[2010] VCAT 268
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2010-03-17
Original judgment source is linked above.
"... [an] existing dwelling which has been on this site since the soldier settlement period of development.
The loss of existing use rights for this dwelling does not somehow change the description of what exists on the site to a shed, structure or some other description. It is clearly a dwelling.
A building used as a selfcontained residence which must include:
It includes out-buildings and works normal to a dwelling.
[13] It is also important when considering whether the land is used as a dwelling not to be distracted by the form of buildings on the land. Just because there is a house on the land does not necessarily mean that it is being used as a dwelling. The house on the subject land may well be used as a residence in other circumstances, but it is not being so used at present. The use of land for planning purposes is not determined by the style of development but the purpose for which the land is actually used. Thus it is fallacious to say that because there is a house on the land ipso facto the land is being used as a dwelling.
To encourage development and use of the land which is consistent with sustainable land management and land capability practices, and which takes into account the conservation values and environmental sensitivity of the locality.
Permit for construction of a building under the ESO1
Any alterations or new works must be completed in accordance with the Act and Regulations including submission for and receipt of any necessary building permits before any works requiring a permit commence.
Permit for works associated with waste water management system
The relevant water board or water supply authority.
Any relevant water authority under the Water Act 1998 and if more than one, to each authority.
Any buildings or works that, in the opinion of the responsible authority, do not satisfy the environmental objective of this schedule.
An application for development within 100 metres of the full supply level of any domestic water supply reservoir, or within 100 metres of any waterway within the catchment area.[12]
[1] Clause 35.06-1 of the Hepburn Planning Scheme.
[2] These requirements are not relevant for present purposes as part of this proceeding.
[3] For example, Cotsonis v Darebin CC [2005] VCAT 232
[4] Armato v Hepburn SC [2007] VCAT 603
Because a use is in Section 2 does not imply that a permit should or will be granted. The responsible authority must decide whether the proposal will produce acceptable outcomes in terms of the State Planning Policy Framework, the Local Planning Policy Framework, the purpose and decision guidelines of the zone and any of the other decision guidelines in Clause 65.
[6] Under section 113 of the Building Act 1993 dated 23 July 2007
[8] Prepared by P E J Consulting (March 2008)
[9] Under clause 71 of the planning scheme a term has its ordinary meaning unless that term is defined, inter alia, in the Planning and Environment Act 1987 or defined differently in the scheme. Section 3(1) of the Planning and Environment Act 1987 defines works as follows:
works includes any change to the natural or existing condition or topography of land including the removal, destruction or lopping of trees and the removal of vegetation or topsoil.
[10] For example, see Rozen v Macedon Ranges SC [2009] VCAT 2746
[12] See also clause 5.0 of schedule 1 to the Environment Significance Overlay.
[13] Under section 54 of the Planning and Environment Act 1987
Gerdes
Hepburn SC