TRIBUNAL'S FINDINGS ON P2707/2017 PLANNING MERITS APPEAL
The amendment is needed to allow the re-subdivision of two old and inappropriate subdivisions at Olivers Hill Frankston South (Schedule 2 of the Design and Development Overlay does not allow the creation of lots of less than 2,500 square metres even where it involves the re-subdivision of existing lots).
The proposed subdivisions will rationalise a number of titles, provide appropriate road frontage and proper access, create lots with an orientation that better responds to steep slopes, provide road connections to allow subdivision of adjoining land and minimise the need for additional access points to Nepean Highway. Both subdivision proposals have merit and represent improvements on existing lot configurations and access arrangements.
The proposed subdivisions will rationalise a number of titles, provide appropriate road frontage and proper access, create lots with an orientation that better responds to steep slopes, provide road connections to allow subdivision of adjoining land and minimise the need for additional access points to Nepean Highway. Both subdivision proposals have merit and represent improvements on existing lot configurations and access arrangements.
The Buildings and works (new section of road to be built on subject land)
TRIBUNAL'S FINDINGS ON P2928/2017 CONDITIONS APPEAL
(a) will comprise the section of road to be constructed in the location shaded pink on the Plan of Creation of Easement prepared by Lawlor and Loy Vic Ptd Ltd, Ref 7878-CE, Version 2 (Plan of Creation of Easement); and
(b) will provide a connection to the existing all-weather trafficable road shaded green on the Plan of Creation of Easement.
When approved, the plan will be endorsed and will then form part of this permit.
Maps or plans forming part of the 'Offset Management Plan' must be drawn to scale with dimensions (where appropriate). The plan must include:
(a) A description of the existing vegetation (including but not limited to location, area (ha), Conservation Status, EVC. Habitat ha assessment, LOT, any rare or threatened fauna/flora etc.) be removed and any vegetation to be retained.
(b) Provision for off-set of .001 general biodiversity equivalent units.
(c) A description and location of the proposed offset site.
(d) A description of the type of offsets to be provided.
If the offset is to be met by the purchase of offset credits this must occur and the appropriate credit receipt provided to the Responsible Authority before the vegetation is removed. If offsets are to be provided on site the owner must meet any conditions for such as may be required by the Responsible Authority which must include entering into an agreement under section 173 of the Planning and Environment Act 1987 to permanently protect the offset area. The permit holder must pay the reasonable costs of the preparation, execution and registration of the agreement on the certificates of title to the land.
Section 173 Agreement - Road on adjacent property
Such agreement must provide that prior to the issue of a planning permit for the construction of a dwelling on the land, that a new Road over No. 616 Nepean Highway must be constructed to the satisfaction of the Responsible Authority.
Telecommunications - Prior to Statement of Compliance
The Responsible Authority may extend the periods referred to in (a) if a request is made in writing before permit expiry or within six (6) months of the permit expiry date.
If a request is made out of time, the Responsible Authority cannot consider the request and the permit holder will not be able to apply to VCAT for a review of the matter.
APPENDIX 2 - MORE DETAILED RECORD OF THE HEARING PROCESS**
We accept in general that in exercising the jurisdiction under the Planning and Environment Act 1987 the Tribunal is not primarily concerned with or called upon to make determinations as to title or to decide issues under the general law of property.
APPENDIX 3 - TRIBUNAL'S FINDINGS ON MR GALE'S OPTIONS 2-8 (PROVIDED SIMPLY OUT OF COMPLETENESS)
Problem of lack of consent from neighbouring owners for Options 2-8/highly qualified civil engineering evidence of Mr Levenshus/evidence of Mr Turnbull
Mr Levenshus assessed the series of eight "options" most of which were presented to him by Mr Gale. He conceded that the only two viable options were options 1 and 4. And in relation to option 4, he conceded that he has only done a "centreline" analysis and that he has not considered the need for cut, fill and batter of slopes.
noting that Mr Levenshus is not a geotechnical expert and that hence Mr Gale did not present any such expert evidence to us.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing, and the statements of grounds filed; have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] In such discussion, regardless of whether our use of language involves the singular or the plural, any rulings involving a question of law are made by Member Martin alone.
[3] See for example the discussion at [13] and [15] of the Snipe decision, and also at [16] of Curry v Casey CC & Ors [2010] VCAT 2101.
[4] Notably Minister for Energy, Environment and Climate Change v Morton [2017] VSC 774 at [30] and the well known Project Blue Sky decision.
[5] See [5.12] of Mr Peake's post-hearing submission.
[6] This quote taken from page 12 of Mr Peake's written submission at the hearing.
[7] Schedule 2 to the DDO does not allow the creation of lots less than 2,500 sq.m. even where it involves the re-subdivision of existing lots.
[9] These are derived from the Australian Geomechanics Society Landslide Taskforce
[13] We also indicated that we were concerned that there might be other neighbours (beyond the scope of this proceeding) who would want to have a say in any formal resolution of this issue.
[14] Whilst there would not normally be such a long delay until the second batch of hearing days, this was due to logistical difficulties with finding fresh dates that suited all three parties.
[15] Which we have a responsibility to provide under Sections 97 and 98 of the Victorian Civil and Administrative Appeals Tribunal 1998.
Gale