Goal Number 4 Pty Ltd v Bayside CC [2011] VCAT 2376
Mr J. Patrick, Landscape Architect, John Patrick and Associates
Mr M. Sheppard, Urban Designer, David Lock and Associates
Development of a four storey building containing 112 apartments, 300 square meters of office and 130 car parking spaces.
Clause 32.01-4: Construct more than one dwelling on a lot in R1Z.
Clause 44.05: Construct buildings and works in SBO.
Clause 52.06 -: Reduction in standard parking provision.
Clause 52.29: Alter/create access to a road in a Road Zone category 1.
Clauses 11, 13, 15, 16, 17, 18, 21.02, 21.03, 21.05, 21.06, 21.07, 21.09, 22.04, 45.03, 52.06, 52.07, 52.29, 52.36, and 65.
The site it is located on the south side of Bay Road roughly mid block between Bluff Road and Reserve Road. The land comprises a rectangular lot with a frontage of 27.43 metres and an overall area of just under 4,464 square metres. A single storey industrial building occupies the land. Surrounding land use include a vacant property to the east (2.35 ha) which has approval to be redeveloped for 453 apartments, and a cafe within three buildings ranging in height from 4 to 8 storeys. An industrial property which is subject to an application for redevelopment for apartments within 5-6 storey buildings, exists to the west. Sandringham Secondary College exists to the south whilst industrial uses and dwellings exist to the north on the opposite side of Bay Road.
228 Bay Road Pty Ltd v Bayside CC [2010] VCAT 2062
Cremorne Properties Pty Ltd V Yarra CC [2008] VCAT 1202
(Reasons given orally at the hearing but subsequently revised)
Is there strategic support for the redevelopment of this site for an intensive residential use?
The panel clearly encourage a mix of residential and business uses within the area it recommended to being included in a mixed use zone and they did not recommend that the affected area be deleted from the business employment area policy. However, neither did the panel recommend special policy provisions to constrain the exercise of discretion, in respect of the affected land in this regard.
The amendments to the MSS and clause 25.05 [sic] which form part of Amendment C39 Part 3 did contain more specific policies in respect of the land use mix to be achieved, but as we have already observed, do not conclude that the mix of uses on any individual site should include a significant or predominant proportion of employment generating uses.[5]
Is the form of the proposed building is acceptable?
Is satisfactory amenity provided for future residents?
The Construction Management Plan must be implemented to the satisfaction of the Responsible Authority. The Construction Management Plan must not be modified unless with the prior written consent of the Responsible Authority.
The Parking Management Plan must be implemented to the satisfaction the Responsible Authority. The Parking Management Plan must not be modified unless with the prior written consent of the Responsible Authority.
The Waste Management Plan must be implemented to the satisfaction the Responsible Authority. The Waste Management Plan must not be modified unless with the prior written consent of the Responsible Authority.
Design details of the water sensitive urban design stormwater treatment measures, including cross sections.
Car spaces, access lanes and driveways must be kept available for these purposes at all times to the satisfaction of the Responsible Authority.
The flood level for the property is 30.24 metres to Australian Height Datum (AHD).
(a) the use and development and use are not started within two years of the date of this permit.
(b) the development is not completed within six years of the date of this permit.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires, or within three months afterwards.
[1] The areas of concern relate to the height, length and overall size of the building; inadequate setbacks and opportunity for landscaping.
[3] See 228 Bay Road Pty Ltd v Bayside CC
[4] The policy was set out at Clause 22.05 at the time, however, it is now at Clause 22.04.
[6] The design principles at Clause 15.01-2 require that "Development must take into account the natural, cultural and strategic context of its location".
[7] [2008] VCAT 1202 see paragraphs 63-69