[2025] VCAT 401
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-05-13
Original judgment source is linked above.
Is the proposal to restrict the entry to the site from Keilor Road necessary to achieve an acceptable traffic management outcome?
Appropriate signage at the property boundary indicating only left-in vehicular access from Keilor Road.
Use of the land as a child care centre, in the Commercial 1 Zone.
To construct a building or construct or carry out works, in the Commercial 1 Zone.
To construct a building or construct or carry out works, in the Design and Development Overlay - Schedule 7.
To construct or put up for display signs with a display area exceeding 8 square metres.
To construct or put up for display a flood lit sign.
(a) details of all acoustic fencing along the northern property boundary in product that has a similar acoustic attenuation of at least 28 dB;
(b) details and colours of all business identification and directional signs, including signs indicating that the car spaces adjoining existing columns are to be staff car spaces;
(c) the gates across the vehicle access from Keilor Road shown to open inwards to the site;
(d) the gradients of all ramps to be provided;
(e) all line marking and directional signs located within the parking area;
(f) dimensions of the disabled car space and shared area in accordance with AS2890.6-2022, including the bollard location;
(g) all STORM annotations and measures in accordance with Condition 3;
(h) all BESS annotations and measures in accordance with Condition 4;
(i) an amended Landscape Plan in accordance with Condition 7;
(j) any changes as required under the Waste Management Plan in accordance with Condition 8; and
(k) any modifications and requirements in accordance with Department of Transport and Planning Condition 10.
When approved, these plans will be endorsed and will form part of this permit.
(a) Inspection frequency;
(b) Cleanout procedures;
(c) As installed design details/diagrams including a sketch of how the system operates; and
(d) A report confirming completion and commissioning of all WSUD Response treatment measures written by the author of the WSUD Response and STORM or MUSIC model approved pursuant to this permit, or licensed installing/commissioning plumber, or similarly qualified person or company. This report must be to the satisfaction of the Responsible Authority and must confirm that all WSUD treatment measures specified in the WSUD Response and STORM or MUSIC model have been completed and implemented in accordance with the approved report.
The WSUD Maintenance Program may form part of a broader Maintenance Program that covers other aspects of maintenance such as a Building User's Guide or a Building Maintenance Guide.
(a) Any changes in accordance with Condition 1 of this permit;
(b) Raised planters with greening within the outdoor play areas, including small trees for canopy and shade;
(c) All Shrubs and trees selected for the play space must be safe for children. Avoid plant species that risk the health, safety and welfare of the facility's occupants, such as those which:
- are known to be poisonous, produce toxins or have toxic leaves or berries; or
- have seed pods or stone fruit, attract bees, have thorns, spikes or prickly foliage or drop branches;
(d) All Environmentally Sustainable Design (ESD) design solutions in accordance with the successful STORM/BESS report/s.
When approved the amended landscape plan and schedule will be endorsed and will form part of this permit.
Landscaping in accordance with the endorsed landscape plan and schedule must be completed before the building is occupied.
When approved, the CSMP will be endorsed and will form part of this permit. The development must be carried out in accordance with the endorsed CSMP and the provisions, requirements and recommendations of the endorsed CSMP must be implemented and complied with to the satisfaction of the Responsible Authority.
Department of Transport and Planning Conditions
If an application for subdivision of the land in accordance with the development approved by this permit is submitted to Council, payment of the Development Infrastructure Levy can be delayed to a date being prior to the issue of a Statement of Compliance for the subdivision.
All vehicle access points must be located a minimum of 1.0 metre from any infrastructure including service pits. Alternatively, such assets may be incorporated into the crossover with the prior written consent of the Responsible Authority and the relevant servicing authority/agency. Subsequent works and costs in association with relocation and/or amendment must be incurred at the owner's cost, to the satisfaction of the relevant servicing authority/agency and the Responsible Authority.
(a) constructed;
(b) available for use in accordance with the endorsed plans;
(c) line marked or provided with other adequate means of ensuring that the boundaries of vehicle spaces are clearly indicated on the ground;
(d) properly formed to such levels and drained so that they can be used in accordance with the endorsed plans; and
(e) finished with a permanent trafficable surface (such as concrete, asphalt or paving);
in accordance with the endorsed plans to the satisfaction of the Responsible Authority.
The area set aside for the parking of vehicles, together with the associated driveways and access lanes as shown on the endorsed plans must be maintained and made available for the approved use and not be used for any other purpose.
(a) Transportation of materials, goods or commodities to or from the land;
(b) Appearance of any building, works or materials;
(c) Emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot ash, dust, waste water, waste produces, grit or oil;
(d) Disposal of waste, including disposal of glass bottles, etc.; and
(e) Presence of vermin;
or in any other way, to the satisfaction of the Responsible Authority.
(a) The development is not started within two (2) years of the issued date of this permit.
(b) The development is not completed within four (4) years of the issued date of this permit.
(c) The use does not start within two (2) years of completion of the development.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] Jean Paul Maina's evidence statement (8 January 2024); Figure 2; 10.
[3] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all this material will be cited or referred to in these reasons.
[4] With the agreement of the parties and the Tribunal, Sam D'Amico was not called to give oral evidence at the hearing.
[5] Having regard to the decision guidelines at clause 65 of the Scheme.
[6] John Paul Maina's written evidence statement (8 January 2025), 6.
[7] Jason Walsh's written evidence statement, (8 January 2025), [99].
[10] John Paul Maina's written evidence statement, (8 January 2025), [49].
[11] Jason Walsh' written evidence statement, (8 January 2025), [ [99].
[12] Based on Figure 2.8 of Australian Standard 2890.1:2004.
[13] Jason Walsh's oral evidence at the hearing.
[14] Jason Walsh's written evidence statement (8 January 2025), [95].
[15] Jason Walsh's written evidence statement (8 January 2025), Appendix C.
Ganbro Properties Pty Ltd
Moonee Valley CC [2025] VCAT 401