
(d) limit views into existing SPOS and habitable room windows of the houses at 28 and 32 Simpson Street;
(e) limit the visual impact on the amenity of the houses at 28 and 32 Simpson Street.
Construct or extend one dwelling on a lot less than 300 square metres, in the General Residential Zone - Schedule 2.
(a) The ground and first floor plan updated to include accurate site conditions as related to numbers 28 and 32 Simpson Street.
(b) The first floor, Bedroom 4 (north elevation) modified to comply with Standard A10 at Clause 54.04-1 of the Darebin Planning Scheme (Side and rear setback objective). Wall heights and setbacks must be clearly shown on elevations and floor plans. No other setbacks are to be reduced, or wall heights increased as a result.
(c) The wall on the northern boundary finished in a light coloured, non-reflective finish/material.
(d) Update the notation regarding the proposed finish 'EF-03' to confirm the screen will be:
- a permanently fixed external screen to at least 1.7 metres above floor level; and
- be a perforated panel with a maximum of 25 per cent openings or solid translucent panel.
(e) Update the notation regarding the proposed finish 'EF-04' to refer to fixed obscure glazing not film applied to the internal side of the glazing.
(f) Annotations detailing Tree Protection Zone(s), associated tree protection fencing and tree protection measures in accordance with the requirements of Condition No. 3 and 4 of this Permit.
When approved, the plans will be endorsed and form part of this Permit.
*As defined in the Arborist report, prepared by BTC Tree Concepts, dated 18 July 2023.
(a) Trees 3 and 4:
- Decking footings must be aligned away from larger roots to limit the impact on trees.
- Footings must be dug using a non-destructive method such as manual, pneumatic, or hydro excavation.
- If excavation for the footings exposes roots greater than 45mm in diameter, the footing must be realigned to an area of no root ingress. Roots less than 45mm in diameter may be pruned by the project arborist to facilitate the footing.
- Footing excavation must be undertaken under the supervision and direction of an arborist qualified to a minimum of AQF level V in arboriculture.
(b) Existing boundary fence is to act as tree protection for Tree 5.
(c) All services must be routed outside 'Tree Protection Zones'. If there is no alternative to passing through the protection zone, the local authority and the consulting arborist must be advised in writing on the need for directional boring beneath root zone; this must be maintained at a minimum depth of 45cm in soil depth when inside the TPZ of a retained tree.
(d) All tree protection zones must be observed according to Australian Standard AS4970-2009 Protection of trees on development sites. Tree protection zones are to be shown all plans and must be put in place before any works occur on site.
(e) All other tree protection measures are to accord with the recommendations with the arborist report referred to in condition No. 3 of the Permit.
(a) concealed in service ducts or otherwise hidden from view; or
(b) located and designed to integrate with the development,
(a) The development is not started within three (3) years of the issued date of this permit.
(b) The development is not completed within five (5) years of the issued date of this permit.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition
[1] Nearmap image dated 17 April 2025; the site is identified by a red star.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] Having regard to the decision guidelines at clause 65 of the Darebin Planning Scheme.
[4] Measured using Nearmap aerial image dated 17 April 2025.
Harvey
Darebin CC [2025] VCAT 392