APPEAL 1 - Appeal made under s 142(2)(d) of the Building Act 1993 by the owner of the building or land against the failure by the relevant building surveyor, within a reasonable time, to amend or cancel a building order dated 19 July 2024.
APPEAL 2 - Appeal made under s 142(2)(d) of the Building Act 1993 (the Act) by the owner of the building or land against the failure by the relevant building surveyor, within a reasonable time, to amend or cancel a building order dated 28 June 2024.
APPEAL 3 - Appeal made under s 142(2)(d) of the Act by the owner of the building or land against the failure by the relevant building surveyor, within a reasonable time, to amend or cancel a building order dated 2 November 2023.
APPLICANTS Ellen Glenton and Timothy Glenton (Subject Land owners)
RESPONDENT Municipal building surveyor for the Golden Plains Shire
RELEVANT MUNICIPALITY Golden Plains Shire Council
BEFORE Members J Shaw (panel chair) and G Woolcock
CITATION Glenton & Anor v Municipal Building Surveyor for the Golden Plains Shire [2025] VBAB 69
Having considered all the submissions and information placed before it, the Building Appeals Board (BAB) determines that:
(a) By 31 July 2025, the Applicants must carry out such building work as is necessary to bring the building under construction located on the north-east corner of the land at 24 William Court, Berringa, Victoria (Subject Land), into substantial compliance with the requirements of a class 10a building pursuant to the Building Code of Australia, 2022 edition, noting that the Applicants must first obtain a building permit pursuant to Part 3 of the Act for any building work for which such a permit is required;
(b) By 31 July 2025, the Applicants must remove the two sheds which are located in the south-east corner of the Subject Land.
_______________________ ________________________
(a) a building of approximately 90m2 in the north-east corner (Building);
(b) two pre-fabricated steel sheds in the south-west [confirm] corner, each of approximately 9m2 (Sheds).
(c) sleeper retaining walls (Retaining Walls);
(d) two rows of posts in and adjacent to a dam in the north-west corner (Posts);
(e) planter boxes (Planter Boxes).
(a) a building order to stop work dated 2 November 2023 issued pursuant to s 112 of the Act (November 2023 Stop Work Building Order);[2]
(b) a building notice dated 3 November 2023 made pursuant to s 106 of the Act (November 2023 Building Notice);[3]
(c) a building order to stop work dated 28 June 2024 issued pursuant to s 112 of the Act (June 2024 Stop Work Building Order);[4]
(d) a building order dated 19 July 2024 served pursuant to s 111 of the Act (July 2024 Building Order).[5]
(a) the July 2024 Building Order, which is referred to as 'Appeal 1' in the 'Nature of Proceedings', and is the appeal in proceeding number 456356;
(b) the June 2024 Stop Work Building Order, which is referred to as 'Appeal 2' in the 'Nature of Proceedings', and is the first appeal in proceeding number 456436;
(c) the November 2023 Stop Work Building Order, which is referred to as 'Appeal 3' in the 'Nature of Proceedings', and is the second appeal in proceeding number 456436.
(a) A document titled Applicant's [sic] Statement of Contentions dated 28 November 2024 in respect of Appeal 1 (Applicants' Appeal 1 Contentions);[11]
(b) A document titled Applicant's [sic] Statement of Contentions dated 14 January 2025 in respect of Appeal 2 (Applicants' Appeal 2 Contentions);[12] and
(c) A further document titled Applicant's [sic] Statement of Contentions dated 14 January 2025 in respect of Appeal 3 (Applicants' Appeal 3 Contentions);[13]
(a) A document titled Respondent's Statement of Contentions dated 24 January 2025 in respect of Appeal 1 (MBS's Appeal 1 Contentions);[14] and
(b) A document titled Respondent's Statement of Contentions (Appeals 2 and 3) dated 7 February 2025 in respect of Appeal 2 and Appeal 3 (MBS's Appeal 2 & 3 Contentions).[15]
(2) The owner of a building or land may appeal to the Building Appeals Board against -
(d) a failure, within a reasonable time, to amend or cancel that order; ...
To facilitate this, we request that pursuant to s 116 of the Building Act 1983 the above building order be cancelled, and if appropriate a new building order be issued. In support of this we say that the change of circumstances includes the notice being served at the incorrect address. Furthermore, we note there was an unaccompanied site inspection on Monday 7 October 2024 which will have provided Council a good deal of additional information.
As matters currently stand in relation to the Interim Dwelling, Council does not agree to cancel any of the notices or orders it has issued. Your clients should immediately provide to Council copies of the plans and other documents that accompany the building permit issued by Mr. Reardon, together with an explanation of how the building will be brought into compliance and the current contravening use will be discontinued. Council will assess those documents and then consider what the appropriate next steps should be.
At paragraph 20 of your letter you indicate that as matters currently stand in relation to the Interim Dwelling, Council does not agree to cancel any of the notices or orders as issued. Could you please clarify if this means that upon further review of the materials provided Council will reconsider its position. We believe it is important to clarify this as appeal rights to the BAB have time limits, which must be adhered to.
In these circumstances, given that your client has no lawful way of living on the property until her permanent dwelling is constructed, Council sees itself to have no alternative but to continue to investigate this matter with a view to taking enforcement action under the Building Act. Accordingly, Council's investigators will be in contact with you or your client shortly.
This information was being sought to clarify whether there had been a
refusal, pursuant to section 142(2)(c) of the Act upon which an application for appeal could be made, or whether the Applicants needed to wait for a failure within a reasonable time to occur so as to apply pursuant to 142(2)(d). Ultimately the Applicants relied on 142(2)(d).
1.1 Demolish and remove the building under construction located on the north-east corner of the allotment; and
1.2 Demolish and remove the two sheds which are located on the south-east corner of the allotment.
116 Amendment or cancellation of certain building orders
(1) An owner who is required to comply with a building order may, if there is a change in circumstances after the service of the order, request the relevant building surveyor to amend or cancel the building order.
(2) On a request being made, the relevant building surveyor may -
(3) The relevant building surveyor is taken to have refused a request under this section if he or she has not decided the request within the prescribed time.
(4) The relevant building surveyor must inform the owner in writing without delay of the relevant building surveyor's decision under subsection (2).
(a) the July 2024 Building Order was served at 'the incorrect address'; and
(b) an 'unaccompanied site inspection' took place on 7 October 2024 'which will have provided Council a good deal of additional information', and that as a result of the inspection the MBS may 'wish to include further matters in a re issued/new s 111 building order; or issue a new building notice [sic]'.
(1) The classification of a building or part of a building is determined by the purpose for which it is designed, constructed or adapted to be used.
(2) Each part of a building must be classified according to its purposes and comply with all the appropriate requirements for its classification.
(a) the features of the building;
(b) the features that are associated with the Building;
(c) the timing and location of its construction; and
(d) the use of the Building by the owners.
(a) the Building is 'no longer used in conjunction with or [in] association with a caravan that was previously sited' on the Subject Land;
(b) the Building 'is not and could not be a place of abode nor a dwelling as it does not contain operational cooking facilities, toilet facilities or bedrooms';
(c) the electricity that has been observed in the Building is supplied to an external meter box, and internal electricity is obtained by the use of extension cords. The Applicants notes that there is no internal wiring within the walls of the Building;
(d) in reaching the conclusion that the Building is a class 1a building, the Respondent failed to make any enquiries of the Applicants and did not reach the conclusion with the assistance of any building plans.
(a) she considers the Building to be a shed, and that there is a 'significant movement for women having 'she -sheds';
(b) she intends to use the Building for a number of crafts;
(c) one such craft involves soaking animal hides in water in a bath, perhaps also containing fire ash, in order to tan the hides and to make shamanic drums with them;
(d) the fridge and shelving are for preserves and meat products produced on the Subject Land;
(e) the middle area of the Building is to be used to dry her extensive range of herbs in a relatively dust and dirt-free environment;
(f) there is a space for drying hoops for the samanic drums, and she intends to install shelving to place the hoops while they cure;
(g) the larger space is intended as an area to roll the hoop around a mould and to clamp them down;
(h) the couch is in the Building because it would not fit into the container she has.
(a) the Applicants to carry out such building work as is necessary to bring the Building into compliance with the BCA with respect to a class 10a building. We note that if such building work requires a building permit, then the Applicants must first obtain such a permit;
(b) the Applicants to remove the Sheds.
(a) the construction of the Retaining Walls is greater than 1m in height;
(b) the construction of the Planter Boxes and retaining wall exceeds 1m in height; and
(c) the Poles in the dam had been constructed for the purposes of supporting a deck.
(a) Construction of the deck/structure within the dam: The Applicants submit that the Poles that have been installed in or adjacent to the dam because the Applicants had had excess concrete on site when they constructed the retaining walls. They submit that they had no intention as to what the Poles were to be used for when they installed them, but they say that there is no intention to construct a deck. The Applicants submit that the Respondent simply assumes that a structure will be constructed on the Poles, yet that is not the Applicants' intention. The Applicants also submitted that if they form an intention to construct a deck or similar structure at some point in the future, then they understand that a building permit would be required for that. On balance we accept the Applicants' submissions that no building permit was required to the installation of the Poles, and we also accept their submissions that they have no intention to construct a deck or similar structure on those poles. Therefore, we will cancel the June 2024 Stop Work Building Order in respect of the Poles in and adjacent to the dam. However, the Applicants clearly must obtain a building permit for any structure that is built in the future using the Poles that have been installed.
(b) Retaining walls: The Applicants submit that the Retaining Walls have been completed, and therefore there is no building work to stop. Further, they submit that in any event the height of the Retaining Walls is less that 1m, meaning that no building permit for their construction was required. The Respondent submits that the height of the Retaining Walls is greater than 1m, meaning that a building permit should have been in place prior to their construction. We accept the submissions of the Applicants that the Retaining Walls are complete, and therefore there is no building work to stop. For that reason alone we are satisfied that the June 2024 Stop Work Building Order in respect of the Retaining Walls should be cancelled. Further, it appears to us that the height of the Retaining Walls is around 1m maximum, and that the extent to which this height is exceeded is limited, both in terms of the height and the length of the wall that exceeds 1m. in these circumstances it is not clear to us that the Retaining Walls actually required a building permit prior to their construction. In any event, it seems to us that the appropriate course of action, should the MBS be concerned about the structural integrity of the Retaining Walls, would be to serve a building notice and building order in respect of those structures pursuant to ss 106 and 111 of the Act, rather than a building order to stop work.
(c) 'any other Building Work': The Applicant objects to the breadth of the order in paragraph 1.4 of the June 2024 Stop Work Building Order, in that, the Applicants submit, it prevents any building work being carried out on the Subject Land. The Respondent submits that paragraph 1.4 needs to be read in context with the other paragraphs, and those other paragraphs define the building work referred to in paragraph 1.4.
We accept the Applicants' submissions, and consider that paragraph 1.4 lacks specificity, as it does not refer to the particular building work required to be stopped, and because it, on its face, applies to any building work on the Subject Land. Therefore, we will cancel paragraph 1.4 of the June 2024 Stop Work Building Order.
[1] Clause 17 of Schedule 3 to the Building Act 1993 provides: 'Unless the Building Appeals Board otherwise determines, a party to a proceeding before the Board must bear his, her or its own costs'.
[8] The 31 October 2024 letter (at TB 483-485) is marked 'without prejudice', but in the Applicants' Reply they waive that privilege (to the extent that it applies to the document) (TB 147). In the MBS's Appeal 1 Contentions, the MBS does not assert that he maintains any privilege over the document, and states that the 'Applicant [sic] should not be permitted to rely on the 31 October 2024 letter unless the letter is fully disclosed in the proceeding' (TB 122). On the basis of the above statements by the parties, we will allow the 31 October 2024 letter to be relied on, and we will take it into consideration in our determination.
[17] Thurin v Krongold Constructions (Aust) Pty Ltd [2022] VSCA 226, [128]; Mirvac Victoria Pty Ltd v Building Appeals Board [2024] VSC 782, [64].
[26] Building Code of Australia - Volume 2, cl A6G1(1).
�Glenton & Anor