[2026] VCAT 197
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-03-24
Original judgment source is linked above.
Stormwater Drainage Plan Prerequisite Requirements
(a) The use of an On-site Stormwater Detention (OSD) system;
(b) The connection to the Council nominated Legal Point of Discharge;
(c) The outfall drainage works necessary to connect the subject site to the Council nominated Legal Point of Discharge;
(d) The integration, details and connections of all Water Sensitive Urban Design (WSUD) features in accordance with the Environmentally Sustainable Design (ESD) and STORM report and include drainage details as a result of landscaping;
(e) A suitably prepared design with computations for the internal drainage and method of disposal of stormwater from all roofed areas and sealed areas;
(f) All drainage plans must show proposed trees to be planted in accordance with the landscape plan submitted with the application.
(a) A Stormwater Drainage Plan in accordance with Condition 1.
(b) The proposed changes to the Sustainability Management Plan including:
(i) A minimum 5kW roof mounted solar photovoltaic system
(ii) The proposed rainwater tank location, capacity and a notation stating that the tank will be connected to toilet flushing
(iii) The location of the rainwater treatment plant
(iv) Adjustable shading devices to west facing windows on levels 1, 2 and 3
(c) A Waste Management Plan in accordance with Condition 16
(d) A Construction Management Plan in accordance with Condition 26.
(e) A Water Sensitive Urban Design Response in accordance with Condition 28
(f) A Sustainable Design Assessment in accordance with Condition 29
(g) Any changes required by the Sustainable Design Assessment.
(h) All external doors (including those to external terraces) must be fitted with self-closing hinges designed to pull the door closed after it is opened.
Noise levels emanating from the use must comply with condition 5.
The cost of the assessment is to be borne by the owner or occupier. If necessary, additional noise control features must be installed in consultation with an acoustic engineer, or activities and noise sources on the premises regulated at the direction of and to the satisfaction of the responsible authority. The frequency of this request will be at the discretion of the responsible authority.
(a) Transport of materials, goods or commodities to or from the land; and/or
(b) Appearance of any building, works, stored goods or materials; and/or
(c) Emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, ash, dust, waste water, waste products, grit or oil; and/or
(d) The presence of vermin; or in any other way
Monday to Friday: 1:00pm - 4:00pm & 7:00pm - 10:00pm
Saturday, Sunday & Public Holidays - 1:00pm - 10:00pm
(a) the type/s and number of waste bins;
(b) screening of bins;
(c) type/size of trucks;
(d) the timing and frequency of waste collection;
(e) plan showing the layout of the bins at collection time and measures for the delivery and retrieval of bins for collection;
(f) If collection is to occur within the basement how this will be managed with car parking to ensure that there are car spaces available to facilitate turning movements.
(g) whether collection is by private waste contractor or council service to the satisfaction of the responsible authority.
(a) Properly paved and drained to a legal point of discharge;
(b) Screened from view with a suitably designed enclosure;
(c) Supplied with adequate hot and cold water; and
(d) Maintained in a clean and tidy condition free from offensive odours to the satisfaction of the responsible authority.
Waste collection must occur Monday - Friday, between the hours of 8:00am - 4:30pm.
(a) Hours for construction activity in accordance with any other condition of this permit;
(b) Measures to control noise, dust, water and sediment laden runoff;
(c) Measures relating to removal of hazardous or dangerous material from the site, where applicable;
(d) A plan showing the location of parking areas for construction and subcontractors' vehicles on and surrounding the site, to ensure that vehicles associated with construction activity cause minimum disruption to surrounding premises. Any basement car park on the land must be made available for use by sub-constructors/tradespersons upon completion of such areas, without delay;
(e) A Traffic Management Plan showing truck routes to and from the site;
(f) Swept path analysis demonstrating the ability for trucks to enter and exit the site in a safe manner for the largest anticipated truck associated with the construction;
(g) A plan showing the location and design of a vehicle wash-down bay for construction vehicles on the site;
(h) Measures to ensure that sub-contractors/tradespersons operating on the site are aware of the contents of the construction management plan;
(i) Contact details of key construction site staff;
(j) A site plan showing the location of any site sheds, on-site amenities, building waste storage and the like, noting that Council does not support site sheds on Council road reserves; and
(k) Any other relevant matters, including the requirements of VicRoads and Yarra Trams.
(a) A site plan showing the location of proposed stormwater treatment measures and the location and area (square metres) of impermeable surfaces that drain to each treatment measure.
(b) A written statement outlining how the application achieves current best practice performance objectives for stormwater quality as contained in the Urban Stormwater - Best Practice Environmental Management Guidelines (1999). Please note that for the modelling requirement you can use the following free program to demonstrate best practice, which is equivalent to a score of 100% or more.
(c) If any water tank is proposed, the plans must indicate the tank's capacity in litres and what the tank is connected to (e.g. toilets).
(a) BESS credit Water credit amended to include the showers water rating
(c) Details on the potential water contaminants resulting from using the terrace as rainwater catchment area, the relevant water treatment measures proposed upstream and downstream the tanks, and their effectiveness in achieving the required water quality suitable for the end use. Also provide a maintenance plan, stating periodic actions, requirements and responsibilities.
(a) The development does not start within three (3) years of the issue date of this Permit; or
(b) The development is not completed within five (5) years of the issue date of this Permit; or
(c) The use does not commence within three (3) years of the completion of the development.
In accordance with section 69 of the Planning and Environment Act 1987, an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] In accordance with the City of Boroondara Schedule of Gradings Map (2024), a contributory site is defined as a place that contributes to the significance of a precinct when combined with other significant or contributory heritage places.
[2] The submissions and any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[10] Council advised that a 40 patron Place of Assembly generates a minimum car parking requirement of 0 spaces and maximum of six car parking spaces. This figure is based on a rate of 0.15 spaces per patron. Therefore, the provision of one on-site car space meets the statutory requirements of Clause 52.06.
[11] At [5.22] of Council's submission.
[14] Permit BOR/01/00347 was issued in 2001 for the construction of alterations and extensions to an existing education centre (music examinations) and to reduce the car parking requirement.
[15] Noise limit and assessment protocol for the control of noise from commercial, industrial, and trade premises, and entertainment venues, Publication 1826.5 (September 2025).
[16] Condition 5 of Planning Permit BOR/01/00347.
[17] By One Mile Grid (10 September 2025).
Gnaw Architecture Pty Ltd