[2025] VCAT 591
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-07-08
Original judgment source is linked above.
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To encourage development that is responsive to the neighbourhood character of the area.
To encourage a diversity of housing types and housing growth particularly in locations offering good access to services and transport.
To allow educational, recreational, religious, community and a limited range of other non-residential uses to serve local community needs in appropriate locations.
The Mallacoota area is located on the shores of Mallacoota Inlet in far East Gippsland. It contains substantial areas of remnant native vegetation and other significant vegetation, including within built up areas.
Vegetation contributes significantly towards aesthetic values of the area and provides for a unique character in a lakeshore setting, resulting in a highly attractive area to both local residents and visitors.
Remnant native vegetation throughout the area, including important examples of Rough-barked Angophora (Angophora floribunda), Red Bloodwood (E. gummifera) and the Mallacoota Gum (or Maiden's Gum, E. globulus ssp Maidenii), is of high conservation value and provides important fauna habitat. The township area of Mallacoota encompasses the Shady Gully reserve, which provides habitat for a number of vulnerable, rare or threatened species, and the remnant warm temperate rainforest of Develins Gulch. Some Ecological Vegetation Classes represented in the Mallacoota township area, such as Swamp Scrub, are rare or threatened on a state and national basis.
(a) An amended materials and colours schedule with more muted tones to suit the local environment.
Site Plan, Number: TP101 Rev 1, dated December 2024. 2. Before the building is occupied, any portion of Council's existing infrastructure damaged as a result of work undertaken on the site or associated with the development must be repaired/reinstated to the satisfaction of the Responsible Authority. 3. Before the building is occupied, all stormwater runoff from the roofed and paved areas, including the main carpark, must be discharged by an underground drainage system connected to an approved point of discharge to the satisfaction of the Responsible Authority.
The responsible authority may consent in writing to vary this requirement.
The tree protection fencing and Tree Protection Zone must be established and maintained in accordance with the following requirements to the satisfaction of the responsible authority:
(a) the tree protection fence must be constructed a detailed within the submitted Arboricultural Report;
(b) the tree protection fence must remain in place until the development is completed;
(c) the Tree Protection Zone must be covered by a 100 mm deep layer of mulch and watered regularly.
The responsible authority may consent in writing to vary any of these requirements.
(a) vehicular or pedestrian access
(b) trenching or soil excavation
(c) storage or dumping of materials, tools, equipment or waste.
The responsible authority may consent in writing to vary any of these requirements.
Department Energy, Environment and Climate Action conditions
(a) The development is not started within two (2) years of the issued date of this permit.
(b) The development is not completed within four (4) years of the issued date of this permit.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] The extract is a part of the full Certificate. The full Certificate is attached at Appendix B.
[4] Or used as part of the adjoining caravan park from time to time.
[5] Source: Construction Impact Assessment with Tree Management Protection Plan, Rigoni Tree Solutions, 20/10/2023.
Frazer
East Gippsland SC [2025] VCAT 591