[2011] VCAT 2264
Victorian Civil and Administrative Tribunal
2011-12-02
Ms J
Original judgment source is linked above.
There is extensive algae staining at the underside of the gutter at the north-east corner, indicating that the gutter retains stormwater and is leaking. The lack of downpipes and the restrictive size of the blocked spreader pipe, are contributing factors to the leaking spouting. (please refer to Photograph 033 to 035 and 038 to 040 ...)
Remove the existing downpipe and spreader. Flush out downpipe and re-install. Install new larger spreader with more outlet holes. Install additional downpipe and spreader approximately half way along. Repair leak to the gutter at the north east corner. Provide falls in gutters towards the outlets to ensure no stormwater is retained. Estimated cost $2,000 to $2,200.
At the time of the inspection, a bucket of water was emptied on to the floor at the southern end of the balcony. Some of the water found its way to the outlet near the NW corner and disappeared, presumably draining into the stormwater system. A large quantity of water remained and ponded on the surface to a depth of 20-25mm. After 30 minutes, the water was still there. This demonstrates that the fall on the balcony floor was insufficient to drain the water towards the outlet.
Due to lack of fall to the outlet, water is ponding in the gutter, making use of the balcony difficult and making the building materials vulnerable to seepage. This in turn can cause moisture damage to tiles and grout and rot to the timber weatherboards. Note: The reflection on the balcony floor shows the presence of water and water stains with rot to the door sill and weatherboards under it. (please refer to Photograph 001 to 003...)
Repairs to the balcony, including tiles, removal of the sub-strata and weatherboard and wall plate where there is rot damage. Installation of new waterproof membrane, plus new flooring and skirting tiles to the base. Ensure all tiles are laid to recommended falls to the outlet. Estimated cost $2,800 to $3,000.
We did detect a depth variation in the surface of the balcony tiled floor ... [1]
This variation in level is attributed to drying of the timber frame used to construct the [balcony] floor.
[1] Mr Smallman's report was printed out with text flaws. Certain words appear to have been printed over other words. It was not possible to read by how much.
Graham
Marinovic & Anor
Issue estoppel differs from res judicata in that res judicata relates to the entire claim, rather than just one issue: Hoystead v Cmr of Taxation (Cth) [1925] UKPCHCA 3; (1925) 37 CLR 290.
(1925) 37 CLR 290